SlideShare a Scribd company logo
1 of 18
Download to read offline
1
Standards for Mobile Towers
SELECTING A SAFE MOBILE TOWER
LOGO
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
Standards for Mobile Towers
Don Aers
Technical Director
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
About PASMA
The Prefabricated Access Suppliers and Manufacturers Association
 Formed in 1974
 Represents the mobile access tower industry
 Is the recognised training provider and authority for mobile
access towers
 Working with regulatory authorities and standards setting bodies
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
Mobile Access Towers
STANDARD TOWERS
Platform heights
2.5m to 12m indoors
2.5m to 8m outdoors
EN1004
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
Mobile Access Towers
EN1004 Requirements
• Materials
• Critical Dimensions
• Structural Design
• Stability
• Stiffness
• User Instructions (EN1298)
• Marking
• User Instructions
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
EN1004 Mobile Access Tower
 Supplied with guardrails with dimensions to
prevent a fall
 Trapdoor platforms to permit safe access and
prevent falls at 2m intervals
 Supplied with toe boards to prevent the fall of
materials
 Supplied with purpose built access ladders or
stairs inside the tower
 Supplied with correct number of secure
platforms
 Supplied with correct number and size of
stabilisers
 Instructions comply with standard BS EN1298
 Safe method of assembly and dismantling
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
Which bits are you missing?
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
Which bits are you missing?
 NOT EN1004
 H Frame or Domestic steel tower
 Do not have proper platforms
 Do not have built in access
 Not supplied with stabilisers
 Have guardrail dimensions that
would not prevent a fall
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
TOWER CHECKLIST
 Instruction manual available
 Guardrail height and gaps correct
 Toe boards in place
 Platforms secure on horizontals and
wind-locks engaged
 Platform trapdoors over access and
opening towards outside of tower
 End frame interlock clips engaged
 Braces in correct position and hooks
locked on
 Smallest frame at the base of tower
 Stabilisers correctly positioned
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
TOWER CHECKLIST
 Ballast (if used) of correct type,
correctly positioned and secure
 If tied in, ties are adequate
 Tower is vertical and level
 Adjustable legs not over-extended
 Brakes applied, wheels in contact
with ground
 Base plates (if used) in contact with
ground
 Ground conditions are appropriate
 Weather conditions – wind speed
 Inspection record completed
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
BS1139 Part 6 - Access Towers outside the scope of BS EN
1004, but utilizing components from such systems
• LARGE DECK STRUCTURES
• BRIDGING STRUCTURES
• LINKED (FAÇADE)
• CANTILEVER STRUCTURES
• STEPPED STRUCTURES
• HIGH LEVEL STRUCTURES
BS1139-6 Prefabricated Tower Scaffolds
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
BS1139 Part 6 - Access Towers outside the scope of BS EN
1004, but utilizing components from such systems
• LARGE DECK STRUCTURES
• BRIDGING STRUCTURES
• LINKED (FAÇADE)
• CANTILEVER STRUCTURES
• STEPPED STRUCTURES
• HIGH LEVEL STRUCTURES
BS1139-6 Prefabricated Tower Scaffolds
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
BS1139 Part 6 - Access Towers outside the scope of BS EN
1004, but utilizing components from such systems
BS1139-6 Prefabricated Tower Scaffolds
Materials
Critical Dimensions
Structural Design
Stability
User Instructions
Marking
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
SAFE BUILD
3T – Through The Trap
AGR – Advance Guard Rail
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
INSPECTION
1) Recorded pre-use inspections
following assembly of the tower:
 Inspect after assembly, before use
 At least every 7 days it remains in
use
 After any event that may have
caused the tower to be unsafe
2) Routine recorded inspections on the
components of the tower
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
COMPETENCY
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
DISCUSSION & QUESTIONS
Standards for Mobile Towers
© PASMA 2015
COLLECTIVE MARK
®
PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION
DISCUSSION & QUESTIONS

More Related Content

What's hot

Principios operación grúas plumas parte 2
Principios operación grúas plumas parte 2Principios operación grúas plumas parte 2
Principios operación grúas plumas parte 2Crane Care Chile
 
Acesso por-corda-nr-35
Acesso por-corda-nr-35Acesso por-corda-nr-35
Acesso por-corda-nr-35Fatima Silva
 
Rigging math
Rigging mathRigging math
Rigging mathdboevers
 
MOD 6 plano de içamento e mov carga.pdf
MOD 6 plano de içamento e mov carga.pdfMOD 6 plano de içamento e mov carga.pdf
MOD 6 plano de içamento e mov carga.pdfSérgio Alves
 
Curso operador de manipulador telescópico (TELEHANDLER)
Curso operador de manipulador telescópico (TELEHANDLER)Curso operador de manipulador telescópico (TELEHANDLER)
Curso operador de manipulador telescópico (TELEHANDLER)Rigo Sigala
 
Working with and around our equipment1
Working with and around our equipment1Working with and around our equipment1
Working with and around our equipment1Sheena Baker
 
CPCS A17 Telehandler Theory Test Answers
CPCS A17 Telehandler Theory Test AnswersCPCS A17 Telehandler Theory Test Answers
CPCS A17 Telehandler Theory Test Answerscpcsanswers
 
Curso Izaje con Eslingas Sintéticas
Curso Izaje con Eslingas SintéticasCurso Izaje con Eslingas Sintéticas
Curso Izaje con Eslingas SintéticasEslingas Vikingo
 
Ii 14 salvamento_em_elevadores_an (1)
Ii 14 salvamento_em_elevadores_an (1)Ii 14 salvamento_em_elevadores_an (1)
Ii 14 salvamento_em_elevadores_an (1)Edcarlos Silva
 
Mobile crane inspector training student manual
Mobile crane inspector training   student manualMobile crane inspector training   student manual
Mobile crane inspector training student manualSaul Ramirez
 
Plano de rigging para a movimentação segura das cargas instruções gerais
Plano de rigging para a movimentação segura das cargas   instruções geraisPlano de rigging para a movimentação segura das cargas   instruções gerais
Plano de rigging para a movimentação segura das cargas instruções geraisUniversidade Federal Fluminense
 
Confiabilidad y disponibilidad calculados para el sistema de compresión
Confiabilidad y disponibilidad calculados para el sistema de compresiónConfiabilidad y disponibilidad calculados para el sistema de compresión
Confiabilidad y disponibilidad calculados para el sistema de compresiónFreddy Roa
 
Treinamento-Trabalho-em-Altura-NR-35_9b4ed94bd1f24d32ab128e782cc38eca.ppt
Treinamento-Trabalho-em-Altura-NR-35_9b4ed94bd1f24d32ab128e782cc38eca.pptTreinamento-Trabalho-em-Altura-NR-35_9b4ed94bd1f24d32ab128e782cc38eca.ppt
Treinamento-Trabalho-em-Altura-NR-35_9b4ed94bd1f24d32ab128e782cc38eca.pptVilsonBernardoStollm
 

What's hot (20)

Principios operación grúas plumas parte 2
Principios operación grúas plumas parte 2Principios operación grúas plumas parte 2
Principios operación grúas plumas parte 2
 
Acesso por-corda-nr-35
Acesso por-corda-nr-35Acesso por-corda-nr-35
Acesso por-corda-nr-35
 
Rigging math
Rigging mathRigging math
Rigging math
 
Montagem de andaimes
Montagem de andaimesMontagem de andaimes
Montagem de andaimes
 
MOD 6 plano de içamento e mov carga.pdf
MOD 6 plano de içamento e mov carga.pdfMOD 6 plano de içamento e mov carga.pdf
MOD 6 plano de içamento e mov carga.pdf
 
Curso operador de manipulador telescópico (TELEHANDLER)
Curso operador de manipulador telescópico (TELEHANDLER)Curso operador de manipulador telescópico (TELEHANDLER)
Curso operador de manipulador telescópico (TELEHANDLER)
 
Working with and around our equipment1
Working with and around our equipment1Working with and around our equipment1
Working with and around our equipment1
 
pa-carregadeira-conceitos-2
pa-carregadeira-conceitos-2pa-carregadeira-conceitos-2
pa-carregadeira-conceitos-2
 
Scaffolding by UTK
Scaffolding by UTKScaffolding by UTK
Scaffolding by UTK
 
CPCS A17 Telehandler Theory Test Answers
CPCS A17 Telehandler Theory Test AnswersCPCS A17 Telehandler Theory Test Answers
CPCS A17 Telehandler Theory Test Answers
 
Curso Izaje con Eslingas Sintéticas
Curso Izaje con Eslingas SintéticasCurso Izaje con Eslingas Sintéticas
Curso Izaje con Eslingas Sintéticas
 
2014 CRW - Operating Cranes around Power Lines
2014 CRW - Operating Cranes around Power Lines2014 CRW - Operating Cranes around Power Lines
2014 CRW - Operating Cranes around Power Lines
 
Ii 14 salvamento_em_elevadores_an (1)
Ii 14 salvamento_em_elevadores_an (1)Ii 14 salvamento_em_elevadores_an (1)
Ii 14 salvamento_em_elevadores_an (1)
 
Mobile crane inspector training student manual
Mobile crane inspector training   student manualMobile crane inspector training   student manual
Mobile crane inspector training student manual
 
Plano de rigging para a movimentação segura das cargas instruções gerais
Plano de rigging para a movimentação segura das cargas   instruções geraisPlano de rigging para a movimentação segura das cargas   instruções gerais
Plano de rigging para a movimentação segura das cargas instruções gerais
 
O que é Munck?
O que é Munck?O que é Munck?
O que é Munck?
 
Confiabilidad y disponibilidad calculados para el sistema de compresión
Confiabilidad y disponibilidad calculados para el sistema de compresiónConfiabilidad y disponibilidad calculados para el sistema de compresión
Confiabilidad y disponibilidad calculados para el sistema de compresión
 
Treinamento-Trabalho-em-Altura-NR-35_9b4ed94bd1f24d32ab128e782cc38eca.ppt
Treinamento-Trabalho-em-Altura-NR-35_9b4ed94bd1f24d32ab128e782cc38eca.pptTreinamento-Trabalho-em-Altura-NR-35_9b4ed94bd1f24d32ab128e782cc38eca.ppt
Treinamento-Trabalho-em-Altura-NR-35_9b4ed94bd1f24d32ab128e782cc38eca.ppt
 
ROÇADEIRA COSTAL.ppt
ROÇADEIRA COSTAL.pptROÇADEIRA COSTAL.ppt
ROÇADEIRA COSTAL.ppt
 
CURSO GRÚAS RT.1.ppt
CURSO GRÚAS RT.1.pptCURSO GRÚAS RT.1.ppt
CURSO GRÚAS RT.1.ppt
 

Viewers also liked

Thiết kế xây dựng trạm bts phục vụ cho một vùng và kiểm tra hoạt động trạm bt...
Thiết kế xây dựng trạm bts phục vụ cho một vùng và kiểm tra hoạt động trạm bt...Thiết kế xây dựng trạm bts phục vụ cho một vùng và kiểm tra hoạt động trạm bt...
Thiết kế xây dựng trạm bts phục vụ cho một vùng và kiểm tra hoạt động trạm bt...Đinh Công Thiện Taydo University
 
Ill effects of mobile towers
Ill effects of mobile towersIll effects of mobile towers
Ill effects of mobile towersanuroopmadhavan
 
Effects of Mobile Tower Radiation and Cases reported worldwide
Effects of Mobile Tower Radiation and Cases reported worldwideEffects of Mobile Tower Radiation and Cases reported worldwide
Effects of Mobile Tower Radiation and Cases reported worldwideNeha Kumar
 
Mobile Tower Radiations & its effects
Mobile Tower Radiations & its effectsMobile Tower Radiations & its effects
Mobile Tower Radiations & its effectsNishu Vora
 
Mobile tower radiation
Mobile tower radiationMobile tower radiation
Mobile tower radiationNaveen Kumar
 
Mobile tower site, Nimay Giri
Mobile tower site, Nimay GiriMobile tower site, Nimay Giri
Mobile tower site, Nimay Girinimay1
 
[Báo cáo] Bài tập lớn: Thiết kế anten Yagi
[Báo cáo] Bài tập lớn: Thiết kế anten Yagi[Báo cáo] Bài tập lớn: Thiết kế anten Yagi
[Báo cáo] Bài tập lớn: Thiết kế anten YagiThe Nguyen Manh
 
CELLULAR COMMUNICATION SYSTEM
CELLULAR COMMUNICATION SYSTEMCELLULAR COMMUNICATION SYSTEM
CELLULAR COMMUNICATION SYSTEMSuryani Ilias
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towerssnookala
 
MOBILE PHONE & MOBILE TOWER RADIATION HAZARDS
MOBILE PHONE & MOBILE TOWER RADIATION HAZARDS MOBILE PHONE & MOBILE TOWER RADIATION HAZARDS
MOBILE PHONE & MOBILE TOWER RADIATION HAZARDS Neha Kumar
 
Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennasnimay1
 

Viewers also liked (12)

công nghệ wimax
công nghệ wimaxcông nghệ wimax
công nghệ wimax
 
Thiết kế xây dựng trạm bts phục vụ cho một vùng và kiểm tra hoạt động trạm bt...
Thiết kế xây dựng trạm bts phục vụ cho một vùng và kiểm tra hoạt động trạm bt...Thiết kế xây dựng trạm bts phục vụ cho một vùng và kiểm tra hoạt động trạm bt...
Thiết kế xây dựng trạm bts phục vụ cho một vùng và kiểm tra hoạt động trạm bt...
 
Ill effects of mobile towers
Ill effects of mobile towersIll effects of mobile towers
Ill effects of mobile towers
 
Effects of Mobile Tower Radiation and Cases reported worldwide
Effects of Mobile Tower Radiation and Cases reported worldwideEffects of Mobile Tower Radiation and Cases reported worldwide
Effects of Mobile Tower Radiation and Cases reported worldwide
 
Mobile Tower Radiations & its effects
Mobile Tower Radiations & its effectsMobile Tower Radiations & its effects
Mobile Tower Radiations & its effects
 
Mobile tower radiation
Mobile tower radiationMobile tower radiation
Mobile tower radiation
 
Mobile tower site, Nimay Giri
Mobile tower site, Nimay GiriMobile tower site, Nimay Giri
Mobile tower site, Nimay Giri
 
[Báo cáo] Bài tập lớn: Thiết kế anten Yagi
[Báo cáo] Bài tập lớn: Thiết kế anten Yagi[Báo cáo] Bài tập lớn: Thiết kế anten Yagi
[Báo cáo] Bài tập lớn: Thiết kế anten Yagi
 
CELLULAR COMMUNICATION SYSTEM
CELLULAR COMMUNICATION SYSTEMCELLULAR COMMUNICATION SYSTEM
CELLULAR COMMUNICATION SYSTEM
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
MOBILE PHONE & MOBILE TOWER RADIATION HAZARDS
MOBILE PHONE & MOBILE TOWER RADIATION HAZARDS MOBILE PHONE & MOBILE TOWER RADIATION HAZARDS
MOBILE PHONE & MOBILE TOWER RADIATION HAZARDS
 
Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennas
 

Similar to Standards for mobile towers

Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesCommunications Branding
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Agata Woźniak
 
Height Dynamics Corporate Profile 2015
Height Dynamics Corporate Profile 2015Height Dynamics Corporate Profile 2015
Height Dynamics Corporate Profile 2015Guy Pearce
 
Climbforce Profile 2018 Rev2
Climbforce Profile 2018 Rev2 Climbforce Profile 2018 Rev2
Climbforce Profile 2018 Rev2 Climbforce FZC
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarCommunications Branding
 
Werner Ladders & Access Equipment
Werner Ladders & Access EquipmentWerner Ladders & Access Equipment
Werner Ladders & Access EquipmentStuart Harling
 
FNSS - Perimeter security services company
FNSS - Perimeter security services companyFNSS - Perimeter security services company
FNSS - Perimeter security services companyfnssUSA
 
Correct Safety Products and Services
Correct Safety Products and ServicesCorrect Safety Products and Services
Correct Safety Products and ServicesCorrect Safety
 
SCA Group Brief February 2013 - Access (Scaffold and Rope Access), Containmen...
SCA Group Brief February 2013 - Access (Scaffold and Rope Access), Containmen...SCA Group Brief February 2013 - Access (Scaffold and Rope Access), Containmen...
SCA Group Brief February 2013 - Access (Scaffold and Rope Access), Containmen...Claudine Cross
 
Ezy Stack Structural Chamber Solutions
Ezy Stack Structural Chamber SolutionsEzy Stack Structural Chamber Solutions
Ezy Stack Structural Chamber SolutionsDan Bulley
 
Uniline roofsafe-rail-bcr eng
Uniline roofsafe-rail-bcr engUniline roofsafe-rail-bcr eng
Uniline roofsafe-rail-bcr engTRABALHO VERTICAL
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication TowersTowerpeople
 
Abs001 absafe capability statement v3 feb 2019
Abs001 absafe capability statement v3   feb 2019Abs001 absafe capability statement v3   feb 2019
Abs001 absafe capability statement v3 feb 2019Paul Frederick Holland
 
Safety solutions for industries, warehouses and metro
Safety solutions for industries, warehouses and metroSafety solutions for industries, warehouses and metro
Safety solutions for industries, warehouses and metroYoungmanMarketing
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation Agata Woźniak
 

Similar to Standards for mobile towers (20)

Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions
 
Height Dynamics Corporate Profile 2015
Height Dynamics Corporate Profile 2015Height Dynamics Corporate Profile 2015
Height Dynamics Corporate Profile 2015
 
Climbforce Profile 2018 Rev2
Climbforce Profile 2018 Rev2 Climbforce Profile 2018 Rev2
Climbforce Profile 2018 Rev2
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels Webinar
 
Highway
HighwayHighway
Highway
 
Werner Ladders & Access Equipment
Werner Ladders & Access EquipmentWerner Ladders & Access Equipment
Werner Ladders & Access Equipment
 
Steelway Group Brochure 2010
Steelway Group Brochure 2010Steelway Group Brochure 2010
Steelway Group Brochure 2010
 
FNSS - Perimeter security services company
FNSS - Perimeter security services companyFNSS - Perimeter security services company
FNSS - Perimeter security services company
 
XERVON_Palmers
XERVON_PalmersXERVON_Palmers
XERVON_Palmers
 
PFEIFER - Lifting Anchor Systems
PFEIFER - Lifting Anchor SystemsPFEIFER - Lifting Anchor Systems
PFEIFER - Lifting Anchor Systems
 
Correct Safety Products and Services
Correct Safety Products and ServicesCorrect Safety Products and Services
Correct Safety Products and Services
 
SCA Group Brief February 2013 - Access (Scaffold and Rope Access), Containmen...
SCA Group Brief February 2013 - Access (Scaffold and Rope Access), Containmen...SCA Group Brief February 2013 - Access (Scaffold and Rope Access), Containmen...
SCA Group Brief February 2013 - Access (Scaffold and Rope Access), Containmen...
 
Ezy Stack Structural Chamber Solutions
Ezy Stack Structural Chamber SolutionsEzy Stack Structural Chamber Solutions
Ezy Stack Structural Chamber Solutions
 
Uniline roofsafe-rail-bcr eng
Uniline roofsafe-rail-bcr engUniline roofsafe-rail-bcr eng
Uniline roofsafe-rail-bcr eng
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication Towers
 
Abs001 absafe capability statement v3 feb 2019
Abs001 absafe capability statement v3   feb 2019Abs001 absafe capability statement v3   feb 2019
Abs001 absafe capability statement v3 feb 2019
 
ARIES CURRENT PROFILE
ARIES CURRENT PROFILEARIES CURRENT PROFILE
ARIES CURRENT PROFILE
 
Safety solutions for industries, warehouses and metro
Safety solutions for industries, warehouses and metroSafety solutions for industries, warehouses and metro
Safety solutions for industries, warehouses and metro
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation
 

More from MECandPMV

Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...MECandPMV
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryMECandPMV
 
Chemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresChemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresMECandPMV
 
Building materials & pollutants
Building materials & pollutantsBuilding materials & pollutants
Building materials & pollutantsMECandPMV
 
Risk management
Risk managementRisk management
Risk managementMECandPMV
 
Guarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesGuarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesMECandPMV
 
Greening of concrete trends & priorities
Greening of concrete trends & prioritiesGreening of concrete trends & priorities
Greening of concrete trends & prioritiesMECandPMV
 
Emergency procedure at height
Emergency procedure at heightEmergency procedure at height
Emergency procedure at heightMECandPMV
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durabilityMECandPMV
 
Al hail greens residential development
Al hail greens residential developmentAl hail greens residential development
Al hail greens residential developmentMECandPMV
 
Advancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesAdvancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesMECandPMV
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structuresMECandPMV
 
Vehicle tracking & fleet management
Vehicle tracking & fleet managementVehicle tracking & fleet management
Vehicle tracking & fleet managementMECandPMV
 
Tilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsTilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsMECandPMV
 
Working Safely while saving time & cost
Working Safely while saving time & costWorking Safely while saving time & cost
Working Safely while saving time & costMECandPMV
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureMECandPMV
 
Concrete Durability and water resistance
Concrete Durability and water resistanceConcrete Durability and water resistance
Concrete Durability and water resistanceMECandPMV
 
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...MECandPMV
 
Cement based solutions for early return to service
Cement based solutions for early return to serviceCement based solutions for early return to service
Cement based solutions for early return to serviceMECandPMV
 
Assests Increas Cash Flow
Assests Increas Cash FlowAssests Increas Cash Flow
Assests Increas Cash FlowMECandPMV
 

More from MECandPMV (20)

Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Chemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresChemical attack on the durability of underground structures
Chemical attack on the durability of underground structures
 
Building materials & pollutants
Building materials & pollutantsBuilding materials & pollutants
Building materials & pollutants
 
Risk management
Risk managementRisk management
Risk management
 
Guarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesGuarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificates
 
Greening of concrete trends & priorities
Greening of concrete trends & prioritiesGreening of concrete trends & priorities
Greening of concrete trends & priorities
 
Emergency procedure at height
Emergency procedure at heightEmergency procedure at height
Emergency procedure at height
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durability
 
Al hail greens residential development
Al hail greens residential developmentAl hail greens residential development
Al hail greens residential development
 
Advancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesAdvancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniques
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structures
 
Vehicle tracking & fleet management
Vehicle tracking & fleet managementVehicle tracking & fleet management
Vehicle tracking & fleet management
 
Tilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsTilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & Applications
 
Working Safely while saving time & cost
Working Safely while saving time & costWorking Safely while saving time & cost
Working Safely while saving time & cost
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructure
 
Concrete Durability and water resistance
Concrete Durability and water resistanceConcrete Durability and water resistance
Concrete Durability and water resistance
 
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
 
Cement based solutions for early return to service
Cement based solutions for early return to serviceCement based solutions for early return to service
Cement based solutions for early return to service
 
Assests Increas Cash Flow
Assests Increas Cash FlowAssests Increas Cash Flow
Assests Increas Cash Flow
 

Recently uploaded

Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 

Recently uploaded (20)

Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 

Standards for mobile towers

  • 1. 1 Standards for Mobile Towers SELECTING A SAFE MOBILE TOWER LOGO
  • 2. COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION Standards for Mobile Towers Don Aers Technical Director
  • 3. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION About PASMA The Prefabricated Access Suppliers and Manufacturers Association  Formed in 1974  Represents the mobile access tower industry  Is the recognised training provider and authority for mobile access towers  Working with regulatory authorities and standards setting bodies
  • 4. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION Mobile Access Towers STANDARD TOWERS Platform heights 2.5m to 12m indoors 2.5m to 8m outdoors EN1004
  • 5. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION Mobile Access Towers EN1004 Requirements • Materials • Critical Dimensions • Structural Design • Stability • Stiffness • User Instructions (EN1298) • Marking • User Instructions
  • 6. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION EN1004 Mobile Access Tower  Supplied with guardrails with dimensions to prevent a fall  Trapdoor platforms to permit safe access and prevent falls at 2m intervals  Supplied with toe boards to prevent the fall of materials  Supplied with purpose built access ladders or stairs inside the tower  Supplied with correct number of secure platforms  Supplied with correct number and size of stabilisers  Instructions comply with standard BS EN1298  Safe method of assembly and dismantling
  • 7. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION Which bits are you missing?
  • 8. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION Which bits are you missing?  NOT EN1004  H Frame or Domestic steel tower  Do not have proper platforms  Do not have built in access  Not supplied with stabilisers  Have guardrail dimensions that would not prevent a fall
  • 9. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION TOWER CHECKLIST  Instruction manual available  Guardrail height and gaps correct  Toe boards in place  Platforms secure on horizontals and wind-locks engaged  Platform trapdoors over access and opening towards outside of tower  End frame interlock clips engaged  Braces in correct position and hooks locked on  Smallest frame at the base of tower  Stabilisers correctly positioned
  • 10. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION TOWER CHECKLIST  Ballast (if used) of correct type, correctly positioned and secure  If tied in, ties are adequate  Tower is vertical and level  Adjustable legs not over-extended  Brakes applied, wheels in contact with ground  Base plates (if used) in contact with ground  Ground conditions are appropriate  Weather conditions – wind speed  Inspection record completed
  • 11. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION BS1139 Part 6 - Access Towers outside the scope of BS EN 1004, but utilizing components from such systems • LARGE DECK STRUCTURES • BRIDGING STRUCTURES • LINKED (FAÇADE) • CANTILEVER STRUCTURES • STEPPED STRUCTURES • HIGH LEVEL STRUCTURES BS1139-6 Prefabricated Tower Scaffolds
  • 12. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION BS1139 Part 6 - Access Towers outside the scope of BS EN 1004, but utilizing components from such systems • LARGE DECK STRUCTURES • BRIDGING STRUCTURES • LINKED (FAÇADE) • CANTILEVER STRUCTURES • STEPPED STRUCTURES • HIGH LEVEL STRUCTURES BS1139-6 Prefabricated Tower Scaffolds
  • 13. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION BS1139 Part 6 - Access Towers outside the scope of BS EN 1004, but utilizing components from such systems BS1139-6 Prefabricated Tower Scaffolds Materials Critical Dimensions Structural Design Stability User Instructions Marking
  • 14. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION SAFE BUILD 3T – Through The Trap AGR – Advance Guard Rail
  • 15. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION INSPECTION 1) Recorded pre-use inspections following assembly of the tower:  Inspect after assembly, before use  At least every 7 days it remains in use  After any event that may have caused the tower to be unsafe 2) Routine recorded inspections on the components of the tower
  • 16. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION COMPETENCY
  • 17. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION DISCUSSION & QUESTIONS
  • 18. Standards for Mobile Towers © PASMA 2015 COLLECTIVE MARK ® PREFABRICATED ACCESS SUPPLIERS’ AND MANUFACTURERS’ ASSOCIATION DISCUSSION & QUESTIONS