GEOFAR
                                  Geothermal Finance
                                   and Awareness in
                                  European Regions


Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 1
GEOFAR - Overview
Project summary

    GEOFAR will support the fostering of the deep geothermal sector
    across Europe by providing new financing and funding schemes and
    raise awareness among the target group

    GEOFAR aims to
      – reduce financial barriers hindering the initial stages of geothermal
        energy projects
      – raise awareness of industrial geothermal applications
      – improve the know-how and awareness on geothermal energy among
        regional decision makers



Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 2
GEOFAR - Overview
Project summary

    Outputs and results:
      – A set of new financing schemes
      – Financial institutions checking due dilligence of the proposed financial
        scheme
      – Involvement of financial experts
      – Awareness seminars in key countries for raising awareness of regional
        stakeholders
      – Documentary film on geothermal energy
      – Stimulating investment in geothermal energy




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 3
GEOFAR - Overview
Situation of geothermal energy

    A renewable energy source with extremely high potential.
    One important building block towards sustainable use of energy.
    Multiple usage: electricity generation, heating & cooling, desalination
    and process heat.
    Limited exploitation of deep geothermal energy fields.
    Technology for the exploitation of geothermal energy is proven.
    Lack of exploitation mainly due to non-technical barriers during the
    early stages of geothermal energy projects:
      – Inappropriate funding schemes
      – Inappropriate legal frameworks
      – Ignorance of local decision makers regarding the potential of geothermal energy


Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 4
GEOFAR - Overview
Vision

    Combating and overcoming non-technical / financial barriers via
      – developing and proposing appropriate and innovative financing and
        funding schemes
    Boosting the exploitation of geothermal energy via
      – promoting (industrial) geothermal applications, and
      – raising the awareness / knowhow among local and regional decision
        makers.




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 5
GEOFAR - Overview
Objectives

GEOFAR aims to
  reduce financial barriers hindering the initial stages of geothermal
  energy projects through the development and proposal of
  appropriate financing and funding schemes.
  promote and raise the awareness of emerging (industrial)
  geothermal applications. The awareness raising activities are mainly
  directed towards local and regional decision makers and other
  potential stakeholders.
  improve the know-how and awareness among regional decision
  makers by exchanging experience and know-how among the target
  group.

Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 6
GEOFAR - Overview
Main steps

    Identify and describe the non-technical barriers in selected countries
    Describe and present existing and emerging industrial applications
    suitable to increase the profitability of geothermal power plants
    Develop (new) appropriate and tailored financing and funding
    schemes
    Discuss and validate funding schemes with experts
    Outline constitutive elements for the modification of existing and/or
    new dedicated EC Directives or communications.
    Disseminate industrial applications and financial schemes
    to key stakeholders
Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 7
GEOFAR - Overview
Geographical coverage

    Geographical coverage: Germany, France, Greece, Spain, Portugal,
    Bulgaria, Slovakia, Hungary




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 8
GEOFAR - Overview
Expected Result

Direct outcome
    Financial scheme – validated by experts – and checked for due dilligence
    by financial institutions

Reports and fact sheets
    Non-technical barriers and the respective situation of the geothermal energy
    sector in selected countries - Report
    Case studies for selected operations - Report
    Innovative geothermal technologies - Factsheet
    Financial instruments for the support for the exploitation of geothermal
    energy - Report
    Emerging financing scheme for fostering investment in the Geothermal
    Energy sector - Report
Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 9
GEOFAR - Overview
Dissemination

Media
  GEOFAR-Website www.geofar.eu
  Documentary Film on geothermal energy

Dissemination
   5 Awareness Seminars in target countries
   1 Europe-wide large-scale Conference
   10 Newsletters available under www.geofar.eu




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 10
GEOFAR - Overview
Partners

                            BRGM, France
                                                                               Energo Group, Greece

             Erlangen AG, Germany
                                                                               IENE, Greece

             IGME, Greece
                                                                                            IGME, Spain

                            Rödl & Partner, Germany
                                                                                 ARENA, Portugal

Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011    Updated: 31.03.2010   Page 11
GEOFAR - Analysis
Analysis

    The GEOFAR consortium analysed
      – the respective situation of the geothermal energy sector concerning
        direct use of geothermal water and electricity production and non-
        technical barriers for the target countries Germany, France, Greece,
        Spain, Portugal, Slovakia, Bulgaria and Hungary.
                     – Output: Non-technical barriers and the respective situation of the geothermal
                       energy sector in selected countries - Report




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010     Page 12
GEOFAR - Analysis
Main non-technical barriers in geothermal




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 13
GEOFAR - Analysis
Main non-technical barriers in the target countries




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 14
GEOFAR - Analysis
Non-technical barriers - Conclusion

    The development of geothermal energy ranges from one country to
    another. This historical development and the current trend are
    naturally linked to the available resources, but there are other
    reasons that boost or hinder development of deep geothermal
    energy.
    The main identified barrier is the geological risk of the non discovery
    of the resources in adequacy of the expectation of the project:
    money has to be spent meanwhile success of the project has not
    been proven.




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 15
GEOFAR - Analysis
Non-technical barriers - Conclusion

    Globally, the current approach for the decision to launch or not a
    geothermal energy project is mainly economic and financial.
    Developing a European financial support instrument could lead to a
    multiplication of operation, the mutualisation of competences and
    knowledge could have a positive impact at different level: Facilitating
    insurance proposal, raising awareness among financial institutions
    that work at European level, decreasing drilling costs…




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 16
GEOFAR - Analysis
Analysis

    The GEOFAR consortium analysed
      – 40 case studies from Germany, France, Portugal, Spain, Greece,
        Hungary, Slovakia and Bulgaria to give an overview on geothermal
        projects in order to raise the target groups´ awareness on what is
        possible and on how projects can be realised.
                     – Output: Case studies for selected operations - Report




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 17
GEOFAR - Analysis
Overview on selected geothermal projects




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 18
GEOFAR - Analysis
Case studies - Conclusion

    The diversity of geothermal operations across Europe is due to the
    needs and depends on the geothermal resources available. The
    resources available and their properties play a major role on the
    investment costs of the project.
    New projects are currently being developed all across Europe. This
    is indispensable to meet target concerning development of
    geothermal energy, expected to take part in the future energy mix.




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 19
GEOFAR - Analysis
Analysis

    The GEOFAR consortium analysed
      - innovative geothermal application to underline the multiple possibilities
        of use of geothermal energy and the potential and emerging
        technologies that could in the future boost the development of
        geothermal energy to meet the set targets.
                     - Output: Innovative geothermal technologies - Factsheet




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 20
GEOFAR - Analysis
Innovative geothermal applications




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 21
GEOFAR - Analysis
Innovative geothermal applications - Conclusion

    Innovative geothermal applications improve the energetic and
    economic profitability within the objective to develop new environment
    friendly solutions.
    All these new developments are ways to exploite the great potential of
    development of deep geothermal energy.
    The co-use of geothermal energy for the traditional electricity
    production and heating and cooling as well as for innovative
    applications will boost the profitability of geothermal energy
    exploitation and higher profitability will trigger new investments in
    geothermal energy and reduce the costs per unit.



Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 22
GEOFAR - Analysis
Analysis

    The GEOFAR consortium analysed
      - 44 financial instruments from national, European and international level
        on their potential to overcome the main financial barriers.
                     - Output: Financial instruments for the support for the exploitation of geothermal
                       energy - Report




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 23
GEOFAR - Analysis
Overcoming financial barriers




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 24
GEOFAR - Analysis
Strength/weaknesses of financial instruments




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 25
GEOFAR - Analysis
Project stages tackled by financing instruments




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 26
GEOFAR - Analysis
Differences in tax reductions/excemptions




                                                                                              l




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 27
GEOFAR - Analysis
Feed in tariff – most common financial instrument

                                       Feed-in Tariffs in Target Countries (c€/kWh)

                             30

                             25

                             20
                                                                                         Max
                             15
                                                                                         Min
                             10

                              5

                              0
                                       ly




                                                                   y
                                                                  in




                                                                  ia
                                  y




                                                                 nd


                                                                    l
                                                                   d




                                                                  d

                                                                  s
                                                                ga




                                                                ar
                               an

                                      Ita




                                                               an




                                                               an

                                                               ea




                                                               ak
                                               a




                                                              la
                                            Sp




                                                            rtu




                                                             ng
                              m




                                                             nl




                                                            nl

                                                           rs




                                                           ov
                                                           Is
                            er




                                                        Hu
                                                          ai




                                                        Po


                                                         ai

                                                        ve




                                                        Sl
                                                         e
                                               M




                                                       M
                           G




                                                      ec




                                                       O
                                              e




                                                    ce
                                                    re




                                                   ce
                                            ec

                                                  G




                                                 an

                                                an
                                          re




                                              Fr
                                         G




                                              Fr




Contract Number: IEE/07/668/SI2.499707             Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 28
GEOFAR - Analysis
Financial Instruments - Conclusion

    Across Europe a lack of harmonisation in financial instruments is
    visible and a European support environment is not given.
    The development of geothermal financial instruments at the
    European level can overcome this lack.
    A European solution has to solve two main aspects: the lack of
    financing for the exploration phase and the risk of an inappropriate
    quality or quantity of the geothermal resource.
    The GEOFAR project has worked out an appropriate funding
    scheme (“GeoRIMI”) that will be installed as European solution for
    supporting geothermal energy projects.



Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 29
GEOFAR - Analysis
Outputs

Reports and fact sheets
    Non-technical barriers and the respective situation of the geothermal energy
    sector in selected countries - Report
    Case studies for selected operations - Report
    Innovative geothermal technologies - Factsheet
    Financial instruments for the support for the exploitation of geothermal
    energy - Report
    All reports can be downloaded under www.geofar.eu




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 30
GEOFAR - GERIMI
Geothermal Risk Mitigation (GeoRiMi)

        GeoRiMi will follow the hereafter mentioned principles
             -       Support for geothermal investment focuses on the exploratory
                     stage and the drilling stage.
             -       Private investors must provide a significant part of the total
                     investment in both the exploratory and the drilling stage.
             -       Publicly-funded support to be limited in time and total amount.
             -       Publicly-funded support to be provided to cover exploration and
                     drilling risk only.
             -       For all other purposes publicly-funded support uses the normal
                     business-financing conduits.
             -       Regional and local public authorities must be supported in their
                     efforts to understand and develop geothermal resources in their
                     jurisdiction.
Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 31
GEOFAR - GERIMI
Geothermal Risk Mitigation (GeoRiMi)

    The proposed GEOFAR Financial Scheme “GeoRiMi” will cover
    three instruments tackling different project stages and beneficiaries
      - Instrument I proposes co-financing prefeasibility studies to be
        commissioned exclusively by regional and local authorities in areas with
        geothermal potential in which public awareness of that potential is
        inadequate.
      - Instrument II proposes extending partial guarantees to the exploratory
        stage of qualified geothermal energy projects.
      - Instrument III proposes extending partial guarantees to the production-
        drilling stage of qualified geothermal energy sources.




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 32
GEOFAR - GERIMI
Geothermal Risk Mitigation (GeoRiMi)

    Steps to go for the implementation of GeoRiMi
      -    Reality check with national and international financial institutions
      -    Due diligence of GeoRiMi
      -    Preparation of an EU-framework for embedding GeoRiMi
      -    Planned finalisation: February 2011




Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011   Updated: 31.03.2010   Page 33
GEOFAR
Contact

Erlangen AG
Marco Wendel
Henkestraße 91
91052 Erlangen
Germany
Tel: 0049 – 9131 – 530 280 1
Fax: 0049 – 9131 – 530 13 92
E-Mail: m.wendel@erlangen-ag.de                                                The sole responsibility for the content of this presentation
                                                                               lies with the authors. It does not necessarily reflect the
                                                                               opinion of the European Communities. The European
                                                                               Commission is not responsible for any use that may be
                                                                               made of the information contained therein.



Contract Number: IEE/07/668/SI2.499707   Project Duration: 09/2008 - 02/2011         Updated: 31.03.2010                    Page 34

More Related Content

What's hot

Cost effectiveness of cohesion policy investments in energy efficiency
Cost effectiveness of cohesion policy investments in energy efficiencyCost effectiveness of cohesion policy investments in energy efficiency
Cost effectiveness of cohesion policy investments in energy efficiencyMARIE Project
 
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2Tuong Do
 
E Mobility Lohse Busch6 April2011
E Mobility Lohse Busch6 April2011E Mobility Lohse Busch6 April2011
E Mobility Lohse Busch6 April2011HaiderExecuteSearch
 
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...RCREEE
 
Eden Pps6 1 Introdu O Ao Evento Luke Murray
Eden Pps6 1 Introdu  O Ao Evento  Luke MurrayEden Pps6 1 Introdu  O Ao Evento  Luke Murray
Eden Pps6 1 Introdu O Ao Evento Luke Murrayh2portugal
 
Financing Climate Change - Dr Andrea Pinna, EIB - EPA CC Conference June 2010
Financing Climate Change - Dr Andrea Pinna, EIB - EPA CC Conference June 2010Financing Climate Change - Dr Andrea Pinna, EIB - EPA CC Conference June 2010
Financing Climate Change - Dr Andrea Pinna, EIB - EPA CC Conference June 2010Environmental Protection Agency, Ireland
 
Marie project policy paper
Marie project policy paperMarie project policy paper
Marie project policy paperMARIE Project
 
Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129RCREEE
 
Ljubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signaturesLjubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signaturesAniela2
 
Marie executive summary
Marie executive summaryMarie executive summary
Marie executive summaryMARIE Project
 
Fuelling europe's future- how automotive innovation leads to eu jobs
Fuelling europe's future- how automotive innovation leads to eu jobsFuelling europe's future- how automotive innovation leads to eu jobs
Fuelling europe's future- how automotive innovation leads to eu jobsRicardo Energy & Environment
 
Pact of Islands Brochure (english)
Pact of Islands Brochure (english)Pact of Islands Brochure (english)
Pact of Islands Brochure (english)Dr Shirley Gallagher
 
Introduction to the Renewable Energy Directive
Introduction to the Renewable Energy DirectiveIntroduction to the Renewable Energy Directive
Introduction to the Renewable Energy DirectiveLeonardo ENERGY
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013UNDPhr
 
Day2 session 3: Lebanon
Day2 session 3: LebanonDay2 session 3: Lebanon
Day2 session 3: LebanonRCREEE
 

What's hot (18)

Cost effectiveness of cohesion policy investments in energy efficiency
Cost effectiveness of cohesion policy investments in energy efficiencyCost effectiveness of cohesion policy investments in energy efficiency
Cost effectiveness of cohesion policy investments in energy efficiency
 
OffshoreGrid: Offshore Electricity Infrastructure in Europe
OffshoreGrid: Offshore Electricity Infrastructure in EuropeOffshoreGrid: Offshore Electricity Infrastructure in Europe
OffshoreGrid: Offshore Electricity Infrastructure in Europe
 
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
 
E Mobility Lohse Busch6 April2011
E Mobility Lohse Busch6 April2011E Mobility Lohse Busch6 April2011
E Mobility Lohse Busch6 April2011
 
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
 
Eden Pps6 1 Introdu O Ao Evento Luke Murray
Eden Pps6 1 Introdu  O Ao Evento  Luke MurrayEden Pps6 1 Introdu  O Ao Evento  Luke Murray
Eden Pps6 1 Introdu O Ao Evento Luke Murray
 
Financing Climate Change - Dr Andrea Pinna, EIB - EPA CC Conference June 2010
Financing Climate Change - Dr Andrea Pinna, EIB - EPA CC Conference June 2010Financing Climate Change - Dr Andrea Pinna, EIB - EPA CC Conference June 2010
Financing Climate Change - Dr Andrea Pinna, EIB - EPA CC Conference June 2010
 
Marie project policy paper
Marie project policy paperMarie project policy paper
Marie project policy paper
 
Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129
 
Ljubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signaturesLjubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signatures
 
Marie executive summary
Marie executive summaryMarie executive summary
Marie executive summary
 
Nina on Renewable Energies
Nina on Renewable EnergiesNina on Renewable Energies
Nina on Renewable Energies
 
Fuelling europe's future- how automotive innovation leads to eu jobs
Fuelling europe's future- how automotive innovation leads to eu jobsFuelling europe's future- how automotive innovation leads to eu jobs
Fuelling europe's future- how automotive innovation leads to eu jobs
 
Bulgaria
BulgariaBulgaria
Bulgaria
 
Pact of Islands Brochure (english)
Pact of Islands Brochure (english)Pact of Islands Brochure (english)
Pact of Islands Brochure (english)
 
Introduction to the Renewable Energy Directive
Introduction to the Renewable Energy DirectiveIntroduction to the Renewable Energy Directive
Introduction to the Renewable Energy Directive
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013
 
Day2 session 3: Lebanon
Day2 session 3: LebanonDay2 session 3: Lebanon
Day2 session 3: Lebanon
 

Viewers also liked

Viewers also liked (7)

The potential of deep geothermal energy
The potential of deep geothermal energyThe potential of deep geothermal energy
The potential of deep geothermal energy
 
Sierra Geothermal Power
Sierra Geothermal PowerSierra Geothermal Power
Sierra Geothermal Power
 
Geothermal power plant
Geothermal power plantGeothermal power plant
Geothermal power plant
 
The Geothermal Power Plant
The Geothermal Power PlantThe Geothermal Power Plant
The Geothermal Power Plant
 
GEOTHERMAL POWER PLANT
GEOTHERMAL  POWER PLANT GEOTHERMAL  POWER PLANT
GEOTHERMAL POWER PLANT
 
Geothermal Power
Geothermal PowerGeothermal Power
Geothermal Power
 
Presentation on Geothermal Energy
Presentation on Geothermal EnergyPresentation on Geothermal Energy
Presentation on Geothermal Energy
 

Similar to Geothermal Finance

Nuclear Power in Italy
Nuclear Power in ItalyNuclear Power in Italy
Nuclear Power in ItalyEnel S.p.A.
 
The Role of Emerging End-Use and Microgeneration Technologies in Smart Grids ...
The Role of Emerging End-Use and Microgeneration Technologies in Smart Grids ...The Role of Emerging End-Use and Microgeneration Technologies in Smart Grids ...
The Role of Emerging End-Use and Microgeneration Technologies in Smart Grids ...IEA DSM Implementing Agreement (IA)
 
Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phonesVito Gamberale
 
GEF finance geothermal 2012 djibouti remplace by tazania 05 31-2012 id2119 co...
GEF finance geothermal 2012 djibouti remplace by tazania 05 31-2012 id2119 co...GEF finance geothermal 2012 djibouti remplace by tazania 05 31-2012 id2119 co...
GEF finance geothermal 2012 djibouti remplace by tazania 05 31-2012 id2119 co...Parti Djibouti
 
7 andreas tuerk better_zagreb_09_12 10h03
7 andreas tuerk  better_zagreb_09_12 10h037 andreas tuerk  better_zagreb_09_12 10h03
7 andreas tuerk better_zagreb_09_12 10h03UNDPhr
 
Turkey Wind Financing, IPEEC
Turkey Wind Financing, IPEECTurkey Wind Financing, IPEEC
Turkey Wind Financing, IPEECnooone
 
The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)Leonardo ENERGY
 
Vienna,Febbraio2010
Vienna,Febbraio2010Vienna,Febbraio2010
Vienna,Febbraio2010gbnet54
 
Geothermal Resources at the Azores
Geothermal Resources at the AzoresGeothermal Resources at the Azores
Geothermal Resources at the AzoresIceland Geothermal
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study Simeon Arnaudov
 
Energy and location - AMFM workshop
Energy and location - AMFM workshopEnergy and location - AMFM workshop
Energy and location - AMFM workshopPiergiorgio Cipriano
 
FWP 2017 l Eric MASSART, Caisse des Dépôts et Consignation
FWP 2017 l Eric MASSART, Caisse des Dépôts et ConsignationFWP 2017 l Eric MASSART, Caisse des Dépôts et Consignation
FWP 2017 l Eric MASSART, Caisse des Dépôts et ConsignationBluesign
 
Inauguracion kubik campos_isoird_visioninternacional
Inauguracion kubik campos_isoird_visioninternacionalInauguracion kubik campos_isoird_visioninternacional
Inauguracion kubik campos_isoird_visioninternacionalkubikbytecnalia
 
Session4 the role of successful pilot projects for re business development au...
Session4 the role of successful pilot projects for re business development au...Session4 the role of successful pilot projects for re business development au...
Session4 the role of successful pilot projects for re business development au...RCREEE
 
Financing Challenges for Geothermal Power in Europe
Financing Challenges for Geothermal Power in EuropeFinancing Challenges for Geothermal Power in Europe
Financing Challenges for Geothermal Power in EuropeIceland Geothermal
 
Integration of Demand Side Management, Distributed Generation, Renewable Ener...
Integration of Demand Side Management, Distributed Generation, Renewable Ener...Integration of Demand Side Management, Distributed Generation, Renewable Ener...
Integration of Demand Side Management, Distributed Generation, Renewable Ener...IEA DSM Implementing Agreement (IA)
 
Jeffrey Walkenhorst Alt Energy 090209
Jeffrey Walkenhorst Alt Energy 090209Jeffrey Walkenhorst Alt Energy 090209
Jeffrey Walkenhorst Alt Energy 090209Jeff Walkenhorst
 

Similar to Geothermal Finance (20)

Nuclear Power in Italy
Nuclear Power in ItalyNuclear Power in Italy
Nuclear Power in Italy
 
Ecoheat4eu - Executive summary report
Ecoheat4eu - Executive summary reportEcoheat4eu - Executive summary report
Ecoheat4eu - Executive summary report
 
The Role of Emerging End-Use and Microgeneration Technologies in Smart Grids ...
The Role of Emerging End-Use and Microgeneration Technologies in Smart Grids ...The Role of Emerging End-Use and Microgeneration Technologies in Smart Grids ...
The Role of Emerging End-Use and Microgeneration Technologies in Smart Grids ...
 
Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phones
 
GEF finance geothermal 2012 djibouti remplace by tazania 05 31-2012 id2119 co...
GEF finance geothermal 2012 djibouti remplace by tazania 05 31-2012 id2119 co...GEF finance geothermal 2012 djibouti remplace by tazania 05 31-2012 id2119 co...
GEF finance geothermal 2012 djibouti remplace by tazania 05 31-2012 id2119 co...
 
7 andreas tuerk better_zagreb_09_12 10h03
7 andreas tuerk  better_zagreb_09_12 10h037 andreas tuerk  better_zagreb_09_12 10h03
7 andreas tuerk better_zagreb_09_12 10h03
 
Turkey Wind Financing, IPEEC
Turkey Wind Financing, IPEECTurkey Wind Financing, IPEEC
Turkey Wind Financing, IPEEC
 
The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)
 
Vienna,Febbraio2010
Vienna,Febbraio2010Vienna,Febbraio2010
Vienna,Febbraio2010
 
Geothermal Resources at the Azores
Geothermal Resources at the AzoresGeothermal Resources at the Azores
Geothermal Resources at the Azores
 
Kf w elena Sarlat
Kf w elena SarlatKf w elena Sarlat
Kf w elena Sarlat
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study
 
Energy and location - AMFM workshop
Energy and location - AMFM workshopEnergy and location - AMFM workshop
Energy and location - AMFM workshop
 
FWP 2017 l Eric MASSART, Caisse des Dépôts et Consignation
FWP 2017 l Eric MASSART, Caisse des Dépôts et ConsignationFWP 2017 l Eric MASSART, Caisse des Dépôts et Consignation
FWP 2017 l Eric MASSART, Caisse des Dépôts et Consignation
 
Inauguracion kubik campos_isoird_visioninternacional
Inauguracion kubik campos_isoird_visioninternacionalInauguracion kubik campos_isoird_visioninternacional
Inauguracion kubik campos_isoird_visioninternacional
 
Session4 the role of successful pilot projects for re business development au...
Session4 the role of successful pilot projects for re business development au...Session4 the role of successful pilot projects for re business development au...
Session4 the role of successful pilot projects for re business development au...
 
Financing Challenges for Geothermal Power in Europe
Financing Challenges for Geothermal Power in EuropeFinancing Challenges for Geothermal Power in Europe
Financing Challenges for Geothermal Power in Europe
 
Integration of Demand Side Management, Distributed Generation, Renewable Ener...
Integration of Demand Side Management, Distributed Generation, Renewable Ener...Integration of Demand Side Management, Distributed Generation, Renewable Ener...
Integration of Demand Side Management, Distributed Generation, Renewable Ener...
 
Jeffrey Walkenhorst Alt Energy 090209
Jeffrey Walkenhorst Alt Energy 090209Jeffrey Walkenhorst Alt Energy 090209
Jeffrey Walkenhorst Alt Energy 090209
 
Energoefektivitātes pakalpojuma līgumi Slovēnijā
Energoefektivitātes pakalpojuma līgumi SlovēnijāEnergoefektivitātes pakalpojuma līgumi Slovēnijā
Energoefektivitātes pakalpojuma līgumi Slovēnijā
 

Recently uploaded

Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantagesjayjaymabutot13
 
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...Amil baba
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Commonwealth
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technologyz xss
 
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...amilabibi1
 
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170Sonam Pathan
 
Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Sonam Pathan
 
(办理学位证)美国加州州立大学东湾分校毕业证成绩单原版一比一
(办理学位证)美国加州州立大学东湾分校毕业证成绩单原版一比一(办理学位证)美国加州州立大学东湾分校毕业证成绩单原版一比一
(办理学位证)美国加州州立大学东湾分校毕业证成绩单原版一比一S SDS
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证jdkhjh
 
2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGecko2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGeckoCoinGecko
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economiccinemoviesu
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)ECTIJ
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppmiss dipika
 

Recently uploaded (20)

Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantages
 
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology
 
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
 
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
 
Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713
 
(办理学位证)美国加州州立大学东湾分校毕业证成绩单原版一比一
(办理学位证)美国加州州立大学东湾分校毕业证成绩单原版一比一(办理学位证)美国加州州立大学东湾分校毕业证成绩单原版一比一
(办理学位证)美国加州州立大学东湾分校毕业证成绩单原版一比一
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
Q1 2024 Newsletter | Financial Synergies Wealth Advisors
Q1 2024 Newsletter | Financial Synergies Wealth AdvisorsQ1 2024 Newsletter | Financial Synergies Wealth Advisors
Q1 2024 Newsletter | Financial Synergies Wealth Advisors
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 
2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGecko2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGecko
 
🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economic
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsApp
 

Geothermal Finance

  • 1. GEOFAR Geothermal Finance and Awareness in European Regions Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 1
  • 2. GEOFAR - Overview Project summary GEOFAR will support the fostering of the deep geothermal sector across Europe by providing new financing and funding schemes and raise awareness among the target group GEOFAR aims to – reduce financial barriers hindering the initial stages of geothermal energy projects – raise awareness of industrial geothermal applications – improve the know-how and awareness on geothermal energy among regional decision makers Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 2
  • 3. GEOFAR - Overview Project summary Outputs and results: – A set of new financing schemes – Financial institutions checking due dilligence of the proposed financial scheme – Involvement of financial experts – Awareness seminars in key countries for raising awareness of regional stakeholders – Documentary film on geothermal energy – Stimulating investment in geothermal energy Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 3
  • 4. GEOFAR - Overview Situation of geothermal energy A renewable energy source with extremely high potential. One important building block towards sustainable use of energy. Multiple usage: electricity generation, heating & cooling, desalination and process heat. Limited exploitation of deep geothermal energy fields. Technology for the exploitation of geothermal energy is proven. Lack of exploitation mainly due to non-technical barriers during the early stages of geothermal energy projects: – Inappropriate funding schemes – Inappropriate legal frameworks – Ignorance of local decision makers regarding the potential of geothermal energy Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 4
  • 5. GEOFAR - Overview Vision Combating and overcoming non-technical / financial barriers via – developing and proposing appropriate and innovative financing and funding schemes Boosting the exploitation of geothermal energy via – promoting (industrial) geothermal applications, and – raising the awareness / knowhow among local and regional decision makers. Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 5
  • 6. GEOFAR - Overview Objectives GEOFAR aims to reduce financial barriers hindering the initial stages of geothermal energy projects through the development and proposal of appropriate financing and funding schemes. promote and raise the awareness of emerging (industrial) geothermal applications. The awareness raising activities are mainly directed towards local and regional decision makers and other potential stakeholders. improve the know-how and awareness among regional decision makers by exchanging experience and know-how among the target group. Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 6
  • 7. GEOFAR - Overview Main steps Identify and describe the non-technical barriers in selected countries Describe and present existing and emerging industrial applications suitable to increase the profitability of geothermal power plants Develop (new) appropriate and tailored financing and funding schemes Discuss and validate funding schemes with experts Outline constitutive elements for the modification of existing and/or new dedicated EC Directives or communications. Disseminate industrial applications and financial schemes to key stakeholders Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 7
  • 8. GEOFAR - Overview Geographical coverage Geographical coverage: Germany, France, Greece, Spain, Portugal, Bulgaria, Slovakia, Hungary Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 8
  • 9. GEOFAR - Overview Expected Result Direct outcome Financial scheme – validated by experts – and checked for due dilligence by financial institutions Reports and fact sheets Non-technical barriers and the respective situation of the geothermal energy sector in selected countries - Report Case studies for selected operations - Report Innovative geothermal technologies - Factsheet Financial instruments for the support for the exploitation of geothermal energy - Report Emerging financing scheme for fostering investment in the Geothermal Energy sector - Report Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 9
  • 10. GEOFAR - Overview Dissemination Media GEOFAR-Website www.geofar.eu Documentary Film on geothermal energy Dissemination 5 Awareness Seminars in target countries 1 Europe-wide large-scale Conference 10 Newsletters available under www.geofar.eu Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 10
  • 11. GEOFAR - Overview Partners BRGM, France Energo Group, Greece Erlangen AG, Germany IENE, Greece IGME, Greece IGME, Spain Rödl & Partner, Germany ARENA, Portugal Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 11
  • 12. GEOFAR - Analysis Analysis The GEOFAR consortium analysed – the respective situation of the geothermal energy sector concerning direct use of geothermal water and electricity production and non- technical barriers for the target countries Germany, France, Greece, Spain, Portugal, Slovakia, Bulgaria and Hungary. – Output: Non-technical barriers and the respective situation of the geothermal energy sector in selected countries - Report Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 12
  • 13. GEOFAR - Analysis Main non-technical barriers in geothermal Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 13
  • 14. GEOFAR - Analysis Main non-technical barriers in the target countries Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 14
  • 15. GEOFAR - Analysis Non-technical barriers - Conclusion The development of geothermal energy ranges from one country to another. This historical development and the current trend are naturally linked to the available resources, but there are other reasons that boost or hinder development of deep geothermal energy. The main identified barrier is the geological risk of the non discovery of the resources in adequacy of the expectation of the project: money has to be spent meanwhile success of the project has not been proven. Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 15
  • 16. GEOFAR - Analysis Non-technical barriers - Conclusion Globally, the current approach for the decision to launch or not a geothermal energy project is mainly economic and financial. Developing a European financial support instrument could lead to a multiplication of operation, the mutualisation of competences and knowledge could have a positive impact at different level: Facilitating insurance proposal, raising awareness among financial institutions that work at European level, decreasing drilling costs… Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 16
  • 17. GEOFAR - Analysis Analysis The GEOFAR consortium analysed – 40 case studies from Germany, France, Portugal, Spain, Greece, Hungary, Slovakia and Bulgaria to give an overview on geothermal projects in order to raise the target groups´ awareness on what is possible and on how projects can be realised. – Output: Case studies for selected operations - Report Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 17
  • 18. GEOFAR - Analysis Overview on selected geothermal projects Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 18
  • 19. GEOFAR - Analysis Case studies - Conclusion The diversity of geothermal operations across Europe is due to the needs and depends on the geothermal resources available. The resources available and their properties play a major role on the investment costs of the project. New projects are currently being developed all across Europe. This is indispensable to meet target concerning development of geothermal energy, expected to take part in the future energy mix. Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 19
  • 20. GEOFAR - Analysis Analysis The GEOFAR consortium analysed - innovative geothermal application to underline the multiple possibilities of use of geothermal energy and the potential and emerging technologies that could in the future boost the development of geothermal energy to meet the set targets. - Output: Innovative geothermal technologies - Factsheet Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 20
  • 21. GEOFAR - Analysis Innovative geothermal applications Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 21
  • 22. GEOFAR - Analysis Innovative geothermal applications - Conclusion Innovative geothermal applications improve the energetic and economic profitability within the objective to develop new environment friendly solutions. All these new developments are ways to exploite the great potential of development of deep geothermal energy. The co-use of geothermal energy for the traditional electricity production and heating and cooling as well as for innovative applications will boost the profitability of geothermal energy exploitation and higher profitability will trigger new investments in geothermal energy and reduce the costs per unit. Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 22
  • 23. GEOFAR - Analysis Analysis The GEOFAR consortium analysed - 44 financial instruments from national, European and international level on their potential to overcome the main financial barriers. - Output: Financial instruments for the support for the exploitation of geothermal energy - Report Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 23
  • 24. GEOFAR - Analysis Overcoming financial barriers Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 24
  • 25. GEOFAR - Analysis Strength/weaknesses of financial instruments Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 25
  • 26. GEOFAR - Analysis Project stages tackled by financing instruments Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 26
  • 27. GEOFAR - Analysis Differences in tax reductions/excemptions l Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 27
  • 28. GEOFAR - Analysis Feed in tariff – most common financial instrument Feed-in Tariffs in Target Countries (c€/kWh) 30 25 20 Max 15 Min 10 5 0 ly y in ia y nd l d d s ga ar an Ita an an ea ak a la Sp rtu ng m nl nl rs ov Is er Hu ai Po ai ve Sl e M M G ec O e ce re ce ec G an an re Fr G Fr Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 28
  • 29. GEOFAR - Analysis Financial Instruments - Conclusion Across Europe a lack of harmonisation in financial instruments is visible and a European support environment is not given. The development of geothermal financial instruments at the European level can overcome this lack. A European solution has to solve two main aspects: the lack of financing for the exploration phase and the risk of an inappropriate quality or quantity of the geothermal resource. The GEOFAR project has worked out an appropriate funding scheme (“GeoRIMI”) that will be installed as European solution for supporting geothermal energy projects. Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 29
  • 30. GEOFAR - Analysis Outputs Reports and fact sheets Non-technical barriers and the respective situation of the geothermal energy sector in selected countries - Report Case studies for selected operations - Report Innovative geothermal technologies - Factsheet Financial instruments for the support for the exploitation of geothermal energy - Report All reports can be downloaded under www.geofar.eu Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 30
  • 31. GEOFAR - GERIMI Geothermal Risk Mitigation (GeoRiMi) GeoRiMi will follow the hereafter mentioned principles - Support for geothermal investment focuses on the exploratory stage and the drilling stage. - Private investors must provide a significant part of the total investment in both the exploratory and the drilling stage. - Publicly-funded support to be limited in time and total amount. - Publicly-funded support to be provided to cover exploration and drilling risk only. - For all other purposes publicly-funded support uses the normal business-financing conduits. - Regional and local public authorities must be supported in their efforts to understand and develop geothermal resources in their jurisdiction. Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 31
  • 32. GEOFAR - GERIMI Geothermal Risk Mitigation (GeoRiMi) The proposed GEOFAR Financial Scheme “GeoRiMi” will cover three instruments tackling different project stages and beneficiaries - Instrument I proposes co-financing prefeasibility studies to be commissioned exclusively by regional and local authorities in areas with geothermal potential in which public awareness of that potential is inadequate. - Instrument II proposes extending partial guarantees to the exploratory stage of qualified geothermal energy projects. - Instrument III proposes extending partial guarantees to the production- drilling stage of qualified geothermal energy sources. Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 32
  • 33. GEOFAR - GERIMI Geothermal Risk Mitigation (GeoRiMi) Steps to go for the implementation of GeoRiMi - Reality check with national and international financial institutions - Due diligence of GeoRiMi - Preparation of an EU-framework for embedding GeoRiMi - Planned finalisation: February 2011 Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 33
  • 34. GEOFAR Contact Erlangen AG Marco Wendel Henkestraße 91 91052 Erlangen Germany Tel: 0049 – 9131 – 530 280 1 Fax: 0049 – 9131 – 530 13 92 E-Mail: m.wendel@erlangen-ag.de The sole responsibility for the content of this presentation lies with the authors. It does not necessarily reflect the opinion of the European Communities. The European Commission is not responsible for any use that may be made of the information contained therein. Contract Number: IEE/07/668/SI2.499707 Project Duration: 09/2008 - 02/2011 Updated: 31.03.2010 Page 34