2
Curriculum Vitae                   3
Education                                                                                                                 ...
Job Experiences:                   2011 – He is Teacher’s assistant at the Master in “Architecture of the Yacht and Ship”,...
2007 – Collaborate with the architect. Tiziano Inguanotto to the structural design of multi-                          purp...
Office Software skills:                            Microsoft Word, Microsoft Word perfect, Microsoft Works, Adobe Acrobat ...
8
My Works activity9
10
My Master’s Thesis in     Yacht Style & Design           "2009".11
Università degli Studi di  Trieste  Master School in Yacht Style  And Design  2008 – 2009  Thesis: “Colombo 37 all days”  ...
Owner Cabin13
Collaboration with  Studio Nuvolari&Lenard  PJ 150  2008 – 2009  Project assistant, 3d Modeller  and Renders.Production of...
Owner Cabin15
Collaboration with  Studio Nuvolari&Lenard  PJ 135  2008 – 2009  Project assistant, 3d Modeller  and Renders.Production of...
Owner Cabin17
18
My Master’s degree Thesis              200719
Bechlor Thesis in Architecture  design: “Venetian arsenals in  Heraklion city”.  workgroup:  Massimo Catinella-Leonidas Pa...
the Roof simplification               process                                         Scheme of the structural            ...
22
My Competions23
Seoul Grand Park competition                           24
Honorable mention     certificate     Comment on selected entries     1. An eco-friendly sustainable park balanced        ...
The “Seoul Grand Park  competition”  Project’s name:  “Dreaming in the Nature”  ArkaAssociati’s Venice’s Project          ...
27
international design ideas competition:     for Liantang/Heung Yuen Wai BoundaryControl Point Passenger Terminal Building ...
Awarded finalist Prize     certificate     Adjudication Guidelines     All Entries will be judged in accordance     with t...
In Collaboration with the ar-  chitects: Seihyung Cho, Fran-  cesco Scarpa, and Tang Ju Nin,  at the “international design...
Bird’s View from Hong Kong’s Boundary31
32
My Office activity33
Project of a cottage site in  Milan Lombardia (Italy)  Project:   Giampiero Brioni  Graphic adaption:   Massimo Catinella ...
37
Restyling and extension for  the “Hotel ai Pini” Venice  (mestre) Italy.  Project:   Cho Seihyung   Massimo Catinella   Fr...
Bird eye View     view of the Bar from the Terracce     view of the Swimming pool from the Terracce39
Project of Biomass Factory Seul (Korea) project:  ArKaAssociati Team:  Seihyung Cho  Marco Zanatta  Massimo Catinella Grap...
North View            South ViewEast View               West Viewbirds eye Night view41
Competition to design a lin-  king structure beetwen two bu-  ildings in the middle of the  Senior Center in Chioggia (Ve-...
View from the aerial                            View inside the                                                     connec...
44
My external activitiy45
Digital Fenice Theater” exhibition  in Venice  2005  Collaborators  Massimo Catinella, Roberto  Moro Diego Tonus  Professo...
47
48
The power of the passion survive everywere,       and i never forget the spark that keeps       alive my enthusiasm and my...
50
51
52
53
54
55
56
57
Portfolio Max
Portfolio Max
Portfolio Max
Portfolio Max
Portfolio Max
Upcoming SlideShare
Loading in …5
×

Portfolio Max

706 views

Published on

Selected last Works

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
706
On SlideShare
0
From Embeds
0
Number of Embeds
21
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Portfolio Max

  1. 1. 2
  2. 2. Curriculum Vitae 3
  3. 3. Education 2008/2009 – Master in “Yacht style & Design”, at the Architecture University in Trieste, Italy. 2006/2007 – Master degree in Architecture at “Iuav” University in Venice, Italy, with a Thesis in Architecture design: “Venetian arsenals in Heraklion city”. Workgroup: Massimo Catinella-Leonidas Paterakis Tutor: Roberta Albiero, Associate professor in architecture design at University Iuav Co-tutor: Giuseppe Biasi, Phd in Urbanism design.Con la presente autorizzo, ai sensi del Decreto Legislativo 30 giugno 2003, n. 196 , al trattamento, archivia- 2000/2001 – “Erasmus” Bauhaus-Universität Weimar Architecturezione ed eventuale consegna a terzi dei dati personali da me indicati nel presente documento 1993/1994 – Università degli Studi di Palermo Architecture 1994/1994 – Corso di fumetto-Cartoon Workshop Cartoons and illustration Summer course: Perugia (italy) Teachers were: Angese (Cartoonist) Jacopo Fò (Actor) Cinzia Leone Cartoonist) 1988 – 1993 – Secondary School at The Art Institute of Siracusa, Italy. Specialization:Painting Professional and formative profile: 2008/2009 – Attendance at the Master in “Yacht style & Design”, at the Architecture Uni- versity in Trieste, Italy. 2002 – Attendance at the Workshop: “Acquisition and elaboration of 3D Laser Scanner data”, organized by University of Rome “La Sapienza”, in 8. Biennale of Architecture in Venice, “The Next”. 4
  4. 4. Job Experiences: 2011 – He is Teacher’s assistant at the Master in “Architecture of the Yacht and Ship”, “Architettura della Nave dello Yacht”, at the Iuav University of Venice, where he holds classes of mathematics representation, through applications and exercises carried out with the software Rhinoceros 4, produced by McNeel. Furthermore he takes care the new publication for the next edition of the Master “Architecture of Yacht and Ship” 2010-2011. My role: Teacher’s assistant 2010/2011 – Collaboration with the architects: Seihyung Cho, Francesco Scarpa, and Tang Ju Nin, at the “International design ideas competition for Liantang/Heung Yuen Wai Boundary Control Point Passenger Terminal Building”, where they after a long selection, (86 participatings groups) were ranked among the first ten “FINALIST ENTRIES”. We have got the ninth place in the final rankings. My role: Design, concept collaboration and graphic design. 2009/2010 – Collaboration with the architects: Anna Boscolo, Seihyung Cho and Studio ArkaAssociati at competition to design a linking structure beetwen two buildings in the middle of the Senior Center in Chioggia (Venice). The project is still in construction. My role: Design collaboration and graphic design 2009/2010 – Collaboration with Studio ArkaAssociati for the “Seoul Grand Park competition”, were they achieved the Honor Award, like prize for the quality of the project’s concept. My role: Design, concept collaboration and graphic design. 2008/2009 – Collaboration like Yacht Interior Designer at “Nuvolari & Lenard Studio”, for the preparation of 3D Models, Photo-realistic Renderings and Animations. My role: Design collaboration and graphic design 2008 – Collaboration with Innova Technology Solutions The work consist in the processing (with diverse softwares and methods), of clouds points of an specific object or context., generated from the scanners 3D (RIEGL Laser Measurement Systems), My role: Data Post processing. 2008 – Collaboration for “Salottobuono” editorial, like digital illustrator for “Riders”, motorcycles journal. My role: Design collaboration and graphic design. 2007 – Collaboration in exhibition design for “Swiss Pavilion”, at 52nd Biennale of Art in Venice: “Think with the Senses – Feel with the Mind”. My role: Assistant to the construction of the Pavillon structure. 5
  5. 5. 2007 – Collaborate with the architect. Tiziano Inguanotto to the structural design of multi- purpose building “La Vela”, Via Rovereto (Via Miranese), Mestre (Venice), owned by Mr. Giancarlo Miotto. My role: Design collaboration and graphic design. 2007 – Collaborate with the architect. Tiziano Inguanotto to the design and planning for Two commercial buildings for the average distribution - Cassacco (Udine) My role: Design collaboration and graphic design. 2007 – Collaboration like architectural designer with “Arbur Italia s.r.l. Studio”. My role: Design collaboration and graphic design. 2005 – Collaboration with Camillo Trevisan and Massimiliano Ciammaichella, professors in Digital Representation at Iuav University, for “Digital Fenice Theater” exhibition in Venice. My role: Assistant to the construction of the exhibitionAcademic and research activity: 2005 – Partecipation at the “Architectural Design Workshop” (one month), organized by the Architecture University in Havana, Cuba. 2005 – Attendance at the Sculpture Workshop: “Sculpture between Metal and Alchemy”, organized by Lorenzo Burchiellaro, at Iuav University. 2002 – Attendance at the Workshop: “Acquisition and elaboration of 3D Laser Scanner data”, organized by University of Rome “La Sapienza”, in 8. Biennale of Architecture in Venice, “The Next”. Informatic skills: Hardware and Software, installation and configuration. 3D Software skills: Autocad, Rhinoceros 3D v.3 and v.4, Sketch Up, Solid Works (Basic), Revit (Basic), Cinema 4D R12, Think 3, 3D Studio Max (basic) and Zbrush. Plug-in: Maxwell render, Cinema 4D, Flamingo, Vray 2D Software skills: Autocad, Adobe Illustrator, Adobe Photoshop, Adobe InDesign, Adobe Lightroom. 6
  6. 6. Office Software skills: Microsoft Word, Microsoft Word perfect, Microsoft Works, Adobe Acrobat Professional, Adobe Lightroom. Language skills: Italian: native tongue. German: Intermediate. English: intermediate. Spanish: lower intermediate.Additional information: I love Drawing, I am constantly divided between comics and architecture ... a war in which the hand is always driven from free drawing, the inventiveness of the characters, the adventures that i lived in front of that piece of paper, place scene of incredible carnage, and continuous fun thinking about what I felt I was slowly trying to emerge. Interest: Architecture, Design, Hand drawing, Chess, Films Sports Played: Swimming, Waterpolo, Jogging, Volley, Mountain BikingPersonal characteristics: As an architect, I am an expert at 3D modelling and rendering images. I have a great passion for representation: ranging from simple handmade sketches to highly technical digitalized designs and animation. I maintain a flexible and approachable attitude, as I quickly adapt to any work environment. I like to be a member of a teams. Address: Massimo Catinella via B. Galuppi n. 10 30171 Mestre – Venezia Italy. E-mail: barbarossa74@gmail.com architetto.massimo.catinella@gmail.com Telephone Number: +39 340 40 30 340 Skype: barbarossa74_ 7
  7. 7. 8
  8. 8. My Works activity9
  9. 9. 10
  10. 10. My Master’s Thesis in Yacht Style & Design "2009".11
  11. 11. Università degli Studi di Trieste Master School in Yacht Style And Design 2008 – 2009 Thesis: “Colombo 37 all days” length f.t. 12,69 m Tutor of Thesis: Prof. Carmelo Chiaramonte Practical and theoretical training in the field of ship design, with particular empha- sis on modeling techniques and yacht design. preliminary sketches and and Ren-My master’s thesis, start from the mock-up of deringsthe yacht “colombo 37”.Aiming to reproject his interior, starting fromthe sketcthes till the 3d model. Longitudinal Section with color tests 12
  12. 12. Owner Cabin13
  13. 13. Collaboration with Studio Nuvolari&Lenard PJ 150 2008 – 2009 Project assistant, 3d Modeller and Renders.Production of Interiors images for Palmer John-son 150. (PJ 150)i have done the complete 3d model of the CabinOwner and Guest. guest Cabin 14
  14. 14. Owner Cabin15
  15. 15. Collaboration with Studio Nuvolari&Lenard PJ 135 2008 – 2009 Project assistant, 3d Modeller and Renders.Production of Interiors images for Palmer John-son 135. (PJ 135)i have done the complete 3d model of the CabinOwner and Guest. guest Cabin 16
  16. 16. Owner Cabin17
  17. 17. 18
  18. 18. My Master’s degree Thesis 200719
  19. 19. Bechlor Thesis in Architecture design: “Venetian arsenals in Heraklion city”. workgroup: Massimo Catinella-Leonidas Patera- kis Tutor: Roberta Albiero, Associate professor in architecture design at University Iuav Co-tutor: Giuseppe Biasi, Phd in Urbanism design. 1972-Today Site’s Urban area of in- trasformation in tervention: different Times Bulding to demolishTrasformationDeformation: Conversion of theancient Venetian Arsenals in to a place, formeeting and Walks, for relaunch the Heralkion’s Pedestriansport and its neighborhood. routes Viability: Primary and PERCORSI Paths: Exposition ZONA ESPOSIZIONI secondary BAR road, Bar Tram historical presences PERCORSI Viability: Primary and secondary pedestrian areasAim of the project is read and reinterpret thestory around the Arsenals and propose a dynamiclecture of the pre-existent grid.By adding external modificators force generatedfrom site self, the site modify its apparenceto become different and at same time the same.That because nothing is delete but only defor-med, by the selected pointforce. 20
  20. 20. the Roof simplification process Scheme of the structural elements of the coverAncient Griddeformationsequence 21
  21. 21. 22
  22. 22. My Competions23
  23. 23. Seoul Grand Park competition 24
  24. 24. Honorable mention certificate Comment on selected entries 1. An eco-friendly sustainable park balanced with fun and entertainment will attract visitors for along time - An artificial theme park and man made attractions can be easily changed according to a trend so that it can be easily tired and wear out quickly. The selected entries consider those factors appropriately. 2. Not only are visitors’ activities, live experience, interactive, and fun elements vital to encourage people to visit, it also lengthen stay of visitors. Eventually it helps to increase revenue. The selected entries map out strategies to encourage visits and increase income. 3. The selected entries introduced a lively entry area with retail, food/beverage and entertainment.It presents that visitors experience urban entertainment at the entry area, too. 4. The selected entries introduce a friendly waterfront environment and water feature at the existing lake area. 5. The selected entries consider a circulation to connect and relate each section of the park. The selected entries actively consider a nighttime operation and seasonality. 6. The selected entries present a creative zoo design and it’s operation plan. They also propose a phased development which meets economic plan.25
  25. 25. The “Seoul Grand Park competition” Project’s name: “Dreaming in the Nature” ArkaAssociati’s Venice’s Project View Waterfront Team: -Cho Seihyung -Massimo Catinella -Francesco Scarpa -Michele Carrano Collaborators: -KacicLidén Landscape Architects Triste Italy -Barbara Mihelic ZOO Ljubljana Slovenia -Jeong Taeksoo - Seoul -Giampiero Brioni Milan ItalySeoul Grand Park, a 560-hectare destinationwith an existing zoo and an amusement park, hasprovided an important entertainment and recrea-tional function to the community for thirty ye-ars. The Seoul Metropolitan Government-sponso-red competition drew 21 entries from around theworld, with ideas to improve the public spacefor citizens and better position the site as aregional and international tourist destination.With the architecture Studio ArkaAssociati ihave collaborated for the International designcompetition for redevelopment of the “SeoulGrand Park.”The project involves the construction of a new preliminary sketches and images of the area. Sketches of the Bungalowslayout of 700 acres of parkland, with the re-design of the theme park, the zoo, the parkmuseum, City Park and the construction of newhigh technology.The Project won a “Honorable Mention” 26 first functional plans: final rendering Transport, Logistics, Thematic areas
  26. 26. 27
  27. 27. international design ideas competition: for Liantang/Heung Yuen Wai BoundaryControl Point Passenger Terminal Building 28
  28. 28. Awarded finalist Prize certificate Adjudication Guidelines All Entries will be judged in accordance with the broad adjudication guidelines as interpreted by the Jury. The decisions of the Jury shall be final and binding on all parties concerned and decisions cannot be appealed against. Participants do not have the right to request for access to the Jury’s comments or records on the adjudication. The broad adjudication guidelines are : Professional Group A. Addressing the objectives B. Harmonization with the neighbourhood C. Aesthetics and Identity Icon D. Environmental Friendliness (including Sustainability, Green Building and Energy Efficiency) E. Innovation and Creativity F. Functionality, Effectiveness and Buildability Open Group A. Addressing the objectives B. Harmonization with the neighbourhood C. Aesthetics and Identity Icon D. Environmental Friendliness (including Sustainability, Green Building and Energy Efficiency) E. Innovation and Creativity29
  29. 29. In Collaboration with the ar- chitects: Seihyung Cho, Fran- cesco Scarpa, and Tang Ju Nin, at the “international design ideas competition for Lian- tang/Heung Yuen Wai Boundary Control Point Passenger Ter- minal Building”, they after a long selection were ranked among the first ten “finalist entries. Project’s name: “The Gate” View from the Honk Kong’s Boundary Project: Principal Project elements Tang Ju Nin Cho Seihyung Massimo Catinella Francesco Scarpa v Upper Floor Corridor & Bridge Graphic adaption: pededestrian link Seihyung Cho Massimo Catinella http://www.lthywbcp-design.hk/mainpage. External shape Structural Grid offices and Glass & Solar View from the Shenzen’s Boundary services Panels Roof The Project aims to:• reduce travelling time between HK and SZEast, facilitate future development in theseareas and extend the economic hinterland of HKand SZ;• re-distribute the cross-boundary trafficfrom SZ to New Territories East, resulting inenhancement of the overall operational effi-ciency, handling capacity and quality of servi-ce for the BCPs in HK and SZ;• and satisfy the urban layout design require-ment in SZ East, in order to fulfill the SMPG’s“East-in-east-out” traffic planning principlefor the cross-boundary traffic. The International Ideas Competition is a sin-gle-stage open competition, aiming to collectunique and innovative design ideas and conceptswhich should achieve the followings :• an architectural design that blends wellinto the surrounding environment;• a consistent image and style for the Passenger Terminal Building on both Hong Kong (HK)and Shenzhen (SZ) sides; and• a new and “people-oriented” boundary con-trol point design that illustrates the intimatecollaboration between HK and SZ under the “se-parate-location” arrangement of immigration andcustoms operation. inside view 30
  30. 30. Bird’s View from Hong Kong’s Boundary31
  31. 31. 32
  32. 32. My Office activity33
  33. 33. Project of a cottage site in Milan Lombardia (Italy) Project: Giampiero Brioni Graphic adaption: Massimo Catinella North view West viewproject’s Features is the Criteria of a thisproject was basically conceived after sustai-nibility criteria, with the aim to avoid bothheat loss in winter and overheating in summer. South view East view 36
  34. 34. 37
  35. 35. Restyling and extension for the “Hotel ai Pini” Venice (mestre) Italy. Project: Cho Seihyung Massimo Catinella Francesco Scarpa Graphic adaption: Seihyung Cho Massimo Catinella Front ViewThis Proposal for a Restylig project of a Hotellocated in Mestre (Venice), aim to improve theaestetic of the edifice and the internalexter-nal functionality with a new block of rooms, anenlargement of the restaurant, the Terrace andthe entrance hall.Surrounded to a thick presence of tree and na-ture we tried to keep it, maintaining the rightrelationship between the parts. view of additional parts in evidence 38
  36. 36. Bird eye View view of the Bar from the Terracce view of the Swimming pool from the Terracce39
  37. 37. Project of Biomass Factory Seul (Korea) project: ArKaAssociati Team: Seihyung Cho Marco Zanatta Massimo Catinella Graphic adaption: Seihyung Cho Massimo CatinellaBiomass Factory 40
  38. 38. North View South ViewEast View West Viewbirds eye Night view41
  39. 39. Competition to design a lin- king structure beetwen two bu- ildings in the middle of the Senior Center in Chioggia (Ve- nice). The project is still in construction. Project Team: Anna Boscolo Massimo Catinella Seihyung Cho Graphic adaption: Massimo Catinella Seihyung Cho General Plan With internal and external path. The Structural Grid: Concept and mobilities diagrams Subdivision of the floorsAs suggested by the indications of the Invi-tation to Bid, the project considers a hypo-thetical structural grid as a guideline, whichleaves it unchanged buildings and vehicular andpedestrian paths.This structure approached the residence “Arco-baleno”, becoming a volume that is suspended toallow the Aerial Connection between the exi-sting buildings “Girasole”, and down to earthtowards the main garden to give shape to thenew living area. Extension of the Senior Center: The Aerial Connection (C) between the residential zone “Arcobaleno”(A) and the service Extension of the Senior Center: zone “Girasole”(B). From new the “Living room”. B A C 42
  40. 40. View from the aerial View inside the connection aerial connection View from the Garden View inside the livingroom bird’s eye view of the whole senior Center View of the living room from the garden Detailed Groundfloor of the Livingroom View from the main entrance Section of the aerial coonnection Section along the structural grid till the living room43
  41. 41. 44
  42. 42. My external activitiy45
  43. 43. Digital Fenice Theater” exhibition in Venice 2005 Collaborators Massimo Catinella, Roberto Moro Diego Tonus Professors: Camilllo trevisan, Massimiliano ciammaichella. http://www.camillotrevisan.it/ fenice/fenice_digitale.htmCollaboration with Camillo Trevisan and Mas-similiano Ciammaichella, professors in DigitalRepresentation at Iuav University, for “DigitalFenice Theater” exhibition in Venice.My role: Assistant to the construction of theexhibition 46
  44. 44. 47
  45. 45. 48
  46. 46. The power of the passion survive everywere, and i never forget the spark that keeps alive my enthusiasm and my creativeness My Sketches49
  47. 47. 50
  48. 48. 51
  49. 49. 52
  50. 50. 53
  51. 51. 54
  52. 52. 55
  53. 53. 56
  54. 54. 57

×