Project Name
Premier Commercial Office Building
Central Plant Replacement
Project Location
Atlanta, Georgia
Project Team
O...
McKenney’s leveraged its Building Services Division (BSD) relationship to
perform a central plant replacement at a commerc...
The Challenge
The fully occupied, 52-story building with a critical data center needed
new cooling towers, chillers, chill...
The Results
The job was successfully completed—strengthening McKenney’s solid
relationship with the property manager.
Atlanta Office: 1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
Charlotte Office: 3601 Performan...
Building Services Division (BSD) Relationship Paves The Way | Central Plant Replacement in Atlanta, GA
Upcoming SlideShare
Loading in …5
×

Building Services Division (BSD) Relationship Paves The Way | Central Plant Replacement in Atlanta, GA

483 views

Published on

McKenney’s leveraged its Building Services Division (BSD) relationship to perform a central plant replacement at a commercial office center. For more info visit http://www.mckenneys.com.

Published in: Business
  • Be the first to comment

  • Be the first to like this

Building Services Division (BSD) Relationship Paves The Way | Central Plant Replacement in Atlanta, GA

  1. 1. Project Name Premier Commercial Office Building Central Plant Replacement Project Location Atlanta, Georgia Project Team Owner: Global Pulp & Paper Company; Global Life Insurance Company Property Manager: Jones Lang LaSalle Engineer: Conway & Owen General Contractor: McKenney’s, Inc. Specializations Design/Assist Energy Management Pipe Shop Prefab Markets Commercial Offices Central Plants
  2. 2. McKenney’s leveraged its Building Services Division (BSD) relationship to perform a central plant replacement at a commercial office center.
  3. 3. The Challenge The fully occupied, 52-story building with a critical data center needed new cooling towers, chillers, chilled water pumps, condenser water pumps and a building automation system installed without disrupting building operations. Although BSD had serviced the structure for years, the Engineering, Construction and Automation & Control Solutions (ACS) teams were brought in to perform the job. The Solution The proven relationship that BSD had with the property manager opened the door for the other teams. McKenney’s first planned several weekend shutdowns to freeze piping and cut in new isolation valves for the installation of equipment. Then they disassembled the chillers and set up rigging equipment to lower the chillers through the loading dock floor and into the building. All equipment was installed on holidays and weekends to minimize disruptions and prevent additional shutdowns. The content of this document is not intended as an endorsement.
  4. 4. The Results The job was successfully completed—strengthening McKenney’s solid relationship with the property manager.
  5. 5. Atlanta Office: 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 Charlotte Office: 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 sales@mckenneys.com www.mckenneys.com

×