KIC InnoEnergy Technology Strategy
Magrenov
December 16th and 17th, Barcelona

Celine Jullien
Industry Program Management Officer
Content

1. Today’s objective and one message
2. The 3 building blocs of KIC InnoEnergyTechnology Strategy
3. Technology assessment and Innovation project selection
4. Link to innovation project management

Copyright © 2013 KIC InnoEnergy

2
Today’s objective
…one challenge

1. A Technology Strategy to drive ACTIONS and make impact

2. Selected Variables are KEY
3. To be UPDATED
One Challenge: To “Magrenoved” it all
KIC InnoEnergy Technology Strategy – v2 (1/5)
3 building blocs: Strategy & Roadmap, Competence Mapping, Long term vision

Competence mapping
for Intra and Extra KIC
Partners per thematic field

Long term Vision
Energy landscape 2022

2000-2012

2012-2017-2022

Strategy and
Roadmap per
thematic field
2013-2017

2000

2010

2013

2017

2022

Energy from Chemical Fuels

KIC
thematic
fields

Clean coal and Gas technologies
Renewable energy
Sustainable Nuclear and renewable energy convergence. Energy efficiency
Smart and Intelligent Buildings and cities
Smart grids and electric storage
Copyright © 2013 KIC InnoEnergy

4
KIC InnoEnergy Technology Strategy – v2 (2/5)
3 building blocs: Strategy and Roadmap, Competence Mapping, Long term vision
Objectives and methods

Strategy and Roadmap
per thematic field
2013-2017
• To build KIC strategic
medium term roadmap per
thematic field
• Identify market challenges,
business drivers and
technologies to address
those challenges
• Assess KIC “Impactability”
of selected topic,
• Decide in which energy
technologies to focus
• Identify Industry value chain
necessary,
• Defining actions needed to
increase “impactability”
• Homogeneization & quality
(value chain, technoeconomic data, depth and
width)
• Sounder iterations
(stakeholders involved)
• More discrimination

Competence mapping
for Intra and Extra KIC
Partners per thematic
field
2000-2012
• To provide an in depth
understanding of KIC
partners competences in the
energy landscape
• Analyzing KIC partners’
innovation capacity ,
characterized by Key
Performance Indicators
(KPI)
• Mapping over 74 technology
segments identified over the
six KIC thematic fields
• Identifying key players
outside KIC; Top 10 players
and future game changers
• Better granularity
(homogeneity,
discrimination) per
technologies
• Complement analyzed KPIs
• Freeze T0

Long term Vision
Energy landscape 2022

2012-2017-2022

• To depict the whole energy
landscape and produce a
forward looking EU energy
landscape and KIC positioning
• In a five plus five year timeframe
• Using both user and supplier
perspectives
• Per existing KIC thematic
fields and new ones.
• Screening 115 energy
technologies
• Decide where to priorize KIC
investment (impactability,
risk reward)
• Homogeneize taxonomy
with the other 2 building
blocks
• Define portfolio
management criteria
• Define investment strategy
criteria
5
KIC InnoEnergy Technology Strategy – v2 (3/5)
3 building blocs: Strategy and Roadmap, Competence Mapping, Long term vision
Assessment criteria

Strategy and Roadmap
per thematic field

2013-2016

Criteria for Technology
Assessment
 Shortest Time to market (for
the technology involved)
 Highest impact in: Energy
cost decrease, Increase of
operability, decrease of GHG
effects
 Leadership and competence
of KIC partners in the said
topic and technology
 Declared KIC industry
interest and commitment
 Foreseeable regulatory
impact
 Required investment to
develop the innovations
 Cross impact in several
applications
 IRL

Competence mapping
for Intra and Extra KIC
Partners per thematic
field
2000-2012
Patent, publication and R&D
data base
 IP Scoring
• Number of Patents
• Quality of Patents
 Innovation Scoring
• R&D capacity
• Strategic index
 R&D scoring
• Publications
• Quality of
publications
• Collaboration scoring
• # of R&D&I projects/$
• R&D&I partners
quality
• Valorization capacityscoring
• # products in market
• # spin-offs created
Copyright © 2013 KIC InnoEnergy

Long term Vision
Energy landscape 2022
2012-2017-2022

Key criteria to select
Technologies :
 Consumer Readiness Level
and Technology Readiness
Levels (CRL-TRL) fit an gap
from CRL =3+; TRL=6 to
CRL=4; TRL= 8-9)
 Size of the potential market
2022: Large and at least
European or even Global
 Risk-reward map is the final
selection criteria to have a
balanced porfolio
• Define portfolio
management criteria (IRL)
• Define investment strategy
criteria

6
KIC InnoEnergy Technology Strategy v2 (4/5)
3 building blocs: Strategy and Roadmap, Competence Mapping, Long term vision
Assessment visuals

Strategy and Roadmap
per thematic field

2013-2017

Competence mapping
for Intra and Extra KIC
Partners per thematic
field
2000-2012

Copyright © 2013 KIC InnoEnergy

Long term Vision
Energy landscape 2022
2012-2017-2022

7
KIC InnoEnergy Technology Strategy v2- (5/5)
3 building blocs: Strategy and Roadmap, Competence Mapping, Long term vision
Results

Strategy and Roadmap
per thematic field

2013-2016

Competence mapping
for Intra and Extra KIC
Partners per thematic
field
2000-2012

Long term Vision
Energy landscape 2022
2012-2017-2022

Thematic Field: Sustainable
Thematic Field:Smart
Thematic Field: Intelligent
Nuclear and Renewable
Grids and Electric
Thematic Field Clean
EnergyStorage Field
Efficient
Convergence
Thematic Buildings
Coal and Gas
and Cities Field
Thematic
Energy from
Technologies
Renewable
Chemical Fuels
Energies

Copyright © 2013 KIC InnoEnergy

8
Technology assessment and Innovation project selection
Objectives and criteria
Objectives
1.Assess Innovation Project Proposals
2.Propose a ranking for KIC investment commitment
Assessment criteria (transparent, formalized, communicated, known)
A1
BUSINESS DEVELOPMENT
A1.1 Preliminary product or service definition (problem statement, solution benchmark,…)

6,0
2,0

A1.2 Business opportunity assessment (market analysis, competitive analysis, value proposition

3,0

A1.3
A2
A2.1
A2.2
A2.3

for customers, ...)
Soundness of IP analysis (background, freedom to operate, protections, etc.)
RISK ANALYSIS
Availability of required knowledge in the consortium
Technical barriers identified and mitigation plan
Evaluation of other risks (financial, societal, law, resources, team,…) and mitigation plan

1,0
5,0
2,0
1,5
1,5

A3
FINANCIAL VIABILITY
A3.1 Project budget vs. market potential and scope of the project

3,0
1,0

A3.2
A3.3
A4
A4.1

Justification of requested KIC investment
Assessment of plan for KIC investment return
OPERATIONAL VIABILITY
Soundness of project plan (milestones, deliverables, availability of resources, etc.)

1,0
1,0
4,0
2,0

A4.2
A4.3
A5
A5.1
A5.2
A5.3
A5.4

Soundness of consortium vs. value chain
Quality of project management
COMPLIANCE WITH KIC REQUIREMENTS
Integration of students, academics, education organisations
Potential to create business (start-ups, spin-offs, …)
Compliance with KIC InnoEnergy roadmap
Participation of SMEs

1,0
1,0
4,0
0,5
1,0
2,0
0,5

Copyright © 2013 KIC InnoEnergy

9
Technology assessment and Innovation project selection
Tools

Copyright © 2013 KIC InnoEnergy

10
Technology assessment and Innovation project selection
Tools

CRL [6]

CRL [3-5]

CRL [1-2]

TRL [1-3]

Co. [2016-2017]

TRL [4-6]

Co. [2018-2019]

TRL [7-9]

Co. [after 2020]

TAM [-]
TAM [~]
TAM [+]

Copyright © 2013 KIC InnoEnergy

11
Innovation Projects
Market relevance / WP0

Topic (headline)
1. Product/service definition:
a. Product/service definition/specification
b. Technical assessment
c. Problem statement
d. Innovativeness
e. Technical benchmark, alternative without

2. Market analysis
a. Market benchmark (3-5 years)
b. Product Market Combination’s, /unique
selling points
c. Customer business case (why would the
customer buy?)
d. Business case, (how to make profit?)

Deliverable from WP0
List of expected products and/or services
Assessment of technical aspects
Description of what needs to be done technically
Comparison and differentiation of the expected products and/or services with
the state of the art
Positioning of the function/performance of the expected products and/or
services versus state of the art

Target market segments and their sizes in Mio €
List of major competitors and unique selling points of the new products
Rentability analysis draft (profit and loss calculation) from vierwpoint of the
customer
Rentability analysis draft of the project's product (profit and loss calculation)
from vierwpoint of the supplier / manufacturer of the product and/or service

e. Marketing 3P’s (place, price, promotion)
Draft of the markleting plan
f. Required investment to overcome the valley Draft of the investment plan
of death?

Copyright © 2013 KIC InnoEnergy

12
Innovation Projects
Market relevance / WP0

3. Competitive analysis:
a. Market price at market entrance (because of Target cost and price of the new products and/or services
design to cost)
b. Competitors and the difference with the
List of competitors and the value proposition of their competing
proposed proposition
products/services. Differentiation of the expected products/services from
competing products/services
c. Value chain available and connected?
Description of all steps that need to be covered to make the new product /
service available and who performs them
d. Industrial partners committed? (project
Major parts of the value chain are covered by partners to the consortium.
consortium)
These partners contribute adequate own resources and receive adequate KIC
funding.
Prefered form of the deliverable: Signed commitment from industrial partners
(Project Agreement or LoI)
4. Freedom to operate:
a. Intellectual Property: own

IP Agreement which lists identified Background in the consortium and makes
it available to the consortium and partners in the value chain.
b. Intellectual Property: hostile
External IP identified and analyzed with the result that development and
production of the new products / services is not restricted by external IP
c. Intellectual property: foreground and licensing List of areas where new IP is expected, and to whom this new IP shall be
licensed
5. Detailed project plan/WBS
a. What, when, who, where to reach the goal. Sound project plan
b. What are the deliverables in scheme
Milestones and output-oriented deliverables defined
c. Risk’s and mitigation
Risk analysis and mitigation plan available:
Risks identified and sound mitigation actions established?
Copyright © 2013 KIC InnoEnergy

13

More Related Content

What's hot

ISCF Application of whole Genome Sequencing approaches to Cancer
ISCF Application of whole Genome Sequencing approaches to CancerISCF Application of whole Genome Sequencing approaches to Cancer
ISCF Application of whole Genome Sequencing approaches to CancerKTN
 
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...KTN
 
Industrial Strategy Challenge Fund: Industrial Decarbonisation Challenge
Industrial Strategy Challenge Fund: Industrial Decarbonisation ChallengeIndustrial Strategy Challenge Fund: Industrial Decarbonisation Challenge
Industrial Strategy Challenge Fund: Industrial Decarbonisation ChallengeKTN
 
Management KTP - Learn about this new KTP funding opportunity to expand manag...
Management KTP - Learn about this new KTP funding opportunity to expand manag...Management KTP - Learn about this new KTP funding opportunity to expand manag...
Management KTP - Learn about this new KTP funding opportunity to expand manag...KTN
 
Innovation Funding for Growth-Oriented Companies - Oct 24, 2014
Innovation Funding for Growth-Oriented Companies - Oct 24, 2014Innovation Funding for Growth-Oriented Companies - Oct 24, 2014
Innovation Funding for Growth-Oriented Companies - Oct 24, 2014Boast Capital
 
Integrating renewables and grids
Integrating renewables and gridsIntegrating renewables and grids
Integrating renewables and gridsDanny De Schutter
 
MARIE - sara bedin_eos_udine_17.05.2013
MARIE - sara bedin_eos_udine_17.05.2013MARIE - sara bedin_eos_udine_17.05.2013
MARIE - sara bedin_eos_udine_17.05.2013AREA Science Park
 
GCRF Demonstrate Impact Competition Briefing - Cardiff: Responsible Consumpt...
 GCRF Demonstrate Impact Competition Briefing - Cardiff: Responsible Consumpt... GCRF Demonstrate Impact Competition Briefing - Cardiff: Responsible Consumpt...
GCRF Demonstrate Impact Competition Briefing - Cardiff: Responsible Consumpt...KTN
 
BCA_Media_Release_GBIC_Demo_110315
BCA_Media_Release_GBIC_Demo_110315BCA_Media_Release_GBIC_Demo_110315
BCA_Media_Release_GBIC_Demo_110315Simon Thomas
 
SMEs Support & Financial Instruments in HORIZON 2020 - J.D Malo - Presentatio...
SMEs Support & Financial Instruments in HORIZON 2020 - J.D Malo - Presentatio...SMEs Support & Financial Instruments in HORIZON 2020 - J.D Malo - Presentatio...
SMEs Support & Financial Instruments in HORIZON 2020 - J.D Malo - Presentatio...ISERD Israel
 
Gemalto's view on EUREKA Clusters
Gemalto's view on EUREKA ClustersGemalto's view on EUREKA Clusters
Gemalto's view on EUREKA ClustersEUREKA Secretariat
 
2014_Class-B-Report_CSA
2014_Class-B-Report_CSA2014_Class-B-Report_CSA
2014_Class-B-Report_CSADaniele Horton
 
GCRF Demonstrate Impact Competition Briefing - Belfast: Sustainable Cities & ...
GCRF Demonstrate Impact Competition Briefing - Belfast: Sustainable Cities & ...GCRF Demonstrate Impact Competition Briefing - Belfast: Sustainable Cities & ...
GCRF Demonstrate Impact Competition Briefing - Belfast: Sustainable Cities & ...KTN
 
KAnalysis - Patent Success Stories
KAnalysis - Patent Success StoriesKAnalysis - Patent Success Stories
KAnalysis - Patent Success Storiesashutosh choudhary
 
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...KTN
 
BlueTech Research Breakfast Briefing for WEFTEC 2017
BlueTech Research Breakfast Briefing for WEFTEC 2017BlueTech Research Breakfast Briefing for WEFTEC 2017
BlueTech Research Breakfast Briefing for WEFTEC 2017Nadia Reckmann
 
PV Insider LATAM 2013 photovoltaics conference
PV Insider LATAM 2013 photovoltaics conferencePV Insider LATAM 2013 photovoltaics conference
PV Insider LATAM 2013 photovoltaics conferenceDavid Williams
 
CSR funding in Career counselling
CSR funding in Career counsellingCSR funding in Career counselling
CSR funding in Career counsellingAakanksha Aggarwal
 
Our Blue Economy - Karp Strategies
Our Blue Economy - Karp StrategiesOur Blue Economy - Karp Strategies
Our Blue Economy - Karp StrategiesCarter Craft
 

What's hot (20)

ISCF Application of whole Genome Sequencing approaches to Cancer
ISCF Application of whole Genome Sequencing approaches to CancerISCF Application of whole Genome Sequencing approaches to Cancer
ISCF Application of whole Genome Sequencing approaches to Cancer
 
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
 
Industrial Strategy Challenge Fund: Industrial Decarbonisation Challenge
Industrial Strategy Challenge Fund: Industrial Decarbonisation ChallengeIndustrial Strategy Challenge Fund: Industrial Decarbonisation Challenge
Industrial Strategy Challenge Fund: Industrial Decarbonisation Challenge
 
Management KTP - Learn about this new KTP funding opportunity to expand manag...
Management KTP - Learn about this new KTP funding opportunity to expand manag...Management KTP - Learn about this new KTP funding opportunity to expand manag...
Management KTP - Learn about this new KTP funding opportunity to expand manag...
 
Innovation Funding for Growth-Oriented Companies - Oct 24, 2014
Innovation Funding for Growth-Oriented Companies - Oct 24, 2014Innovation Funding for Growth-Oriented Companies - Oct 24, 2014
Innovation Funding for Growth-Oriented Companies - Oct 24, 2014
 
Project Realise
Project RealiseProject Realise
Project Realise
 
Integrating renewables and grids
Integrating renewables and gridsIntegrating renewables and grids
Integrating renewables and grids
 
MARIE - sara bedin_eos_udine_17.05.2013
MARIE - sara bedin_eos_udine_17.05.2013MARIE - sara bedin_eos_udine_17.05.2013
MARIE - sara bedin_eos_udine_17.05.2013
 
GCRF Demonstrate Impact Competition Briefing - Cardiff: Responsible Consumpt...
 GCRF Demonstrate Impact Competition Briefing - Cardiff: Responsible Consumpt... GCRF Demonstrate Impact Competition Briefing - Cardiff: Responsible Consumpt...
GCRF Demonstrate Impact Competition Briefing - Cardiff: Responsible Consumpt...
 
BCA_Media_Release_GBIC_Demo_110315
BCA_Media_Release_GBIC_Demo_110315BCA_Media_Release_GBIC_Demo_110315
BCA_Media_Release_GBIC_Demo_110315
 
SMEs Support & Financial Instruments in HORIZON 2020 - J.D Malo - Presentatio...
SMEs Support & Financial Instruments in HORIZON 2020 - J.D Malo - Presentatio...SMEs Support & Financial Instruments in HORIZON 2020 - J.D Malo - Presentatio...
SMEs Support & Financial Instruments in HORIZON 2020 - J.D Malo - Presentatio...
 
Gemalto's view on EUREKA Clusters
Gemalto's view on EUREKA ClustersGemalto's view on EUREKA Clusters
Gemalto's view on EUREKA Clusters
 
2014_Class-B-Report_CSA
2014_Class-B-Report_CSA2014_Class-B-Report_CSA
2014_Class-B-Report_CSA
 
GCRF Demonstrate Impact Competition Briefing - Belfast: Sustainable Cities & ...
GCRF Demonstrate Impact Competition Briefing - Belfast: Sustainable Cities & ...GCRF Demonstrate Impact Competition Briefing - Belfast: Sustainable Cities & ...
GCRF Demonstrate Impact Competition Briefing - Belfast: Sustainable Cities & ...
 
KAnalysis - Patent Success Stories
KAnalysis - Patent Success StoriesKAnalysis - Patent Success Stories
KAnalysis - Patent Success Stories
 
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
 
BlueTech Research Breakfast Briefing for WEFTEC 2017
BlueTech Research Breakfast Briefing for WEFTEC 2017BlueTech Research Breakfast Briefing for WEFTEC 2017
BlueTech Research Breakfast Briefing for WEFTEC 2017
 
PV Insider LATAM 2013 photovoltaics conference
PV Insider LATAM 2013 photovoltaics conferencePV Insider LATAM 2013 photovoltaics conference
PV Insider LATAM 2013 photovoltaics conference
 
CSR funding in Career counselling
CSR funding in Career counsellingCSR funding in Career counselling
CSR funding in Career counselling
 
Our Blue Economy - Karp Strategies
Our Blue Economy - Karp StrategiesOur Blue Economy - Karp Strategies
Our Blue Economy - Karp Strategies
 

Viewers also liked

Maghrenov workshop-on-capacity-building-eu-mpc-erasmus
Maghrenov workshop-on-capacity-building-eu-mpc-erasmusMaghrenov workshop-on-capacity-building-eu-mpc-erasmus
Maghrenov workshop-on-capacity-building-eu-mpc-erasmusMaghrenov
 
Maghrenov workshop-on-capacity-building-eu-capacity-building-concept-in-the-f...
Maghrenov workshop-on-capacity-building-eu-capacity-building-concept-in-the-f...Maghrenov workshop-on-capacity-building-eu-capacity-building-concept-in-the-f...
Maghrenov workshop-on-capacity-building-eu-capacity-building-concept-in-the-f...Maghrenov
 
MAGHRENOV Seminar on support to business creation: "Investing in the energy s...
MAGHRENOV Seminar on support to business creation: "Investing in the energy s...MAGHRENOV Seminar on support to business creation: "Investing in the energy s...
MAGHRENOV Seminar on support to business creation: "Investing in the energy s...Maghrenov
 
Chris Gauci: Maghrenov kickoff Barcelona - Day 1
Chris Gauci: Maghrenov kickoff Barcelona - Day 1Chris Gauci: Maghrenov kickoff Barcelona - Day 1
Chris Gauci: Maghrenov kickoff Barcelona - Day 1Maghrenov
 
Maghrenov workshop-on-capacity-building-eu-euro-mediterranean-cooperation-on-...
Maghrenov workshop-on-capacity-building-eu-euro-mediterranean-cooperation-on-...Maghrenov workshop-on-capacity-building-eu-euro-mediterranean-cooperation-on-...
Maghrenov workshop-on-capacity-building-eu-euro-mediterranean-cooperation-on-...Maghrenov
 
European energy context an overview of EU priorities, Maghrenov brokerage eve...
European energy context an overview of EU priorities, Maghrenov brokerage eve...European energy context an overview of EU priorities, Maghrenov brokerage eve...
European energy context an overview of EU priorities, Maghrenov brokerage eve...Maghrenov
 
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...Maghrenov
 
MAGHRENOV deliverable 4.2: organisation of a network of associated partners
MAGHRENOV deliverable 4.2: organisation of a network of associated partnersMAGHRENOV deliverable 4.2: organisation of a network of associated partners
MAGHRENOV deliverable 4.2: organisation of a network of associated partnersMaghrenov
 
SOPHIA by Philippe Malbranch - Maghrenov workshop on research infrastructures...
SOPHIA by Philippe Malbranch - Maghrenov workshop on research infrastructures...SOPHIA by Philippe Malbranch - Maghrenov workshop on research infrastructures...
SOPHIA by Philippe Malbranch - Maghrenov workshop on research infrastructures...Maghrenov
 

Viewers also liked (9)

Maghrenov workshop-on-capacity-building-eu-mpc-erasmus
Maghrenov workshop-on-capacity-building-eu-mpc-erasmusMaghrenov workshop-on-capacity-building-eu-mpc-erasmus
Maghrenov workshop-on-capacity-building-eu-mpc-erasmus
 
Maghrenov workshop-on-capacity-building-eu-capacity-building-concept-in-the-f...
Maghrenov workshop-on-capacity-building-eu-capacity-building-concept-in-the-f...Maghrenov workshop-on-capacity-building-eu-capacity-building-concept-in-the-f...
Maghrenov workshop-on-capacity-building-eu-capacity-building-concept-in-the-f...
 
MAGHRENOV Seminar on support to business creation: "Investing in the energy s...
MAGHRENOV Seminar on support to business creation: "Investing in the energy s...MAGHRENOV Seminar on support to business creation: "Investing in the energy s...
MAGHRENOV Seminar on support to business creation: "Investing in the energy s...
 
Chris Gauci: Maghrenov kickoff Barcelona - Day 1
Chris Gauci: Maghrenov kickoff Barcelona - Day 1Chris Gauci: Maghrenov kickoff Barcelona - Day 1
Chris Gauci: Maghrenov kickoff Barcelona - Day 1
 
Maghrenov workshop-on-capacity-building-eu-euro-mediterranean-cooperation-on-...
Maghrenov workshop-on-capacity-building-eu-euro-mediterranean-cooperation-on-...Maghrenov workshop-on-capacity-building-eu-euro-mediterranean-cooperation-on-...
Maghrenov workshop-on-capacity-building-eu-euro-mediterranean-cooperation-on-...
 
European energy context an overview of EU priorities, Maghrenov brokerage eve...
European energy context an overview of EU priorities, Maghrenov brokerage eve...European energy context an overview of EU priorities, Maghrenov brokerage eve...
European energy context an overview of EU priorities, Maghrenov brokerage eve...
 
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
Innovation week, Road map for renewables in palestine tubas as a model, by Ab...
 
MAGHRENOV deliverable 4.2: organisation of a network of associated partners
MAGHRENOV deliverable 4.2: organisation of a network of associated partnersMAGHRENOV deliverable 4.2: organisation of a network of associated partners
MAGHRENOV deliverable 4.2: organisation of a network of associated partners
 
SOPHIA by Philippe Malbranch - Maghrenov workshop on research infrastructures...
SOPHIA by Philippe Malbranch - Maghrenov workshop on research infrastructures...SOPHIA by Philippe Malbranch - Maghrenov workshop on research infrastructures...
SOPHIA by Philippe Malbranch - Maghrenov workshop on research infrastructures...
 

Similar to Kic InnoEnergy: Strategy, Maghrenov kickoff Barcelona - Day 2

2014 12 05 mare training course
2014 12 05 mare training course2014 12 05 mare training course
2014 12 05 mare training courseMARE EuroMed
 
UtiliVATION - Utility Innovation - Indigo Advisory Group
UtiliVATION - Utility Innovation - Indigo Advisory GroupUtiliVATION - Utility Innovation - Indigo Advisory Group
UtiliVATION - Utility Innovation - Indigo Advisory GroupIndigo Advisory Group
 
White Paper_RIBER_Kunal
White Paper_RIBER_KunalWhite Paper_RIBER_Kunal
White Paper_RIBER_Kunalkunalparekh27
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingInvest Northern Ireland
 
The Future of Aerospace – More Software Please!
The Future of Aerospace – More Software Please!The Future of Aerospace – More Software Please!
The Future of Aerospace – More Software Please!AdaCore
 
Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingKTN
 
Bangladesh ic-design-program-rev4-1 bd
Bangladesh ic-design-program-rev4-1 bdBangladesh ic-design-program-rev4-1 bd
Bangladesh ic-design-program-rev4-1 bdkhalid noman husainy
 
MAGHRENOV deliverable 3.4: Catalogue of evaluated competence
MAGHRENOV deliverable 3.4: Catalogue of evaluated competenceMAGHRENOV deliverable 3.4: Catalogue of evaluated competence
MAGHRENOV deliverable 3.4: Catalogue of evaluated competenceMaghrenov
 
Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...oyinleye
 
Catalyzing Growth through Industry-Academia Collaboration
Catalyzing Growth through Industry-Academia CollaborationCatalyzing Growth through Industry-Academia Collaboration
Catalyzing Growth through Industry-Academia CollaborationNorAzmi Alias
 
Jisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposalJisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposalTony Toole
 
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2Suhas Dutta
 
Larsen & Toubro - Outthink 2017 (Strategy Case Competition) - National Finalists
Larsen & Toubro - Outthink 2017 (Strategy Case Competition) - National FinalistsLarsen & Toubro - Outthink 2017 (Strategy Case Competition) - National Finalists
Larsen & Toubro - Outthink 2017 (Strategy Case Competition) - National FinalistsAnupreet Choudhary
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 CourAbramMartino96
 
Application enablement stephan massalt (kpn netco)
Application enablement   stephan massalt (kpn netco)Application enablement   stephan massalt (kpn netco)
Application enablement stephan massalt (kpn netco)Stephan Massalt
 
APM Hinkley Point C - how to build a power station, Ken Owen, presentation
APM Hinkley Point C - how to build a power station, Ken Owen, presentationAPM Hinkley Point C - how to build a power station, Ken Owen, presentation
APM Hinkley Point C - how to build a power station, Ken Owen, presentationAssociation for Project Management
 

Similar to Kic InnoEnergy: Strategy, Maghrenov kickoff Barcelona - Day 2 (20)

2014 12 05 mare training course
2014 12 05 mare training course2014 12 05 mare training course
2014 12 05 mare training course
 
UtiliVATION - Utility Innovation - Indigo Advisory Group
UtiliVATION - Utility Innovation - Indigo Advisory GroupUtiliVATION - Utility Innovation - Indigo Advisory Group
UtiliVATION - Utility Innovation - Indigo Advisory Group
 
White Paper_RIBER_Kunal
White Paper_RIBER_KunalWhite Paper_RIBER_Kunal
White Paper_RIBER_Kunal
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
The Future of Aerospace – More Software Please!
The Future of Aerospace – More Software Please!The Future of Aerospace – More Software Please!
The Future of Aerospace – More Software Please!
 
Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition Briefing
 
Adhi Satriya, PT Andritz Hydro, 2014 ASEAN-OECD Investment Policy Conference
Adhi Satriya, PT Andritz Hydro, 2014 ASEAN-OECD Investment Policy ConferenceAdhi Satriya, PT Andritz Hydro, 2014 ASEAN-OECD Investment Policy Conference
Adhi Satriya, PT Andritz Hydro, 2014 ASEAN-OECD Investment Policy Conference
 
Bangladesh ic-design-program-rev4-1 bd
Bangladesh ic-design-program-rev4-1 bdBangladesh ic-design-program-rev4-1 bd
Bangladesh ic-design-program-rev4-1 bd
 
MAGHRENOV deliverable 3.4: Catalogue of evaluated competence
MAGHRENOV deliverable 3.4: Catalogue of evaluated competenceMAGHRENOV deliverable 3.4: Catalogue of evaluated competence
MAGHRENOV deliverable 3.4: Catalogue of evaluated competence
 
Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...Opportunities and role of the quantity surveyor in green building project dev...
Opportunities and role of the quantity surveyor in green building project dev...
 
Catalyzing Growth through Industry-Academia Collaboration
Catalyzing Growth through Industry-Academia CollaborationCatalyzing Growth through Industry-Academia Collaboration
Catalyzing Growth through Industry-Academia Collaboration
 
CCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference SeminarCCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference Seminar
 
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
 
Jisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposalJisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposal
 
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
Entpreneurial Management (EM04_02 ) starting up a small scale industry - 2
 
Larsen & Toubro - Outthink 2017 (Strategy Case Competition) - National Finalists
Larsen & Toubro - Outthink 2017 (Strategy Case Competition) - National FinalistsLarsen & Toubro - Outthink 2017 (Strategy Case Competition) - National Finalists
Larsen & Toubro - Outthink 2017 (Strategy Case Competition) - National Finalists
 
20150923 ec h2020 nmbp 2016 valles
20150923 ec h2020 nmbp 2016 valles20150923 ec h2020 nmbp 2016 valles
20150923 ec h2020 nmbp 2016 valles
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
 
Application enablement stephan massalt (kpn netco)
Application enablement   stephan massalt (kpn netco)Application enablement   stephan massalt (kpn netco)
Application enablement stephan massalt (kpn netco)
 
APM Hinkley Point C - how to build a power station, Ken Owen, presentation
APM Hinkley Point C - how to build a power station, Ken Owen, presentationAPM Hinkley Point C - how to build a power station, Ken Owen, presentation
APM Hinkley Point C - how to build a power station, Ken Owen, presentation
 

More from Maghrenov

MAGHRENOV International Conference Programme
MAGHRENOV International Conference ProgrammeMAGHRENOV International Conference Programme
MAGHRENOV International Conference ProgrammeMaghrenov
 
White paper concerning new educational entrepreneurial programs
White paper concerning new educational entrepreneurial programsWhite paper concerning new educational entrepreneurial programs
White paper concerning new educational entrepreneurial programsMaghrenov
 
White paper concerning new adequate infrastructure
White paper concerning new adequate infrastructureWhite paper concerning new adequate infrastructure
White paper concerning new adequate infrastructureMaghrenov
 
VISION PAPER FOR AN ERA-NET+
VISION PAPER FOR AN ERA-NET+VISION PAPER FOR AN ERA-NET+
VISION PAPER FOR AN ERA-NET+Maghrenov
 
MAGHRENOV deliverable 2.2: Dedicated workshop defining future needs for HR ca...
MAGHRENOV deliverable 2.2: Dedicated workshop defining future needs for HR ca...MAGHRENOV deliverable 2.2: Dedicated workshop defining future needs for HR ca...
MAGHRENOV deliverable 2.2: Dedicated workshop defining future needs for HR ca...Maghrenov
 
MAGHRENOV deliverable 3.7: Workshop articulating with ESFRI agenda
MAGHRENOV deliverable 3.7: Workshop articulating with ESFRI agendaMAGHRENOV deliverable 3.7: Workshop articulating with ESFRI agenda
MAGHRENOV deliverable 3.7: Workshop articulating with ESFRI agendaMaghrenov
 
MAGHRENOV deliverable 3.6: List of existing facilities along with the ESFRI c...
MAGHRENOV deliverable 3.6: List of existing facilities along with the ESFRI c...MAGHRENOV deliverable 3.6: List of existing facilities along with the ESFRI c...
MAGHRENOV deliverable 3.6: List of existing facilities along with the ESFRI c...Maghrenov
 
MAGHRENOV deliverable 5.1: Tested service package for entrepreneurs
MAGHRENOV deliverable 5.1: Tested service package for entrepreneursMAGHRENOV deliverable 5.1: Tested service package for entrepreneurs
MAGHRENOV deliverable 5.1: Tested service package for entrepreneursMaghrenov
 
MAGHRENOV deliverable 2.3: Industrial internship programme
MAGHRENOV deliverable 2.3: Industrial internship programmeMAGHRENOV deliverable 2.3: Industrial internship programme
MAGHRENOV deliverable 2.3: Industrial internship programmeMaghrenov
 
MAGHRENOV deliverable 2.4: Detailed MSc program
MAGHRENOV deliverable 2.4: Detailed MSc programMAGHRENOV deliverable 2.4: Detailed MSc program
MAGHRENOV deliverable 2.4: Detailed MSc programMaghrenov
 
MAGHRENOV deliverable 2.1: Roadmap of an EU-MPC entrepreneurial education pro...
MAGHRENOV deliverable 2.1: Roadmap of an EU-MPC entrepreneurial education pro...MAGHRENOV deliverable 2.1: Roadmap of an EU-MPC entrepreneurial education pro...
MAGHRENOV deliverable 2.1: Roadmap of an EU-MPC entrepreneurial education pro...Maghrenov
 
MAGHRENOV deliverable 5.2: 3 seminars with other R2I projects Medspring and B...
MAGHRENOV deliverable 5.2: 3 seminars with other R2I projects Medspring and B...MAGHRENOV deliverable 5.2: 3 seminars with other R2I projects Medspring and B...
MAGHRENOV deliverable 5.2: 3 seminars with other R2I projects Medspring and B...Maghrenov
 
MAGHRENOV deliverable 3.8 Investments opportunities report on research infras...
MAGHRENOV deliverable 3.8 Investments opportunities report on research infras...MAGHRENOV deliverable 3.8 Investments opportunities report on research infras...
MAGHRENOV deliverable 3.8 Investments opportunities report on research infras...Maghrenov
 
Tunis workshop Maghrenov "Reseau TICS experience du Maroc"
Tunis workshop Maghrenov "Reseau TICS experience du Maroc"Tunis workshop Maghrenov "Reseau TICS experience du Maroc"
Tunis workshop Maghrenov "Reseau TICS experience du Maroc"Maghrenov
 
Tunis workshop Maghrenov "Réseau National des pépinières d'entreprises servic...
Tunis workshop Maghrenov "Réseau National des pépinières d'entreprises servic...Tunis workshop Maghrenov "Réseau National des pépinières d'entreprises servic...
Tunis workshop Maghrenov "Réseau National des pépinières d'entreprises servic...Maghrenov
 
Tunis workshop Maghrenov- République Tunisienne, Ministère de l'enseignement ...
Tunis workshop Maghrenov- République Tunisienne, Ministère de l'enseignement ...Tunis workshop Maghrenov- République Tunisienne, Ministère de l'enseignement ...
Tunis workshop Maghrenov- République Tunisienne, Ministère de l'enseignement ...Maghrenov
 
Tunis workshop Maghrenov : Présentation KIC innoEnergy SE
Tunis workshop Maghrenov : Présentation KIC innoEnergy SETunis workshop Maghrenov : Présentation KIC innoEnergy SE
Tunis workshop Maghrenov : Présentation KIC innoEnergy SEMaghrenov
 
Tunis workshop Maghrenov : le plan solaire Djérid 2030
Tunis workshop Maghrenov : le plan solaire Djérid 2030Tunis workshop Maghrenov : le plan solaire Djérid 2030
Tunis workshop Maghrenov : le plan solaire Djérid 2030Maghrenov
 
Tunis workshop Maghrenov : la veille scientifique et technologique à travers ...
Tunis workshop Maghrenov : la veille scientifique et technologique à travers ...Tunis workshop Maghrenov : la veille scientifique et technologique à travers ...
Tunis workshop Maghrenov : la veille scientifique et technologique à travers ...Maghrenov
 
Tunis workshop Maghrenov : Elaid Ben Ali, Directeur technique société de gest...
Tunis workshop Maghrenov : Elaid Ben Ali, Directeur technique société de gest...Tunis workshop Maghrenov : Elaid Ben Ali, Directeur technique société de gest...
Tunis workshop Maghrenov : Elaid Ben Ali, Directeur technique société de gest...Maghrenov
 

More from Maghrenov (20)

MAGHRENOV International Conference Programme
MAGHRENOV International Conference ProgrammeMAGHRENOV International Conference Programme
MAGHRENOV International Conference Programme
 
White paper concerning new educational entrepreneurial programs
White paper concerning new educational entrepreneurial programsWhite paper concerning new educational entrepreneurial programs
White paper concerning new educational entrepreneurial programs
 
White paper concerning new adequate infrastructure
White paper concerning new adequate infrastructureWhite paper concerning new adequate infrastructure
White paper concerning new adequate infrastructure
 
VISION PAPER FOR AN ERA-NET+
VISION PAPER FOR AN ERA-NET+VISION PAPER FOR AN ERA-NET+
VISION PAPER FOR AN ERA-NET+
 
MAGHRENOV deliverable 2.2: Dedicated workshop defining future needs for HR ca...
MAGHRENOV deliverable 2.2: Dedicated workshop defining future needs for HR ca...MAGHRENOV deliverable 2.2: Dedicated workshop defining future needs for HR ca...
MAGHRENOV deliverable 2.2: Dedicated workshop defining future needs for HR ca...
 
MAGHRENOV deliverable 3.7: Workshop articulating with ESFRI agenda
MAGHRENOV deliverable 3.7: Workshop articulating with ESFRI agendaMAGHRENOV deliverable 3.7: Workshop articulating with ESFRI agenda
MAGHRENOV deliverable 3.7: Workshop articulating with ESFRI agenda
 
MAGHRENOV deliverable 3.6: List of existing facilities along with the ESFRI c...
MAGHRENOV deliverable 3.6: List of existing facilities along with the ESFRI c...MAGHRENOV deliverable 3.6: List of existing facilities along with the ESFRI c...
MAGHRENOV deliverable 3.6: List of existing facilities along with the ESFRI c...
 
MAGHRENOV deliverable 5.1: Tested service package for entrepreneurs
MAGHRENOV deliverable 5.1: Tested service package for entrepreneursMAGHRENOV deliverable 5.1: Tested service package for entrepreneurs
MAGHRENOV deliverable 5.1: Tested service package for entrepreneurs
 
MAGHRENOV deliverable 2.3: Industrial internship programme
MAGHRENOV deliverable 2.3: Industrial internship programmeMAGHRENOV deliverable 2.3: Industrial internship programme
MAGHRENOV deliverable 2.3: Industrial internship programme
 
MAGHRENOV deliverable 2.4: Detailed MSc program
MAGHRENOV deliverable 2.4: Detailed MSc programMAGHRENOV deliverable 2.4: Detailed MSc program
MAGHRENOV deliverable 2.4: Detailed MSc program
 
MAGHRENOV deliverable 2.1: Roadmap of an EU-MPC entrepreneurial education pro...
MAGHRENOV deliverable 2.1: Roadmap of an EU-MPC entrepreneurial education pro...MAGHRENOV deliverable 2.1: Roadmap of an EU-MPC entrepreneurial education pro...
MAGHRENOV deliverable 2.1: Roadmap of an EU-MPC entrepreneurial education pro...
 
MAGHRENOV deliverable 5.2: 3 seminars with other R2I projects Medspring and B...
MAGHRENOV deliverable 5.2: 3 seminars with other R2I projects Medspring and B...MAGHRENOV deliverable 5.2: 3 seminars with other R2I projects Medspring and B...
MAGHRENOV deliverable 5.2: 3 seminars with other R2I projects Medspring and B...
 
MAGHRENOV deliverable 3.8 Investments opportunities report on research infras...
MAGHRENOV deliverable 3.8 Investments opportunities report on research infras...MAGHRENOV deliverable 3.8 Investments opportunities report on research infras...
MAGHRENOV deliverable 3.8 Investments opportunities report on research infras...
 
Tunis workshop Maghrenov "Reseau TICS experience du Maroc"
Tunis workshop Maghrenov "Reseau TICS experience du Maroc"Tunis workshop Maghrenov "Reseau TICS experience du Maroc"
Tunis workshop Maghrenov "Reseau TICS experience du Maroc"
 
Tunis workshop Maghrenov "Réseau National des pépinières d'entreprises servic...
Tunis workshop Maghrenov "Réseau National des pépinières d'entreprises servic...Tunis workshop Maghrenov "Réseau National des pépinières d'entreprises servic...
Tunis workshop Maghrenov "Réseau National des pépinières d'entreprises servic...
 
Tunis workshop Maghrenov- République Tunisienne, Ministère de l'enseignement ...
Tunis workshop Maghrenov- République Tunisienne, Ministère de l'enseignement ...Tunis workshop Maghrenov- République Tunisienne, Ministère de l'enseignement ...
Tunis workshop Maghrenov- République Tunisienne, Ministère de l'enseignement ...
 
Tunis workshop Maghrenov : Présentation KIC innoEnergy SE
Tunis workshop Maghrenov : Présentation KIC innoEnergy SETunis workshop Maghrenov : Présentation KIC innoEnergy SE
Tunis workshop Maghrenov : Présentation KIC innoEnergy SE
 
Tunis workshop Maghrenov : le plan solaire Djérid 2030
Tunis workshop Maghrenov : le plan solaire Djérid 2030Tunis workshop Maghrenov : le plan solaire Djérid 2030
Tunis workshop Maghrenov : le plan solaire Djérid 2030
 
Tunis workshop Maghrenov : la veille scientifique et technologique à travers ...
Tunis workshop Maghrenov : la veille scientifique et technologique à travers ...Tunis workshop Maghrenov : la veille scientifique et technologique à travers ...
Tunis workshop Maghrenov : la veille scientifique et technologique à travers ...
 
Tunis workshop Maghrenov : Elaid Ben Ali, Directeur technique société de gest...
Tunis workshop Maghrenov : Elaid Ben Ali, Directeur technique société de gest...Tunis workshop Maghrenov : Elaid Ben Ali, Directeur technique société de gest...
Tunis workshop Maghrenov : Elaid Ben Ali, Directeur technique société de gest...
 

Recently uploaded

New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 

Recently uploaded (20)

New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 

Kic InnoEnergy: Strategy, Maghrenov kickoff Barcelona - Day 2

  • 1. KIC InnoEnergy Technology Strategy Magrenov December 16th and 17th, Barcelona Celine Jullien Industry Program Management Officer
  • 2. Content 1. Today’s objective and one message 2. The 3 building blocs of KIC InnoEnergyTechnology Strategy 3. Technology assessment and Innovation project selection 4. Link to innovation project management Copyright © 2013 KIC InnoEnergy 2
  • 3. Today’s objective …one challenge 1. A Technology Strategy to drive ACTIONS and make impact 2. Selected Variables are KEY 3. To be UPDATED One Challenge: To “Magrenoved” it all
  • 4. KIC InnoEnergy Technology Strategy – v2 (1/5) 3 building blocs: Strategy & Roadmap, Competence Mapping, Long term vision Competence mapping for Intra and Extra KIC Partners per thematic field Long term Vision Energy landscape 2022 2000-2012 2012-2017-2022 Strategy and Roadmap per thematic field 2013-2017 2000 2010 2013 2017 2022 Energy from Chemical Fuels KIC thematic fields Clean coal and Gas technologies Renewable energy Sustainable Nuclear and renewable energy convergence. Energy efficiency Smart and Intelligent Buildings and cities Smart grids and electric storage Copyright © 2013 KIC InnoEnergy 4
  • 5. KIC InnoEnergy Technology Strategy – v2 (2/5) 3 building blocs: Strategy and Roadmap, Competence Mapping, Long term vision Objectives and methods Strategy and Roadmap per thematic field 2013-2017 • To build KIC strategic medium term roadmap per thematic field • Identify market challenges, business drivers and technologies to address those challenges • Assess KIC “Impactability” of selected topic, • Decide in which energy technologies to focus • Identify Industry value chain necessary, • Defining actions needed to increase “impactability” • Homogeneization & quality (value chain, technoeconomic data, depth and width) • Sounder iterations (stakeholders involved) • More discrimination Competence mapping for Intra and Extra KIC Partners per thematic field 2000-2012 • To provide an in depth understanding of KIC partners competences in the energy landscape • Analyzing KIC partners’ innovation capacity , characterized by Key Performance Indicators (KPI) • Mapping over 74 technology segments identified over the six KIC thematic fields • Identifying key players outside KIC; Top 10 players and future game changers • Better granularity (homogeneity, discrimination) per technologies • Complement analyzed KPIs • Freeze T0 Long term Vision Energy landscape 2022 2012-2017-2022 • To depict the whole energy landscape and produce a forward looking EU energy landscape and KIC positioning • In a five plus five year timeframe • Using both user and supplier perspectives • Per existing KIC thematic fields and new ones. • Screening 115 energy technologies • Decide where to priorize KIC investment (impactability, risk reward) • Homogeneize taxonomy with the other 2 building blocks • Define portfolio management criteria • Define investment strategy criteria 5
  • 6. KIC InnoEnergy Technology Strategy – v2 (3/5) 3 building blocs: Strategy and Roadmap, Competence Mapping, Long term vision Assessment criteria Strategy and Roadmap per thematic field 2013-2016 Criteria for Technology Assessment  Shortest Time to market (for the technology involved)  Highest impact in: Energy cost decrease, Increase of operability, decrease of GHG effects  Leadership and competence of KIC partners in the said topic and technology  Declared KIC industry interest and commitment  Foreseeable regulatory impact  Required investment to develop the innovations  Cross impact in several applications  IRL Competence mapping for Intra and Extra KIC Partners per thematic field 2000-2012 Patent, publication and R&D data base  IP Scoring • Number of Patents • Quality of Patents  Innovation Scoring • R&D capacity • Strategic index  R&D scoring • Publications • Quality of publications • Collaboration scoring • # of R&D&I projects/$ • R&D&I partners quality • Valorization capacityscoring • # products in market • # spin-offs created Copyright © 2013 KIC InnoEnergy Long term Vision Energy landscape 2022 2012-2017-2022 Key criteria to select Technologies :  Consumer Readiness Level and Technology Readiness Levels (CRL-TRL) fit an gap from CRL =3+; TRL=6 to CRL=4; TRL= 8-9)  Size of the potential market 2022: Large and at least European or even Global  Risk-reward map is the final selection criteria to have a balanced porfolio • Define portfolio management criteria (IRL) • Define investment strategy criteria 6
  • 7. KIC InnoEnergy Technology Strategy v2 (4/5) 3 building blocs: Strategy and Roadmap, Competence Mapping, Long term vision Assessment visuals Strategy and Roadmap per thematic field 2013-2017 Competence mapping for Intra and Extra KIC Partners per thematic field 2000-2012 Copyright © 2013 KIC InnoEnergy Long term Vision Energy landscape 2022 2012-2017-2022 7
  • 8. KIC InnoEnergy Technology Strategy v2- (5/5) 3 building blocs: Strategy and Roadmap, Competence Mapping, Long term vision Results Strategy and Roadmap per thematic field 2013-2016 Competence mapping for Intra and Extra KIC Partners per thematic field 2000-2012 Long term Vision Energy landscape 2022 2012-2017-2022 Thematic Field: Sustainable Thematic Field:Smart Thematic Field: Intelligent Nuclear and Renewable Grids and Electric Thematic Field Clean EnergyStorage Field Efficient Convergence Thematic Buildings Coal and Gas and Cities Field Thematic Energy from Technologies Renewable Chemical Fuels Energies Copyright © 2013 KIC InnoEnergy 8
  • 9. Technology assessment and Innovation project selection Objectives and criteria Objectives 1.Assess Innovation Project Proposals 2.Propose a ranking for KIC investment commitment Assessment criteria (transparent, formalized, communicated, known) A1 BUSINESS DEVELOPMENT A1.1 Preliminary product or service definition (problem statement, solution benchmark,…) 6,0 2,0 A1.2 Business opportunity assessment (market analysis, competitive analysis, value proposition 3,0 A1.3 A2 A2.1 A2.2 A2.3 for customers, ...) Soundness of IP analysis (background, freedom to operate, protections, etc.) RISK ANALYSIS Availability of required knowledge in the consortium Technical barriers identified and mitigation plan Evaluation of other risks (financial, societal, law, resources, team,…) and mitigation plan 1,0 5,0 2,0 1,5 1,5 A3 FINANCIAL VIABILITY A3.1 Project budget vs. market potential and scope of the project 3,0 1,0 A3.2 A3.3 A4 A4.1 Justification of requested KIC investment Assessment of plan for KIC investment return OPERATIONAL VIABILITY Soundness of project plan (milestones, deliverables, availability of resources, etc.) 1,0 1,0 4,0 2,0 A4.2 A4.3 A5 A5.1 A5.2 A5.3 A5.4 Soundness of consortium vs. value chain Quality of project management COMPLIANCE WITH KIC REQUIREMENTS Integration of students, academics, education organisations Potential to create business (start-ups, spin-offs, …) Compliance with KIC InnoEnergy roadmap Participation of SMEs 1,0 1,0 4,0 0,5 1,0 2,0 0,5 Copyright © 2013 KIC InnoEnergy 9
  • 10. Technology assessment and Innovation project selection Tools Copyright © 2013 KIC InnoEnergy 10
  • 11. Technology assessment and Innovation project selection Tools CRL [6] CRL [3-5] CRL [1-2] TRL [1-3] Co. [2016-2017] TRL [4-6] Co. [2018-2019] TRL [7-9] Co. [after 2020] TAM [-] TAM [~] TAM [+] Copyright © 2013 KIC InnoEnergy 11
  • 12. Innovation Projects Market relevance / WP0 Topic (headline) 1. Product/service definition: a. Product/service definition/specification b. Technical assessment c. Problem statement d. Innovativeness e. Technical benchmark, alternative without 2. Market analysis a. Market benchmark (3-5 years) b. Product Market Combination’s, /unique selling points c. Customer business case (why would the customer buy?) d. Business case, (how to make profit?) Deliverable from WP0 List of expected products and/or services Assessment of technical aspects Description of what needs to be done technically Comparison and differentiation of the expected products and/or services with the state of the art Positioning of the function/performance of the expected products and/or services versus state of the art Target market segments and their sizes in Mio € List of major competitors and unique selling points of the new products Rentability analysis draft (profit and loss calculation) from vierwpoint of the customer Rentability analysis draft of the project's product (profit and loss calculation) from vierwpoint of the supplier / manufacturer of the product and/or service e. Marketing 3P’s (place, price, promotion) Draft of the markleting plan f. Required investment to overcome the valley Draft of the investment plan of death? Copyright © 2013 KIC InnoEnergy 12
  • 13. Innovation Projects Market relevance / WP0 3. Competitive analysis: a. Market price at market entrance (because of Target cost and price of the new products and/or services design to cost) b. Competitors and the difference with the List of competitors and the value proposition of their competing proposed proposition products/services. Differentiation of the expected products/services from competing products/services c. Value chain available and connected? Description of all steps that need to be covered to make the new product / service available and who performs them d. Industrial partners committed? (project Major parts of the value chain are covered by partners to the consortium. consortium) These partners contribute adequate own resources and receive adequate KIC funding. Prefered form of the deliverable: Signed commitment from industrial partners (Project Agreement or LoI) 4. Freedom to operate: a. Intellectual Property: own IP Agreement which lists identified Background in the consortium and makes it available to the consortium and partners in the value chain. b. Intellectual Property: hostile External IP identified and analyzed with the result that development and production of the new products / services is not restricted by external IP c. Intellectual property: foreground and licensing List of areas where new IP is expected, and to whom this new IP shall be licensed 5. Detailed project plan/WBS a. What, when, who, where to reach the goal. Sound project plan b. What are the deliverables in scheme Milestones and output-oriented deliverables defined c. Risk’s and mitigation Risk analysis and mitigation plan available: Risks identified and sound mitigation actions established? Copyright © 2013 KIC InnoEnergy 13