Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Luca Gorgoglione Certini's Resume

123 views

Published on

  • Be the first to comment

  • Be the first to like this

Luca Gorgoglione Certini's Resume

  1. 1. LUCA GORGOGLIONE CERTINI 201 South Heights Blvd. Apt. 2812, Houston, Texas 77007 | 832.819.6714 | lucagoce@gmail.com EDUCATION ROMA TRE UNIVERSITY Master’s Degree: Road Infrastructures and Transportation Systems Engineering, Rome, Italy Oct. 2010-July 2012  US equivalent GPA: 3.9/4.0, graduated with honours (cum laude), 4 months earlier than expected date.  Senior Thesis: “Theoretical And Practical Optimization Of Container Terminals With The Case Study Of Salerno”.  Professor’s Assistant: Only student selected to develop and execute study program for 20 visiting Iraqi engineers learning about Roman port construction and design. Prepared class material, conducted on-site lectures, organized logistics and schedules. Bachelor’s Degree, Civil Engineering, Rome, Italy Oct. 2006-Feb. 2010  US equivalent GPA: 3.5/4.0  Manager of Computational Computer Lab, Manager of student library, Producer of university marketing video, Tutor for 1st year students. WORK EXPERIENCE NATIONAL OILWELL VARCO Structural Engineer, Houston, TX Nov. 2013-Present Design customized oil drilling rigs for customers such as Precision Drilling, DLS Argentina Drilling, and Latshaw Drilling. Manage project teams of engineers, designers and draftsmen throughout development. Issue final approval on all manufacturing drawings and technical documents. Conduct feasibility studies on new designs for Business Development and Product Line Management. Train junior engineers.  Led team of 5 people to redesign “Ideal Rig” (most successful land rig ever designed at NOV) to capitalize on new market opportunity. Given extremely aggressive 6-week timeline to design new mast and substructure; successfully managed project on time and on spec. Led communications with upper management, created project schedule and priorities, assigned tasks, directed bi-weekly meetings and review sessions. Company sold 20 redesigned rigs, generating over $560MM; new design has now been adopted throughout entire product line.  Initiated and developed design book to ensure API audit criteria are met, maintaining NOV’s right to use API brand/monogram on all Ideal rigs.  Lead communications with plants in Mexicali, MX, Shanghai, China and Galena Park, TX to ensure production consistency worldwide.  Captain, NOV Soccer Team: lead and organize team of 25 co-workers through 4-month competitive season; manage finances. Structural Engineer, Edmonton, Canada Mar.-Nov. 2013 Designed several cold-climate oil rigs for customers such as Doyon, United Oilfield Services and Tatneft, sold for $160MM collectively. Worked directly with customers to facilitate contract deviation requests. Supported Nisku manufacturing facility for rig assembling process and design issues or deviations from manufacturing drawings. Led project update communications with corporate office. Managed customer relationships. Created design books for completed projects and third party audits to ensure project compliance with NOV’s safety standards.  Mathematically analyzed rig models and designs of company’s first EU rig designed for Polish customer. Calculated optimal beam sizes, steel grade and welds to minimize manufacturing costs and meet API safety factors.  Engineered mast for Tatneft Slant rig for Russian operations. Performed hand calculations on critical structural connections, guided designers and draftsmen throughout development. Held review sessions and product improvement meetings with senior engineers. Land Rigs Engineer, Galena Park Plant, Galena Park, Texas Oct. 2012-Mar. 2013 Supervised disassembling process of Ideal Rig at plant during first-time rig up and final shipping to customers. Reported manufacturing issues and proposed changes to engineering team to minimize costly rework of products. Implemented procedural improvements based on customer feedback.  Optimized Ideal Rig “Move Plan." Cut down rig relocation time procedures by 33% by creating schedule that maximized use of available resources at rig sites (cranes, fork-lifts, man-lifts, rig workers) and prioritized activities that could be performed simultaneously. Minimized unproductive time and restructured handling order of major rig components based on new man-hour approach.  Identified opportunity to modify rig designs after visiting drilling sites and observing how customers were independently modifying our products. Authored technical reports to build case and sell-through recommended modifications to senior management. AC MILAN ACADEMY Head Soccer Coach, Sydney, Australia Mar.-Sept. 2010 Led and organized 3 youth soccer teams. Managed 3 Assistant Coaches. Planned and directed summer camps.  In 6 months, improved Under-11 team performance to ranking of 4th (of 24 teams), up from 19th in previous year. SKILLS  Language: Italian (native/fluent), English (fluent), Spanish (intermediate; in current study).  Computer: SolidWorks, Safi, Matlab, AUTOCad, Primavera P6, EMME, EMME 2, Syncro, Dynamec, MS Office. COMMUNITY  Volunteer Teacher, The Women’s Resource of Greater Houston: teach financial education classes to low-income women. (2014-present)  Volunteer Mentor, Spring Woods High School: mentor student weekly on education, leadership and international exposure. (2014-Present)  Volunteer Mentor, Big Brothers Big Sisters: work 1x1 with disadvantaged child to foster his interest in learning and education. (2014-Present) PERSONAL  Only student in 2006 with 100/100 GPA at Technical Industrial High School Enrico Fermi in Rome; earned “City of Rome Encomium” award.  Enjoy traveling (lived in 4 countries, travelled to 18), music, learning languages, sports, volunteering, outdoor activities, cooking, reading.

×