Advertisement
Advertisement

More Related Content

More from METER Group, Inc. USA(20)

Advertisement

How to Interpret Soil Moisture Data - Part 2

  1. 0 0.1 0.2 0.3 0.4 0.5 0.6 2/19/20 2/29/20 3/10/20 3/20/20 3/30/20 4/9/20 4/19/20 4/29/20 VWC (m3/m3) time 5 cm 5 cm - air gap 5 cm - no air gap
  2. 0 0.1 0.2 0.3 0.4 0.5 0.6 2/19/20 2/29/20 3/10/20 3/20/20 3/30/20 4/9/20 4/19/20 4/29/20 VWC (m3/m3) time 10 cm 10 cm - air gap 10 cm - no air gap
  3. 0 0.1 0.2 0.3 0.4 0.5 0.6 2/19/20 2/29/20 3/10/20 3/20/20 3/30/20 4/9/20 4/19/20 4/29/20 VWC (m3/m3) time 20 cm 20 cm - air gap 20 cm - no air gap
  4. Optimal Stressed Wilting
  5. • • • • • •
Advertisement