Hospital Aveiro (2008-2012)

1,218 views

Published on

Published in: Health & Medicine
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,218
On SlideShare
0
From Embeds
0
Number of Embeds
10
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Hospital Aveiro (2008-2012)

  1. 1. Hospital Infante D. Pedro, EPE Aveiro, Portugal 2008 - 2012 Executive Administrator (CEO) Luís Coelho
  2. 2. Executive Administrator Hospital Infante D. Pedro, EPE (CEO) Luís Coelho CHARACTERIZATION Society: Public Enterprise Beds: 409 Antiquity: 36 years Emergency visits: 143.397 Location: Coastline Admissions: 17.221 Serves an area: 385.724 residents Surgery: 8.955 Annual budget: 75 million euros Lenght of stay: 6,71 days Employees: 1.469 Medical Consultations: 171.917 Physicians: 179 Operating room: 6 rooms BirthCenter
  3. 3. Executive Administrator Hospital Infante D. Pedro, EPE (CEO) Luís Coelho MEDICAL SPECIALTIES AVAILABLE Allergology Infectious Diseases Radiology Anesthesiology Internal Medicine Rheumatology Cardiology Nephrology Stomatology Clinical Pathology Neurology Urology Clinical Hematology Occupational Medicine Psychiatry and Mental Health Oncology Dermatology Ophthalmology Stroke Unit Endocrinology and Nutrition Orthopedics Unit of Pain ER Otolaryngology Pace-Maker Unit Gastroenterology Pediatrics Intensive Coronary Care Unit (6 beds) General Hematology Pulmonology Polyvalent Intensive Care Unit (5 beds) General Surgery Car Emergency Medical (VMER) Gynecology / Obstetrics Physical Medicine and Rehabilitation
  4. 4. Executive Administrator Hospital Infante D. Pedro, EPE (CEO) Luís Coelho SPECIAL TECHNICAL FACILITIES Power Plant (boiler nº.): 2 Buildings (nº): 4 Station production, handling and distribution of water Elevators (nº): 11 Data center and Informatics Network virtualization Heliport Central Medical Gases Car fleet: 6 vehicles Central Heating, ventilation and air conditioning Station for treating waste water Kitchen and dining room (nº meals / day): 1.000 Central collection and storage of solid waste Central production of cold water Parking (nº places): 200 Transformation station: 2 transformers of 1250 Kva Garden (area): 6.000 m2 Generators: 1 of 800 Kva and 1 of 400 Kva Central fire detection

×