PRACTICAL TRANING SEMINAR
ON
PLCC
PURSUED
AT
JVVNL
2015-2016
GUIDED BY: SUBMITTED BY:
Mr. Rahul Gupta Madhusudhan Agarwal
(Asst. Prof., ECE Dept.) (PIET/EC/12/065)
Department of Electronics and Communication Engineering
Poornima Institute of Engineering and Technology,
Jaipur
04-09-2015PLCC 1
Table of Contents
• Introduction
• Definition
• History
• Types of Equipments
• Working
• Applications
• Pros and Cons
• Limitations
• Future Scope
• References
• Conclusion
04-09-2015PLCC 2
04-09-2015PLCC 3
POWER LINE CARRIER
COMMUNICATION
If you Observe
Home, Along side road, Internet Lan, Telephone
line, Power lines, High Tension lines , At Power
Stations, and many more.
04-09-2015PLCC 4
Definition
04-09-2015PLCC 5
Fig 1.a
04-09-2015PLCC 6
Home
Meter
Transmission
LineData
signal
Parameter
1.Voltage
2.Current
3.Power
4.Frequency
RTU
(ADC)
Analog
signal Display
unit
Is
Normal
50Hz
Okay
yes
Inform GSS
Control
No
Frequency
Modulation
WORKING PRINCIPLE
Fig 1.1
History
• The first significant step in the field was when two
patents were issued to American Telephone and
Telegraph Company in the name of 'Carrier
Transmission over Power Circuits' in 1920.
• in 1924 two other patents were filed for the systems
transmitting and receiving communication signals
over three phase power lines.
.
04-09-2015PLCC 7
1. Rajasthan State Electricity Board started working from 1st june 1957
2. On 19th July 2000 Government of Rajasthan divided RESB in five part so
that board will run efficiently
1. Rajasthan Rajya Vidyut Utpadan Nigam Ltd.(RVUN), the generation Company.
2. Rajasthan Rajya Vidyut Prasaran Nigam Ltd.,(RVPN), the transmission
Company.
3. Jaipur Vidyut Vitran Nigam Ltd.,(JVVNL) , a regional distribution company.
4. Ajmer Vidyut Vitran Nigam Ltd.(AVVNL) a regional distribution company.
5. Jodhpur Vidyut Vitran Nigam Ltd.(JdVVNL) a regional distribution company
Contact Details
Vidyut Bhawan, Jaipur, Rajasthan
E-mail : info@rajenergy.com
Website: http://www.rajenergy.com/rseb.htm 04-09-2015PLCC 8
9
JAIPUR VIDYUT VITRAN NIGAM LIMITED (Jaipur Discom) is engaged in distribution
and supply of electricity in 12 districts of Rajasthan, namely Jaipur, Dausa, Alwar,
Bharatpur, Dholpur, Kota, Bundi, Baran, Jhalawar, Sawaimadhopur, Tonk and
Karauli.
04-09-2015PLCC
10
04-09-2015PLCC
Equipments Of PLCC
Indoor Equipment`s:- Indoor Equipments consists of a
batteries bank of battery charger of required ratings
and carrier sets. Battery used in the system has
48V/DC.
Outdoor Equipment`s:- Equipments which are outside
the control room, in yard are called outdoor
equipments.
04-09-2015PLCC 11
EQUIPMENTS
• OUTDOOR EQUIPMENT
1. Line Trap
2. Line Matching Unit
3. Balancing Transformer
4. High Frequency Cable
5. Capacitor Voltage Transformer
• INDOOR EQUIPMENT
1. Carrier Terminal
2. Lighting Arrester
3. Battery Charger
4. EPAX
5. PLCC Cabinet
04-09-2015PLCC 12
OUTDOOR EQUIPMENTS
LINE TRAP
1. It is also called "Wave trap".
2. It is connected in series with the power
(transmission) line.
3. It blocks the high frequency carrier waves
04-09-2015PLCC 13
Specification
1.Operating voltage 145KV RMS
2.Operating Current 31KA
3.Type of tuning Board Band
4.Material use Non-Magnetic
5.Capacitance 13200pF
04-09-2015PLCC 14
OUTDOOR EQUIPMENTS
BALANCING TRANSFORMER
1. Balancing transformer (BT) is used when phase to phase
communication system is used for balancing the two LMU
2. The diagram of balancing transformer is shown in figure 3.1. As
shown in diagram is very less in size but it is play a vital role in
power line carrier communication.
Fig 3.1: Balancing Transformer (BT)
04-09-2015PLCC 15
OUTDOOR EQUIPMENTS
1. HIGH FREQUENCY CABLE (HFC):It is used to carry the signal from
PLCC cabinet to switch yard
2. LINE MATCHING UNIT: Tuning Device is the combination of R-L-C
circuits which act as filter circuit. LMU is also known as Coupling
Device. Together with coupling capacitor, LMU serves the
purpose of connecting effectively the Audio/Radio frequency
signals to either transmission line or PLC terminal and protection
of the PLCC unit from the over voltages
3. CAPACITOR VOLTAGE TRANSFORMER: It allows to pass the
frequency to line. It provides low impedance path for carrier
energy to HV line and blocks the power frequency. Circuit by
being a high impedance path easily
04-09-2015PLCC 16
Specification(LMU)
1.Operating voltage 25.5-70.7V
2.Maximum watt 16W
3.Impendence 8 ohm
4.Frequency 50-15khz
04-09-2015PLCC 17
Specification(CVT)
1.Operating voltage 145KV
2.Voltage Factor 1.5
3.Temperature 55 degree C
4.Frequency 50hz
04-09-2015PLCC 18
INDOOR EQUIPMENTS
PLCC CABINET
1. It is installed in control room.
2. It has two sections:
3.Transmitter: In this, voice frequency (VF) is
amplified and then modulated to intermediate frequency
(IF) and amplified, modulated into HF and then
transmitted.
4. Receiver: In this section HF signal is received and
then demodulated from HF to IF and connected to the
tale phone.
04-09-2015PLCC 19
Fig-1(a)
PLCC Cabinet
INDOOR EQUIPMENTS
LIGTHING ARRESTER
1. The ground wires running over the towers
provides an adequate protection against lighting
called L.A.
2. It reduced the induced electrostatic or
electromagnetic voltage.
A good light arrester must pass the following
properties:
1. It should not absorb any current during normal
operation.
2. After the over voltage discharge, it must be
capable of interrupting the normal frequency of
current 04-09-2015PLCC 20
Fig-2
INDOOR EQUIPMENTS
1.BATTERY CHARGER: It is used for 48 volts DC supply
2.CARRIER TREMINAL: The 9505 PLC terminals are
intended for transmission of speech, telemetering,
teleidication and tele protection in the signal carrier
frequency
3.EPAX: It consist of PLCC carrier equipment and
related electromechanically switching equipment`s
like EPAX to provide voice communication
04-09-2015PLCC 21
Fig-3
Specification(LA)
1.Voltage 12-42KV
2.Current 500A
3.Temperature 50 degree C
4.Frequency 50hz
04-09-2015PLCC 22
Specification(PLCC)
1.Voltage 132KV
2.Current 1250A
3.Radio Interference voltage <500uV
4.Impendence 570ohm
04-09-2015PLCC 23
BATTERY CHARGER
1. PLCC (Power Line Carrier Communication) works on rectified AC or main
power supply.
2. When supply goes off, we use BATTERY CHARGER for proper functioning
of PLCC.
3. It provides supply to the PLCC equipment for uninterrupted working.
4. It provides DC to the panel by battery of 48V. In this type 24 batteries are
connected in series and individually per battery has approximately 2V
capacity.
04-09-2015PLCC 24
ADVANTAGES2
1. The cost is less because no separate wires are needed
for communication purposes
2. Power lines have appreciably higher mechanical
strength compared with ordinary lines.
3. Power lines usually provide the shortest route between
the power stations.
4. Carrier signals suffer much less attenuation because
power lines have large cross-sectional area 04-09-2015PLCC 25
DISADVANTAGES
1. Proper care has to be taken to guard carrier equipment.
2. High voltages and currents
3. Due to Reflections attenuation increases and creates
problem.
4. Noise introduced by power lines is far more than in case of
telephone lines.
04-09-2015PLCC 26
Application
1.Prevent losses
2.Transmission & Distribution Network
3.Home control and Automation
4.Security Systems
04-09-2015PLCC 27
Limitations
 Electro-Magnetic Radiation Issues
 Noise interference
Security
Addressing issue
04-09-2015PLCC 28
Future Scope
1. Industrial Automation
2. System Protection
3. OPGW
04-09-2015PLCC 29
Conclusion
1. For communication purpose between the power systems, PLCC plays a vital
role
2.For better reliability between interconnected systems PLCC is must
3.I have gained a wonderful experience and practical knowledge in this
training period
4.I also learnt the importance of PLCC in power system
5. Without PLCC a large power system cannot be assumed
6.I am also thankful to those who had been helpful during my training period
04-09-2015PLCC 30
References
1. http://ieeexplore.ieee.org/xpl/articleDetails.jsp?reload=true&arnumb
er=6201240
2. http://www.hindawi.com/journals/jece/2013/712376/
3. http://web.archive.org/web/20090214043341/http://www.rempli.org/
4. http://www.isplc.org/docsearch/Proceedings/1997/pdf/0563_001.pdf
5. yamar.com/home/dcbus-ics
6. http://www.crcnetbase.com/doi/pdfplus/10.1201/b16540-15
7. http://web.archive.org/web/20090520004013/http://www.powerq.co
m.my/telecommunication/distribution-line-carrier-system
9. https://www.iiit.kit.edu/english/2161.php
10.http://www.ijsrp.org/research-paper-0714/ijsrp-p3152.pdf
11.http://research.ijcaonline.org/comnet/number1/comnet1001.pdf
12.http://as.wiley.com/WileyCDA/WileyTitle/productCd-0470740302.html
04-09-2015PLCC 31
13.http://web.archive.org/web/20090520004013/http://www.powerq.com.my/t
elecommunication/distribution-line-carrier-system
14.https://www.linkedin.com/pulse/20140910024219-302442873-power-line-
carrier-communication-plcc
15.http://www.quora.com/What-is-the-use-of-a-wave-trap-coupling-capacitor-
and-line-matching-unit-in-power-line-carrier-communication-PLCC
16.http://www.finetopix.com/showthread.php?19780-Ebook-Power-Line-
Communications
17.http://cdn.intechopen.com/pdfs-wm/5558.pdf
18.http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.453.176&rep=rep1
&type=pdf
19.http://www.isplc.org/docsearch/Proceedings/1999/pdf/0566_001.pdf
20.IEEE Guide for Power-Line Carrier Applications. An American National
Standard.ANSI/IEEE std 643-1980. IEEE, 1980.
04-09-2015PLCC 32
Any Doubts
04-09-2015PLCC 33
Thank You
04-09-2015PLCC 34

More Related Content

What's hot

Power line carrier communication,ETL41/42
Power line carrier communication,ETL41/42Power line carrier communication,ETL41/42
Power line carrier communication,ETL41/42Sreenivas Gundu
 
Power Line Carrier Communication seminar
Power Line Carrier Communication seminarPower Line Carrier Communication seminar
Power Line Carrier Communication seminarAishwary Verma
 
Plcc presentation
Plcc presentationPlcc presentation
Plcc presentationMAHESH SONI
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier CommunicationNeha Gethe
 
Substation and It's Equipment
Substation and It's Equipment Substation and It's Equipment
Substation and It's Equipment Chandan Kumar
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relaysPremanandDesai
 
ECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent ProtectionECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent ProtectionChandrabhan Sharma
 
Inplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationInplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationshivashankar307
 
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptxMuhd Hafizi Idris
 
OPGW Optical Ground Wire
OPGW Optical Ground WireOPGW Optical Ground Wire
OPGW Optical Ground WireSourabh sharma
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protectionRishi Tandon
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a SubstationMd. Atiqur Rahman
 
Transmission lines of Electrical powe
Transmission lines of Electrical poweTransmission lines of Electrical powe
Transmission lines of Electrical poweDarya khan
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relaykishore kish
 

What's hot (20)

Power line carrier communication,ETL41/42
Power line carrier communication,ETL41/42Power line carrier communication,ETL41/42
Power line carrier communication,ETL41/42
 
Power Line Carrier Communication PLCC
Power Line Carrier Communication PLCCPower Line Carrier Communication PLCC
Power Line Carrier Communication PLCC
 
Power Line Carrier Communication seminar
Power Line Carrier Communication seminarPower Line Carrier Communication seminar
Power Line Carrier Communication seminar
 
Plcc presentation
Plcc presentationPlcc presentation
Plcc presentation
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
 
132 kv
132 kv132 kv
132 kv
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Substation and It's Equipment
Substation and It's Equipment Substation and It's Equipment
Substation and It's Equipment
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
ECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent ProtectionECNG 3015 - Overcurrent Protection
ECNG 3015 - Overcurrent Protection
 
Inplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substationInplant training about 110kv/11kv substation
Inplant training about 110kv/11kv substation
 
Report on PLCC
Report on PLCCReport on PLCC
Report on PLCC
 
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
3. INTRODUCTION TO PROTECTIVE RELAYING.pptx
 
OPGW Optical Ground Wire
OPGW Optical Ground WireOPGW Optical Ground Wire
OPGW Optical Ground Wire
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
Transmission lines of Electrical powe
Transmission lines of Electrical poweTransmission lines of Electrical powe
Transmission lines of Electrical powe
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Ppt
PptPpt
Ppt
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relay
 

Viewers also liked (14)

powerline communication system
powerline communication systempowerline communication system
powerline communication system
 
Power Line Communication
Power Line CommunicationPower Line Communication
Power Line Communication
 
Mining robot
Mining robotMining robot
Mining robot
 
Career consling
Career conslingCareer consling
Career consling
 
Li fi
Li fiLi fi
Li fi
 
Eskom load shedding update
Eskom load shedding updateEskom load shedding update
Eskom load shedding update
 
Manufacturing of an insulator through embedded scada using power line carrier...
Manufacturing of an insulator through embedded scada using power line carrier...Manufacturing of an insulator through embedded scada using power line carrier...
Manufacturing of an insulator through embedded scada using power line carrier...
 
Report bsnl training at patna
Report bsnl training at patnaReport bsnl training at patna
Report bsnl training at patna
 
Prevision octobre 04 2016
Prevision octobre 04 2016Prevision octobre 04 2016
Prevision octobre 04 2016
 
Smart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line CommunicationsSmart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line Communications
 
POWER LINE COMMUNICATION
POWER LINE COMMUNICATIONPOWER LINE COMMUNICATION
POWER LINE COMMUNICATION
 
Powerlinecommunicatin ppt
Powerlinecommunicatin pptPowerlinecommunicatin ppt
Powerlinecommunicatin ppt
 
Summer training from BSNL
Summer training from BSNLSummer training from BSNL
Summer training from BSNL
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 

Similar to Power Line carrier communication

Presentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarPresentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarRamanand Sagar
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationDushyant Singh Chouhan
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
Single Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space ApplicationSingle Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space ApplicationIRJET Journal
 
Digital phase selector
Digital phase selectorDigital phase selector
Digital phase selectorSashank G
 
Power_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxPower_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxVara Prasad
 
Honeywell_Trainee_Project_Report
Honeywell_Trainee_Project_ReportHoneywell_Trainee_Project_Report
Honeywell_Trainee_Project_ReportAnandhavel Nagendra
 
Power_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptxPower_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptxNashiIhsan
 
Basic Electronic UNIT-IV PPT
Basic Electronic UNIT-IV PPTBasic Electronic UNIT-IV PPT
Basic Electronic UNIT-IV PPTPraveen Kunda
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportAneel-k Suthar
 
IRJET- Online Grid Integrated Photovoltaic System with New Level Inverter System
IRJET- Online Grid Integrated Photovoltaic System with New Level Inverter SystemIRJET- Online Grid Integrated Photovoltaic System with New Level Inverter System
IRJET- Online Grid Integrated Photovoltaic System with New Level Inverter SystemIRJET Journal
 
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...IRJET Journal
 
NMRC Summer Tanning/Internship PPT(Anand Mohan )
NMRC Summer Tanning/Internship PPT(Anand Mohan )NMRC Summer Tanning/Internship PPT(Anand Mohan )
NMRC Summer Tanning/Internship PPT(Anand Mohan )AnandMohan271812
 
project presentation on "THMC"
project presentation on "THMC"project presentation on "THMC"
project presentation on "THMC"Teja venkat
 
Photovoltaic Management System in Residential Areas Using Power Line Communic...
Photovoltaic Management System in Residential Areas Using Power Line Communic...Photovoltaic Management System in Residential Areas Using Power Line Communic...
Photovoltaic Management System in Residential Areas Using Power Line Communic...IJTET Journal
 

Similar to Power Line carrier communication (20)

Presentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarPresentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagar
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
Single Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space ApplicationSingle Output 40W DC-DC Forward Converter for Space Application
Single Output 40W DC-DC Forward Converter for Space Application
 
Digital phase selector
Digital phase selectorDigital phase selector
Digital phase selector
 
An Overview of PLC
An Overview of PLCAn Overview of PLC
An Overview of PLC
 
Power_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxPower_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptx
 
Honeywell_Trainee_Project_Report
Honeywell_Trainee_Project_ReportHoneywell_Trainee_Project_Report
Honeywell_Trainee_Project_Report
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
Power_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptxPower_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptx
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Basic Electronic UNIT-IV PPT
Basic Electronic UNIT-IV PPTBasic Electronic UNIT-IV PPT
Basic Electronic UNIT-IV PPT
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
IRJET- Online Grid Integrated Photovoltaic System with New Level Inverter System
IRJET- Online Grid Integrated Photovoltaic System with New Level Inverter SystemIRJET- Online Grid Integrated Photovoltaic System with New Level Inverter System
IRJET- Online Grid Integrated Photovoltaic System with New Level Inverter System
 
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
 
NMRC Summer Tanning/Internship PPT(Anand Mohan )
NMRC Summer Tanning/Internship PPT(Anand Mohan )NMRC Summer Tanning/Internship PPT(Anand Mohan )
NMRC Summer Tanning/Internship PPT(Anand Mohan )
 
project presentation on "THMC"
project presentation on "THMC"project presentation on "THMC"
project presentation on "THMC"
 
Photovoltaic Management System in Residential Areas Using Power Line Communic...
Photovoltaic Management System in Residential Areas Using Power Line Communic...Photovoltaic Management System in Residential Areas Using Power Line Communic...
Photovoltaic Management System in Residential Areas Using Power Line Communic...
 

More from Poornima institute of engineering and technology (9)

Ethics
EthicsEthics
Ethics
 
Calibration
CalibrationCalibration
Calibration
 
DMRC
DMRCDMRC
DMRC
 
Vlsi
VlsiVlsi
Vlsi
 
Teleportation
TeleportationTeleportation
Teleportation
 
Tera ray
Tera ray Tera ray
Tera ray
 
Difference between led & lcd
Difference between led & lcdDifference between led & lcd
Difference between led & lcd
 
Analog to digital converter
Analog to digital converterAnalog to digital converter
Analog to digital converter
 
Analog to digital converter
Analog to digital converterAnalog to digital converter
Analog to digital converter
 

Recently uploaded

Conventional vs Modern method (Philosophies) of Tunneling-re.pptx
Conventional vs Modern method (Philosophies) of Tunneling-re.pptxConventional vs Modern method (Philosophies) of Tunneling-re.pptx
Conventional vs Modern method (Philosophies) of Tunneling-re.pptxSAQIB KHURSHEED WANI
 
PhD summary of Luuk Brederode, presented at 2023-10-17 to Veitch Lister Consu...
PhD summary of Luuk Brederode, presented at 2023-10-17 to Veitch Lister Consu...PhD summary of Luuk Brederode, presented at 2023-10-17 to Veitch Lister Consu...
PhD summary of Luuk Brederode, presented at 2023-10-17 to Veitch Lister Consu...Luuk Brederode
 
Chapter 2 Canal Falls at Mnnit Allahabad .pptx
Chapter 2 Canal Falls at Mnnit Allahabad .pptxChapter 2 Canal Falls at Mnnit Allahabad .pptx
Chapter 2 Canal Falls at Mnnit Allahabad .pptxButcher771
 
12. Stairs by U Nyi Hla ngae from Myanmar.pdf
12. Stairs by U Nyi Hla ngae from Myanmar.pdf12. Stairs by U Nyi Hla ngae from Myanmar.pdf
12. Stairs by U Nyi Hla ngae from Myanmar.pdftpo482247
 
Flutter GDE session GDSC ZHCET AMU, aligarh
Flutter GDE session GDSC ZHCET AMU, aligarhFlutter GDE session GDSC ZHCET AMU, aligarh
Flutter GDE session GDSC ZHCET AMU, aligarhjamesbond00714
 
Tekom Netherlands | The evolving landscape of Simplified Technical English b...
Tekom Netherlands | The evolving landscape of Simplified Technical English  b...Tekom Netherlands | The evolving landscape of Simplified Technical English  b...
Tekom Netherlands | The evolving landscape of Simplified Technical English b...Shumin Chen
 
Research paper publications: Meaning of Q1 Q2 Q3 Q4 Journal
Research paper publications: Meaning of Q1 Q2 Q3 Q4 JournalResearch paper publications: Meaning of Q1 Q2 Q3 Q4 Journal
Research paper publications: Meaning of Q1 Q2 Q3 Q4 JournalDr. Manjunatha. P
 
عناصر نباتية PDF.pdfbotanical elements..
عناصر نباتية PDF.pdfbotanical elements..عناصر نباتية PDF.pdfbotanical elements..
عناصر نباتية PDF.pdfbotanical elements..mennamohamed200y
 
Introduction to Machine Learning Unit-2 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-2 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-2 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-2 Notes for II-II Mechanical EngineeringC Sai Kiran
 
The Art of Cloud Native Defense on Kubernetes
The Art of Cloud Native Defense on KubernetesThe Art of Cloud Native Defense on Kubernetes
The Art of Cloud Native Defense on KubernetesJacopo Nardiello
 
Navigating Process Safety through Automation and Digitalization in the Oil an...
Navigating Process Safety through Automation and Digitalization in the Oil an...Navigating Process Safety through Automation and Digitalization in the Oil an...
Navigating Process Safety through Automation and Digitalization in the Oil an...soginsider
 
Searching and Sorting Algorithms
Searching and Sorting AlgorithmsSearching and Sorting Algorithms
Searching and Sorting AlgorithmsAshutosh Satapathy
 
Injection Power Cycle - The most efficient power cycle
Injection Power Cycle - The most efficient power cycleInjection Power Cycle - The most efficient power cycle
Injection Power Cycle - The most efficient power cyclemarijomiljkovic1
 
Evaluation Methods for Social XR Experiences
Evaluation Methods for Social XR ExperiencesEvaluation Methods for Social XR Experiences
Evaluation Methods for Social XR ExperiencesMark Billinghurst
 
EJECTOR REFRIGERATION CYCLE WITH THE INJECTION OF A HIGH DENSITY FLUID INTO A...
EJECTOR REFRIGERATION CYCLE WITH THE INJECTION OF A HIGH DENSITY FLUID INTO A...EJECTOR REFRIGERATION CYCLE WITH THE INJECTION OF A HIGH DENSITY FLUID INTO A...
EJECTOR REFRIGERATION CYCLE WITH THE INJECTION OF A HIGH DENSITY FLUID INTO A...marijomiljkovic1
 
A brief about Jeypore Sub-station Presentation
A brief about Jeypore Sub-station PresentationA brief about Jeypore Sub-station Presentation
A brief about Jeypore Sub-station PresentationJeyporess2021
 
presentation by faizan[1] [Read-Only].pptx
presentation by faizan[1] [Read-Only].pptxpresentation by faizan[1] [Read-Only].pptx
presentation by faizan[1] [Read-Only].pptxkhfaizan534
 
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024California Asphalt Pavement Association
 
NIPORT Home Economics Questions Solution 2024.pdf
NIPORT Home Economics Questions Solution 2024.pdfNIPORT Home Economics Questions Solution 2024.pdf
NIPORT Home Economics Questions Solution 2024.pdfMohonDas
 

Recently uploaded (20)

Conventional vs Modern method (Philosophies) of Tunneling-re.pptx
Conventional vs Modern method (Philosophies) of Tunneling-re.pptxConventional vs Modern method (Philosophies) of Tunneling-re.pptx
Conventional vs Modern method (Philosophies) of Tunneling-re.pptx
 
PhD summary of Luuk Brederode, presented at 2023-10-17 to Veitch Lister Consu...
PhD summary of Luuk Brederode, presented at 2023-10-17 to Veitch Lister Consu...PhD summary of Luuk Brederode, presented at 2023-10-17 to Veitch Lister Consu...
PhD summary of Luuk Brederode, presented at 2023-10-17 to Veitch Lister Consu...
 
Chapter 2 Canal Falls at Mnnit Allahabad .pptx
Chapter 2 Canal Falls at Mnnit Allahabad .pptxChapter 2 Canal Falls at Mnnit Allahabad .pptx
Chapter 2 Canal Falls at Mnnit Allahabad .pptx
 
12. Stairs by U Nyi Hla ngae from Myanmar.pdf
12. Stairs by U Nyi Hla ngae from Myanmar.pdf12. Stairs by U Nyi Hla ngae from Myanmar.pdf
12. Stairs by U Nyi Hla ngae from Myanmar.pdf
 
Flutter GDE session GDSC ZHCET AMU, aligarh
Flutter GDE session GDSC ZHCET AMU, aligarhFlutter GDE session GDSC ZHCET AMU, aligarh
Flutter GDE session GDSC ZHCET AMU, aligarh
 
Tekom Netherlands | The evolving landscape of Simplified Technical English b...
Tekom Netherlands | The evolving landscape of Simplified Technical English  b...Tekom Netherlands | The evolving landscape of Simplified Technical English  b...
Tekom Netherlands | The evolving landscape of Simplified Technical English b...
 
Research paper publications: Meaning of Q1 Q2 Q3 Q4 Journal
Research paper publications: Meaning of Q1 Q2 Q3 Q4 JournalResearch paper publications: Meaning of Q1 Q2 Q3 Q4 Journal
Research paper publications: Meaning of Q1 Q2 Q3 Q4 Journal
 
Industry perspective on cold in-place recycling
Industry perspective on cold in-place recyclingIndustry perspective on cold in-place recycling
Industry perspective on cold in-place recycling
 
عناصر نباتية PDF.pdfbotanical elements..
عناصر نباتية PDF.pdfbotanical elements..عناصر نباتية PDF.pdfbotanical elements..
عناصر نباتية PDF.pdfbotanical elements..
 
Introduction to Machine Learning Unit-2 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-2 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-2 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-2 Notes for II-II Mechanical Engineering
 
The Art of Cloud Native Defense on Kubernetes
The Art of Cloud Native Defense on KubernetesThe Art of Cloud Native Defense on Kubernetes
The Art of Cloud Native Defense on Kubernetes
 
Navigating Process Safety through Automation and Digitalization in the Oil an...
Navigating Process Safety through Automation and Digitalization in the Oil an...Navigating Process Safety through Automation and Digitalization in the Oil an...
Navigating Process Safety through Automation and Digitalization in the Oil an...
 
Searching and Sorting Algorithms
Searching and Sorting AlgorithmsSearching and Sorting Algorithms
Searching and Sorting Algorithms
 
Injection Power Cycle - The most efficient power cycle
Injection Power Cycle - The most efficient power cycleInjection Power Cycle - The most efficient power cycle
Injection Power Cycle - The most efficient power cycle
 
Evaluation Methods for Social XR Experiences
Evaluation Methods for Social XR ExperiencesEvaluation Methods for Social XR Experiences
Evaluation Methods for Social XR Experiences
 
EJECTOR REFRIGERATION CYCLE WITH THE INJECTION OF A HIGH DENSITY FLUID INTO A...
EJECTOR REFRIGERATION CYCLE WITH THE INJECTION OF A HIGH DENSITY FLUID INTO A...EJECTOR REFRIGERATION CYCLE WITH THE INJECTION OF A HIGH DENSITY FLUID INTO A...
EJECTOR REFRIGERATION CYCLE WITH THE INJECTION OF A HIGH DENSITY FLUID INTO A...
 
A brief about Jeypore Sub-station Presentation
A brief about Jeypore Sub-station PresentationA brief about Jeypore Sub-station Presentation
A brief about Jeypore Sub-station Presentation
 
presentation by faizan[1] [Read-Only].pptx
presentation by faizan[1] [Read-Only].pptxpresentation by faizan[1] [Read-Only].pptx
presentation by faizan[1] [Read-Only].pptx
 
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
 
NIPORT Home Economics Questions Solution 2024.pdf
NIPORT Home Economics Questions Solution 2024.pdfNIPORT Home Economics Questions Solution 2024.pdf
NIPORT Home Economics Questions Solution 2024.pdf
 

Power Line carrier communication

Editor's Notes

  1. 1. The term PLCC abbreviates Power Line Carrier Communication since conductors of Power Lines (132 kV, 220 kV, 400 kV and 765 kV Transmission Lines) carry the high frequency communication signal, is used for establishing data communication between two stations using a Power Line
  2. The idea of using an existing medium to send the communication signals is as old as the telegraph itself. But it had not been possible until the recent decades. The first significant step in the field was when two patents were issued to American Telephone and Telegraph Company in the name of 'Carrier Transmission over Power Circuits' in 1920. After four years later in 1924 two other patents were filed for the systems transmitting and receiving communication signals over three phase power lines.   Harsh characteristics of the power cables were the key problem in further development. Researchers were involved to overcome the unpredictable characteristics of the power lines. Since the early 1980, spread spectrum power line communication was the main focus of the research. This technology is now developed far better than that initial improvement and is promising a reliable utilization in home automation and security systems
  3.        WAVE TRAPS Wave traps – (WT’s) are used between the transmission line and the power stations to avoid carrier power dislocation in the power plant and cross talk with other power line carrier circuits connected to the same power station. WT’s also ensure proper operating conditions and signal levels at the PLCC transmit receive equipment irrespective of switching conditions of the power circuits and equipment in the station. A wave trap must satisfy the following requirements:  1)     It must block the carrier currents. By blocking, we mean that the track should attenuate the H.F. signals by at least 8 to 10 dB. 2)  It must carry the power frequency current safely during normal operation as well as during short circuit fault conditions.
  4. Now a days PLCCs are replaced by OPGW. OPGW abbreviates Optical Ground Wire. Optical Ground Wire acts as normal ground wire protecting phase wires from lightning strikes and carries earth fault current. Apart from its application as an earth wire, OPGW also provides an optical path in power line installations for telecommunication & protection needs. OPGW can be installed in the same manner as normal ground wire with conventional resources. OPGW eliminates the Coupling Capacitor & Line Trap thereby reducing the system complexity and enhancing the reliability.