SlideShare a Scribd company logo
1 of 28
Download to read offline
FG
MDIA
Contents
V1 Raising up theTime
V2 Dwelling Place
V3 AllThings New
InsideView
Time Events
Products Costs
Assets
T3
T4
TP
From “T Pluribus Unum,” our last paper
To Do
Slide5
Slide 6 Slide 3
Slide 2 T1 T2 T3 T4
TP
&
V1: Our Project is to decide between various instances of
our project timeline related to the production and the
outcome of events. Our Plan has many nuanced
circumstances in it. Events are to be discussed inV2,V3.
Notice that until we actually write the product to a customer
site and then are able to achieve it remotely, we have not
acquired the full ark custom model. And only then can we
produce the more advanced products. Remember that we
are studying the production of assets and intellectual
properties in the Ark Mode of Plait Glass.
Ω
824.881 slide 16
See V2
195,988
Payback
More Carriage
Burden See V3
EventsTimeline Incomplete
18L SA SD
6L Slide 4
Pre-Production
We have not studied
production costs for new
products yet.
Our Sum Production is
within Bridge Parameters
corresponding to 82488
824.881 slide 16
Correction after analysis slide
26 and second correction not
shown, see also slide 26
Changed slide 26
18L SA SD
6L
Timeline 1
Green Energy and its
advancing requirement is
the first primary product
with local window
property testing
Timeline 2
The beginning of Ark wheel
assembly has localized
access through the supply
chain and product
replicationWindow
Timeline 3
Site Access allows repair,
maintenance and
upgrade with more
advanced writing of
instance applications
Timeline 4
Remote Development
includesAppliances
branch remotely through
PortalAccess and IP
Warehouse Assimilation
7/30/2022 BrijConsulting, LLC Jean Marshall 4
T1
T2
T3
T4
Year 3.6 Year 34.4
Year 10.4 Year 44.4
.09
8.4 42.6
48.9
The Lens Path and the Critical
Path on slide 4 are related but
periodically weighted to using
wave for producing glass only
Glass
Complexity
M2
M3
M4
M1
M2
M3
M4
M1
M2
M3
M4
M1
MILESTONET3-M1 MILESTONET2-M1 MILESTONET1-M1
Streamline Warehouse:
Contiguous Instances
MILESTONET3-M2
Wave and Lens: to Plait and make
Scalable Configurations
MILESTONET2-M2
Streamline Instances: Deciduous
MILESTONET1-M2
Branch Mobility
MILESTONET3-M3 MILESTONET2-M3
Utility Wall
MILESTONET1-M3
MILESTONET3-M4 MILESTONET2-M4
More Complex Threads and
Encryptions
MILESTONET1-M4
5 Instances of the Incumbent Load
producing complex Products with
T&MM Mu Sic
T3 T2 T1
TP
T4
Wall and Attribute, Pipes and
Plaits
Forms and Secants: Engineering
Storyboard and Glass Concept
Machine, including Mix
Thread and Encryptions: Two Step
Compositions
Green Energy and Wall Utility Design
MILESTONE MILESTONE
Branch Capability and Partnering
Build Cases, Appliances and
Conveyances
Land/Wall T-pipes
Year 49.5
Year 3.6
Year 10.4 Year 34.4 Year 44.4
9,143
9,683 26,181 30,824
1,723
Value in Billions
464/2=232 tan
1
From “T Pluribus Unum”
0
20
40
60
80
100
120
140
160
180
1 2
lens/pipe
'Factors', 'CriticalYear' by 'lens/pipe'
Series1 Series2 Series3 Series4 Series5
28 x 2 forms and secants
[SA + SD]
T1
T2
T3
T4
ω
ω
1
2
3
4
5
The Partner Branch comes after the 5 instances
of the incumbent product is achieved and full
remote Production is assimilated
T2
T1
T3
T4
TP
TP
Shift fromT2 toT1
T3 T2 T1
TP
T4
ε1
ε1
2.3644-2.35=
.0144W
B
L
A
Summary
2.3644-2.126=
.2384/2= .1192 IB
IB
IB
713.52-713.26= .26
50+21 = 71Var
Rate
694/3=231 tan
Site Development is Remote Requirement,
the critical Tan Line, per “T Pluribus Unum”
2
2
2795.9-2100= 695.9 – 694.8 = .7 Remote
Capability relies on Lens Completion
TP Partnering
Requirement depends on
Variable (Unit
Completion) of All Work
23 x 2
Lens
Split tan line = 23 variable lens || 644 All Cost Interior Units
64 x 2 = 128 chi factor
LC
LC
557
P 522
ROA
Cost Study for Path Demarcation
Slide8 Slide11
Slide 11
P
P
Wt. Shift
AssociatedViews
im
48.48 + .0535 x 2 = 48.5864 Critical Path
200x
See “Supply Side Portfolio”
From “T Pluribus Unum”
Split
tan
line
6.43 x 10
z
X 10
2.3644
New Load
Slide 9
See portion ofTable Appendix I
1.20 weighting of fixed to variable shifts
557
T’s
522 + 21 = 543 ROA
T’s
Lens Contribution
Future
Sqrt=
Tan =
Sqrt =
Lens
Lens
^2
Future
See portion ofTable Appendix I
Scale used in Slide 8
The Site Access Cost more directly
approximates the Bridge Cost
/.004=7.1995
B
L
A
B L
A
T’s
z2
Appendix I From “T Pluribus Unum”
Used in Slide 7
Used in slide 6
2
4
From Study it appears
that the (4) Interior
Margin and the (2)
Center Metric
indicative of Branch
Timing, relate to units
and costs described as
variable. We have
attributed the (4)
Interior Margin to the
Forms and Secants and
the (2) Center to the
Lens and Pipes.
Noted:
Plan
Attainment
FromT&MM
Appendix II
The Stairway to Heaven
Most-High
mystery
enshrined in the child Mary
the fifteen stairs
angels ascending and descending
house of God and the
portal of heaven.
The hidden City will appear, Rev. 21
713.52-712.07= 1.45 || Payback 194
Shift from the Digital Path
824.881 slide 3
Ω
Ω Omega ends are
Secant ends
Note:Our Pre-production is not ending on a
finished Omega (our Outcome is incomplete)
Ω
412 slide 21
CURVED LENS
and CRITICAL
PATH
NEGOTIATING
THE CURVE
FINDING
SIGNIFICANT
EVENTS
P-
Model
Future notes include:
1. Find the carriage burden for
the incumbent load
2. Study the bifurcation of the
curve; we had worked with
bifurcation processes
3. Path
Markers
4. Hidden
Margins
Bifurcating
.02424 to
.020402 x 2 =
.040804
hypotenuse
From “T Pluribus Unum”
T’s
Path Markers
Bifurcation occurs to meet
external demand
R
y = 8129.5e0.0856x
R² = 0.2884
y = 2972.5x2 - 23132x + 52939
R² = 0.414
0 20000 40000 60000 80000 100000
Milestones
Year 3.6
Year 10.4
Year 34.4
Year 44.4
Year 49.5
Year 50+
Sum Productions
T4
T3
T2
T1
TP
Ne
w
All
Achieved New Products
Thread and Encryptions Forms and Secants
Wave and Lens Wall, Pipes, Plaits
Expon. (Achieved) Poly. (Achieved)
adjusted
y = 7968.8e0.0957x
R² = 0.2972
y = 2995.1x2 - 23270x + 53131
R² = 0.4195
0 20000 40000 60000 80000 100000
Milestones
Year 3.6
Year 10.4
Year 34.4
Year 44.4
Year 49.5
Year 50+
Sum Productions
T4
T3
T2
T1
TP
Ne
w
All
Milestone Plan
R
Final
Confirmed in
our Final
MilestoneTable
on Slide 27
graphically the
450 units and
Secant
Production
It turns out that the
future products depend on all
aspects
Ω
The Candle Stone
path shows more
ROA gained
From “Portal Projects”
Does this ROA
matter?
Yes, integral
Contiguous Production
106/
3.95
Weight of the Path
Form divided
Single form Margin
remainds, part of the constructed but unfinished
product on the books– i.e., unfinished Scrum
The first question to ask
when utilizing secant
information is are the
instances contiguous?
If not, they can not be
compared.They must be
truly adjacent in a fashion
that allows a union plait.
To do: Discuss
The
analogous
process
leads into
the next
timeline
and cannot
be ignored
2646-2684=-38 var. cost
ulterior
(ʌlˈtɪərɪə) adj1. lying beneath or beyond what is revealed, evident, or supposed: ulterior motives.
2. succeeding, subsequent, or later
3. lying beyond a certain line or point
The majority of the significant events happen in T1 and T2
To Do: Discuss
TEST
T’s
412 slide 16
Retest
x
377 x 2 = 754
+3 gate units
R
From “Supply Side Portfolio”
.7565 x 1000
(See Final Production Roadmap, slide 27)
(Incl. for next process)
forward looking statements
Incumbency of process
Events are timed with Push Product (i.e., Secants)
Lens Power amplitude
starting set
ulterior
(ʌlˈtɪərɪə) adj1. lying beneath or beyond what is revealed, evident, or supposed: ulterior motives.
2. succeeding, subsequent, or later
3. lying beyond a certain line or point
The major significant events happen in T1 and T2
To Do: Discuss
278 note
In our final adjustment we
made the correction for
partnering
Ω
824.881 slide 16 exceeded
Ω
Coming up,
See “Glass
Cars and
New Ark
Product
Map;” we
will use this
Roadmap to
get started
Next
1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of
Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and
motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and view glass
media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined,
Logos
7. Art of the Science: What can be made? Assimilation discussed, look at basic
product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue
paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe
Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational
Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise
up a Digital Portal Production System using appliances gained through Plait Object
and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass
and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering
process
14. Interpolative Scope: Use of a Demand and Production Scope for building and
delivery of product, learning to specify material, looking for union of Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to depict
…Motivated by sound it creates a means by sound to cascade light for safe and
wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load
value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue
paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old
vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-
for-wave-and-lens-assimilationpdf
New
This Paper: #47
Dimensional Building in Ark Design
Product Roadmap

More Related Content

Similar to Dimensional Building in Ark Design V1, V2, V3.pdf

Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdfPartners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdfBrij Consulting, LLC
 
Comments for Simulations Part III.pdf
Comments for Simulations Part III.pdfComments for Simulations Part III.pdf
Comments for Simulations Part III.pdfJeanMarshall8
 
Engineering Objects in Plait Glass V3 Loading the Gate
Engineering Objects in Plait Glass V3 Loading the GateEngineering Objects in Plait Glass V3 Loading the Gate
Engineering Objects in Plait Glass V3 Loading the GateBrij Consulting, LLC
 
Engineering Objects in Plait Glass V2 Keys and Encryption
Engineering Objects in Plait Glass V2 Keys and EncryptionEngineering Objects in Plait Glass V2 Keys and Encryption
Engineering Objects in Plait Glass V2 Keys and EncryptionBrij Consulting, LLC
 
Simulations Part III.pdf
Simulations Part III.pdfSimulations Part III.pdf
Simulations Part III.pdfJeanMarshall8
 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfBrij Consulting, LLC
 
Engineering Objects in Plait Glass V2 Keys and Encryption Amend
Engineering Objects in Plait Glass V2 Keys and Encryption AmendEngineering Objects in Plait Glass V2 Keys and Encryption Amend
Engineering Objects in Plait Glass V2 Keys and Encryption AmendBrij Consulting, LLC
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdfBrij Consulting, LLC
 
The Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationThe Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationBrij Consulting, LLC
 
Scope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdfScope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdfBrij Consulting, LLC
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfJeanMarshall8
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBrij Consulting, LLC
 
Summary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfSummary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfBrij Consulting, LLC
 
Ark in Glass V1 Schema in Ark Mode Simulation
Ark in Glass V1 Schema in Ark Mode SimulationArk in Glass V1 Schema in Ark Mode Simulation
Ark in Glass V1 Schema in Ark Mode SimulationBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 

Similar to Dimensional Building in Ark Design V1, V2, V3.pdf (20)

Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdfPartners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
 
Comments for Simulations Part III.pdf
Comments for Simulations Part III.pdfComments for Simulations Part III.pdf
Comments for Simulations Part III.pdf
 
Engineering Objects in Plait Glass V3 Loading the Gate
Engineering Objects in Plait Glass V3 Loading the GateEngineering Objects in Plait Glass V3 Loading the Gate
Engineering Objects in Plait Glass V3 Loading the Gate
 
Engineering Objects in Plait Glass V2 Keys and Encryption
Engineering Objects in Plait Glass V2 Keys and EncryptionEngineering Objects in Plait Glass V2 Keys and Encryption
Engineering Objects in Plait Glass V2 Keys and Encryption
 
Simulations Part III.pdf
Simulations Part III.pdfSimulations Part III.pdf
Simulations Part III.pdf
 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdf
 
Engineering Objects in Plait Glass V2 Keys and Encryption Amend
Engineering Objects in Plait Glass V2 Keys and Encryption AmendEngineering Objects in Plait Glass V2 Keys and Encryption Amend
Engineering Objects in Plait Glass V2 Keys and Encryption Amend
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
 
The Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationThe Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit Assimilation
 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
 
Scope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdfScope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdf
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
 
Summary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfSummary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdf
 
Ark in Glass V1 Schema in Ark Mode Simulation
Ark in Glass V1 Schema in Ark Mode SimulationArk in Glass V1 Schema in Ark Mode Simulation
Ark in Glass V1 Schema in Ark Mode Simulation
 
Glass Big Push Part I.pdf
Glass Big Push  Part I.pdfGlass Big Push  Part I.pdf
Glass Big Push Part I.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 

More from Brij Consulting, LLC

Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Comments on Simulations Project.pdf
Comments on Simulations Project.pdfComments on Simulations Project.pdf
Comments on Simulations Project.pdfBrij Consulting, LLC
 
Simulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfSimulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfBrij Consulting, LLC
 

More from Brij Consulting, LLC (20)

Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdf
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Comments on Simulations Project.pdf
Comments on Simulations Project.pdfComments on Simulations Project.pdf
Comments on Simulations Project.pdf
 
Simulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfSimulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdf
 

Recently uploaded

8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 

Recently uploaded (20)

8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 

Dimensional Building in Ark Design V1, V2, V3.pdf

  • 1. FG MDIA Contents V1 Raising up theTime V2 Dwelling Place V3 AllThings New InsideView
  • 2. Time Events Products Costs Assets T3 T4 TP From “T Pluribus Unum,” our last paper To Do Slide5 Slide 6 Slide 3 Slide 2 T1 T2 T3 T4 TP & V1: Our Project is to decide between various instances of our project timeline related to the production and the outcome of events. Our Plan has many nuanced circumstances in it. Events are to be discussed inV2,V3. Notice that until we actually write the product to a customer site and then are able to achieve it remotely, we have not acquired the full ark custom model. And only then can we produce the more advanced products. Remember that we are studying the production of assets and intellectual properties in the Ark Mode of Plait Glass. Ω 824.881 slide 16 See V2 195,988 Payback More Carriage Burden See V3 EventsTimeline Incomplete
  • 3. 18L SA SD 6L Slide 4 Pre-Production We have not studied production costs for new products yet. Our Sum Production is within Bridge Parameters corresponding to 82488 824.881 slide 16 Correction after analysis slide 26 and second correction not shown, see also slide 26 Changed slide 26
  • 4. 18L SA SD 6L Timeline 1 Green Energy and its advancing requirement is the first primary product with local window property testing Timeline 2 The beginning of Ark wheel assembly has localized access through the supply chain and product replicationWindow Timeline 3 Site Access allows repair, maintenance and upgrade with more advanced writing of instance applications Timeline 4 Remote Development includesAppliances branch remotely through PortalAccess and IP Warehouse Assimilation 7/30/2022 BrijConsulting, LLC Jean Marshall 4 T1 T2 T3 T4 Year 3.6 Year 34.4 Year 10.4 Year 44.4 .09 8.4 42.6 48.9 The Lens Path and the Critical Path on slide 4 are related but periodically weighted to using wave for producing glass only Glass Complexity
  • 5. M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 MILESTONET3-M1 MILESTONET2-M1 MILESTONET1-M1 Streamline Warehouse: Contiguous Instances MILESTONET3-M2 Wave and Lens: to Plait and make Scalable Configurations MILESTONET2-M2 Streamline Instances: Deciduous MILESTONET1-M2 Branch Mobility MILESTONET3-M3 MILESTONET2-M3 Utility Wall MILESTONET1-M3 MILESTONET3-M4 MILESTONET2-M4 More Complex Threads and Encryptions MILESTONET1-M4 5 Instances of the Incumbent Load producing complex Products with T&MM Mu Sic T3 T2 T1 TP T4 Wall and Attribute, Pipes and Plaits Forms and Secants: Engineering Storyboard and Glass Concept Machine, including Mix Thread and Encryptions: Two Step Compositions Green Energy and Wall Utility Design MILESTONE MILESTONE Branch Capability and Partnering Build Cases, Appliances and Conveyances Land/Wall T-pipes Year 49.5 Year 3.6 Year 10.4 Year 34.4 Year 44.4 9,143 9,683 26,181 30,824 1,723
  • 6. Value in Billions 464/2=232 tan 1 From “T Pluribus Unum”
  • 7. 0 20 40 60 80 100 120 140 160 180 1 2 lens/pipe 'Factors', 'CriticalYear' by 'lens/pipe' Series1 Series2 Series3 Series4 Series5 28 x 2 forms and secants [SA + SD] T1 T2 T3 T4 ω ω 1 2 3 4 5 The Partner Branch comes after the 5 instances of the incumbent product is achieved and full remote Production is assimilated T2 T1 T3 T4 TP TP Shift fromT2 toT1
  • 8. T3 T2 T1 TP T4 ε1 ε1 2.3644-2.35= .0144W B L A Summary 2.3644-2.126= .2384/2= .1192 IB IB IB 713.52-713.26= .26 50+21 = 71Var Rate 694/3=231 tan Site Development is Remote Requirement, the critical Tan Line, per “T Pluribus Unum” 2 2 2795.9-2100= 695.9 – 694.8 = .7 Remote Capability relies on Lens Completion TP Partnering Requirement depends on Variable (Unit Completion) of All Work 23 x 2 Lens Split tan line = 23 variable lens || 644 All Cost Interior Units 64 x 2 = 128 chi factor LC LC 557 P 522 ROA
  • 9. Cost Study for Path Demarcation Slide8 Slide11 Slide 11 P P Wt. Shift
  • 10. AssociatedViews im 48.48 + .0535 x 2 = 48.5864 Critical Path 200x See “Supply Side Portfolio” From “T Pluribus Unum”
  • 11. Split tan line 6.43 x 10 z X 10 2.3644 New Load Slide 9 See portion ofTable Appendix I 1.20 weighting of fixed to variable shifts 557 T’s 522 + 21 = 543 ROA T’s
  • 12. Lens Contribution Future Sqrt= Tan = Sqrt = Lens Lens ^2 Future See portion ofTable Appendix I Scale used in Slide 8 The Site Access Cost more directly approximates the Bridge Cost /.004=7.1995 B L A B L A T’s
  • 13. z2 Appendix I From “T Pluribus Unum” Used in Slide 7 Used in slide 6 2 4 From Study it appears that the (4) Interior Margin and the (2) Center Metric indicative of Branch Timing, relate to units and costs described as variable. We have attributed the (4) Interior Margin to the Forms and Secants and the (2) Center to the Lens and Pipes. Noted:
  • 15. The Stairway to Heaven Most-High mystery enshrined in the child Mary the fifteen stairs angels ascending and descending house of God and the portal of heaven. The hidden City will appear, Rev. 21
  • 16. 713.52-712.07= 1.45 || Payback 194 Shift from the Digital Path 824.881 slide 3 Ω Ω Omega ends are Secant ends Note:Our Pre-production is not ending on a finished Omega (our Outcome is incomplete) Ω 412 slide 21
  • 17. CURVED LENS and CRITICAL PATH NEGOTIATING THE CURVE FINDING SIGNIFICANT EVENTS P- Model
  • 18.
  • 19. Future notes include: 1. Find the carriage burden for the incumbent load 2. Study the bifurcation of the curve; we had worked with bifurcation processes 3. Path Markers 4. Hidden Margins Bifurcating .02424 to .020402 x 2 = .040804 hypotenuse From “T Pluribus Unum” T’s Path Markers Bifurcation occurs to meet external demand
  • 20. R y = 8129.5e0.0856x R² = 0.2884 y = 2972.5x2 - 23132x + 52939 R² = 0.414 0 20000 40000 60000 80000 100000 Milestones Year 3.6 Year 10.4 Year 34.4 Year 44.4 Year 49.5 Year 50+ Sum Productions T4 T3 T2 T1 TP Ne w All Achieved New Products Thread and Encryptions Forms and Secants Wave and Lens Wall, Pipes, Plaits Expon. (Achieved) Poly. (Achieved) adjusted y = 7968.8e0.0957x R² = 0.2972 y = 2995.1x2 - 23270x + 53131 R² = 0.4195 0 20000 40000 60000 80000 100000 Milestones Year 3.6 Year 10.4 Year 34.4 Year 44.4 Year 49.5 Year 50+ Sum Productions T4 T3 T2 T1 TP Ne w All Milestone Plan R Final Confirmed in our Final MilestoneTable on Slide 27 graphically the 450 units and Secant Production
  • 21. It turns out that the future products depend on all aspects Ω The Candle Stone path shows more ROA gained From “Portal Projects” Does this ROA matter? Yes, integral
  • 22. Contiguous Production 106/ 3.95 Weight of the Path Form divided Single form Margin remainds, part of the constructed but unfinished product on the books– i.e., unfinished Scrum The first question to ask when utilizing secant information is are the instances contiguous? If not, they can not be compared.They must be truly adjacent in a fashion that allows a union plait. To do: Discuss The analogous process leads into the next timeline and cannot be ignored 2646-2684=-38 var. cost
  • 23. ulterior (ʌlˈtɪərɪə) adj1. lying beneath or beyond what is revealed, evident, or supposed: ulterior motives. 2. succeeding, subsequent, or later 3. lying beyond a certain line or point The majority of the significant events happen in T1 and T2 To Do: Discuss TEST T’s 412 slide 16 Retest x 377 x 2 = 754 +3 gate units R
  • 24. From “Supply Side Portfolio” .7565 x 1000
  • 25. (See Final Production Roadmap, slide 27) (Incl. for next process) forward looking statements Incumbency of process Events are timed with Push Product (i.e., Secants) Lens Power amplitude starting set ulterior (ʌlˈtɪərɪə) adj1. lying beneath or beyond what is revealed, evident, or supposed: ulterior motives. 2. succeeding, subsequent, or later 3. lying beyond a certain line or point The major significant events happen in T1 and T2 To Do: Discuss 278 note
  • 26. In our final adjustment we made the correction for partnering Ω 824.881 slide 16 exceeded
  • 27. Ω Coming up, See “Glass Cars and New Ark Product Map;” we will use this Roadmap to get started Next
  • 28. 1. Portal Prosperity: An overview of Glass Theory and Ark Design develops property reconcilement for Conveyance 2. Crossover Conveyance: Beginning with Remote Signature, threading the advancing fingerprint with a glass path and integral site management, moving into SIMULATIONS in Real Time 3. Converge- The Remote Build: Tasks to consider the process of converging to the Remote Build Site and what considerations are given to producing a remote service or build out of a productive requirement, introducing sandbox theory. Phase I only considers the Kitchen Tech. Phase II is involved in whole home Media and Tech in Glass. Phase III develops the land and its attributes. This is three separate papers. 1. Studying T&MM: the requirement for certification of mobility for competent conveyances 2. Portal Projects: the evidence, timing and intelligent use of portals 3. Calling it Green: Components of Green Energy, short review: Calling it Green requires new uses of potential and ^studies in wave glass and graphical relationships can raise up a green energy fluency that will lead to energy self-sufficiency 4. Dimensions in Multivariant Fabrications: Determining Forms and Contents of Green Energy and Blue Wave Cascade; relating elements to current science and future requirements 5. Wave and Lens Assimilation: The means to compile and to build in Glass Systems is described. The use of secant math. 6. Math Solutions for Wave and Lens Assimilations: See also Commentary for Math Solutions 7. Supply Side Portfolio: Timing and Model of Glass and Green events to fulfill path… Does the Tan Line help? 8. Partners in T Pluribus Unum: Measuring with Diacritical Marks 1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media to write and produce in Ark Science and Dimensional Systems, Introduction of the Story “Eru finds a Golden Pen.” 2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and Remix specifications, beginning crosswalk and encryptions 3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of Secants to Build tooling 4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark encryptions and design considerations 5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility for building and research in remote Ark Science. Start of Tooling and Secant Design for the Construction Industry 6. The Remote Build: Planning a Theoretical Production for untried Architecture 7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write Process 8. Bridging the Instance: Now operating multiple instances must bridge the operations, learn about deciduous models and deliberate the outcome of operations for the 2022 Plan of Magi and Marcus 9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products themselves 10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land Products. See Number Theory 11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of seamless integration of methods and modes of operation. See Number Theory. 12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus and Magi Engineering remote architectural process 13. Branch- Sound and Image Construction: Characterizing the branch capability of new applications, appliances and mode[ls] of operations 1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion characteristics. 2. The New Stone: Simulations and Re-instancing to package, confect and view glass media 3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional Matrices. 4. The Dynamic Instance: Product Media Discussed 5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 7. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 10. The Digital Plait Position: Engineering Design of the Load and Thruput 11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated by sound it creates a means by sound to cascade light for safe and wireless power 17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) Motion Projects-8 Remote Theory-5 Ark Model-13 Digital-20 Go to https://www.slideshare.net/Marshallja/presentations https://www.slideshare.net/Marshallja/commentary-for-math-solutions- for-wave-and-lens-assimilationpdf New This Paper: #47 Dimensional Building in Ark Design Product Roadmap