Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Resource Mobilisation for Urban Infrastructure

157 views

Published on

  • Be the first to comment

  • Be the first to like this

Resource Mobilisation for Urban Infrastructure

  1. 1. Regional Centre for Urban & Environmental Studies, Lucknow Municipal Resource Mobilisation for Urban Infrastructure including PPP Madhusudan Sharma
  2. 2. • Legal Framework • Resources required for Urban Infrastructure • Resource Mobilisation Issues • Conventional Sources of Revenue • Non-Conventional Resources Pooled Finance and Bonds Land Value Capture Finance PPP Cost management
  3. 3. Legal Framework • The Constitution of India • State Municipal Act and Rules • State PPP Act • ULB Rules • Central Finance Commission • State Finance Commission • GoI Guidelines for Pooled Finance • GoI Guidelines for PPP • State Policy for PPP
  4. 4. The Constitution of India Article 243W – 12th Schedule – 18 Functions assigned to Municipalities Article 243X • Taxes, duties, tolls and fees as authorised by the State • Assigned taxes, duties, tolls and fees levied and collected by the State • Grants-in-aid from the Consolidated Fund of the State Article 243Y State Finance Commission to recommend for Municipalities:- • Taxes duties, tolls and fees which may be assigned • Allocation of the taxes, duties, tolls and fees leviable by the State • Grants-in-aid from the Consolidated Fund of the State • Measures needed to improve the financial position Article 243Z • State to make provisions with respect to the maintenance of accounts and audit.
  5. 5. Punjab Municipal Corporation Act for Chandigarh Section 90 (1) - Taxes by Municipal Corporation on: • Land and buildings (including Water, Fire and General Tax) • Advertisement other than in Newspapers • Buildings along with application for sanction of Building plan • Development tax on increase in urban land value caused by execution of any development or improvement Section 90 (2) - Taxes after prior approval of Govt: • Profession, trade, callings and employment • Any other Tax which the State has power to levy Section 90 (6) - Assigned Revenue • Stamp Duty • Motor Vehicle Tax • Electricity Duty • Entertainment Duty and Tax
  6. 6. Resources required for Urban Infrastructure Urban Infrastructure – Water supply, Sewer, SWM, Drainage, Transport, Parks Funds required for: • Initial Capital Cost • Replacements during project life • Operations and Maintenance • Debt service • Asset Replacement
  7. 7. Conventional Sources of ULB Revenue Own • Taxes-Property, Advertisement etc. • License Fee • User Charges-Water, Sewer, SWM • Rent from properties • Sales • Income from Investments Others • Assigned Revenue • Grants
  8. 8. Non-Conventional Resources • Pooled Finance and Bonds • Public Private Partnership (PPP) • Value Capture Finance (VCF) • Citizen Participation • Cost Recovery of services • Cost Management
  9. 9. Value Capture Finance (VCF) • Land value tax • Land use conversion tax • Land value increment tax • Development permission charge – value/area based • Betterment charges / Impact Fee • Transfer of Development Rights (TDR) • Sale / Incentive FSI • Tax Increment Financing (TIF)
  10. 10. Public-Private Partnership (PPP) What is PPP? • Long term contract • Between Govt. or Govt. Agency and Private party • For a Public service Why PPP? • Service coverage and quality-Unmet Need • Reasonable cost-Revenue opportunity • Shared risks and returns
  11. 11. Private Sector Contribution Options • Finance • Service Delivery • Technology Efficiency • Risk management • Cost optimization • Revenue Collection
  12. 12. Public Sector Gains • Coverage • Improved service delivery • Cost savings • Transfer of construction and operations risks Obligations • Policy clarity • Political Will • Social Equity and empowerment of consumers
  13. 13. PPP Models for Municipal Infra Water supply • Build-operate-transfer (BOT) - Concession agreement • Performance-Based Management Contract for O & M • Service management contract: Metering, Billing and Collection Solid Waste Management • Single Concession for collection, transportation, segregation, treatment and disposal. • Separate concessions for: 1 Collection and transportation 2. Segregation, Treatment and disposal Sewerage • Construction of the sewerage network through EPC on a BOQ basis • Construction and operation of STP through a hybrid annuity model based on BOT by the same private operator. Septage • Single Concession for collection, transportation, treatment and disposal. • Separate concessions for: 1 Collection and transportation 2 Treatment and disposal
  14. 14. PPP Alerts Project Development • Clarity of purpose • Realistic assessment of feasibility • Value for money analysis • Balanced risk sharing • Measurable Service standards • Performance linked payment • Approvals and clearances • Documentation-Standard Transparency in selection Monitoring and Regulation
  15. 15. Cost Management • Works • Establishment • Administration • Operation and Management • Programmes • Interest
  16. 16. Resource Mobilisation Issues • Taxing powers • Coverage • Collection • Rate revision • Partial Capital cost funding with grants • Debt service obligation • Additional O & M cost • Infrastructure cost and revenue mismatch • Quality of Assets - life and maintenance costs • Gaps in Recording and Monitoring System
  17. 17. Thanks

×