Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
3/31/2014
1
City of Lebanon, NH
CSO Contract 10
Public Meeting
April 1, 2014
3/31/2014
2
Contract 10 Locations
• North Main Street
1,000 Feet
Dana to Estabrook Cir.
• Dana Street
250 Feet
Main to Pro...
3/31/2014
3
October 23, 2013
First Public Meeting
• Discussed project design and schedule
• Discussed protection of trees
...
3/31/2014
4
Schedule
• 50% Design – December 2013
• 90% Design – March 2014
• Final Construction Documents – May 2014*
• B...
3/31/2014
5
Small Group Sessions
North Main Street
Component Existing Proposed
Width 28’ 28’
Esplanade 2’-4’ (west) no cha...
3/31/2014
6
3/31/2014
7
Highland Avenue
Prospect to Maple
Component Existing Proposed
Width 20’-22’ 22’
Esplanade None None
Sidewalk N...
3/31/2014
8
HIGHLAND AVE
3/31/2014
9
Highland Avenue
Maple to Green Street West
Component Existing Proposed
Width 22’-24’ 24’
Esplanade 1’-2’ (sout...
3/31/2014
10
HIGHLAND AVE
Prospect Street West
Component Existing Proposed
Width 18’-29’ 22’
Esplanade 1’-5’ (east) 4’ (ea...
3/31/2014
11
3/31/2014
12
3/31/2014
13
Pearl Street
Component Existing Proposed
Width 21’-25’ 22’
Esplanade 1’-4’ (east) 3’ (east)
2’-4’ (west)
Side...
3/31/2014
14
3/31/2014
15
Timothy Avenue
Component Existing Proposed
Width 22’-30’ 22’
Esplanade None None
Sidewalk None None
Drainage ...
3/31/2014
16
TIMOTHY AVE
Winter Street West
Component Existing Proposed
Width 22’-24’ 22’
Esplanade None None
Sidewalk Non...
3/31/2014
17
TIMOTHY AVE/WINTER ST WEST
WINTER ST WEST
3/31/2014
18
Green Street West
Component Existing Proposed
Width 19’-23’ 22’
Esplanade None None
Sidewalk None None
Draina...
3/31/2014
19
Upcoming SlideShare
Loading in …5
×

CSO 10 Public Meeting Presentation

322 views

Published on

A presentation for the April 1, 2014 CSO 10 informational meeting at the Kilton Public Library, Lebanon, NH

  • Be the first to comment

  • Be the first to like this

CSO 10 Public Meeting Presentation

  1. 1. 3/31/2014 1 City of Lebanon, NH CSO Contract 10 Public Meeting April 1, 2014
  2. 2. 3/31/2014 2 Contract 10 Locations • North Main Street 1,000 Feet Dana to Estabrook Cir. • Dana Street 250 Feet Main to Prospect • Highland Avenue 925 Feet Prospect to Green West • Prospect Street West 600 Feet • Pearl Street 600 Feet • Winter Street West 675 Feet • Green Street West 960 Feet • Timothy Avenue 500 Feet June 15, 2013 Walkabout • Conducted site walkabout on June 15, 2013 • Discussed resident concerns • City willing to meet resident at property in the future to discuss concerns
  3. 3. 3/31/2014 3 October 23, 2013 First Public Meeting • Discussed project design and schedule • Discussed protection of trees • Reviewed design drawings • Discussed resident concerns Protection of Trees • Walkabout with arborist will be conducted. • Invites via mailing will be forthcoming. • Contact City staff if you have a concern about a particular tree or planting.
  4. 4. 3/31/2014 4 Schedule • 50% Design – December 2013 • 90% Design – March 2014 • Final Construction Documents – May 2014* • Bid Period – June 2014 • Start Construction – July 2014 • End Construction – September 2015 * Final Public Meeting Project Contacts • Christina Hall, City Engineer Christina.Hall@lebcity.com 603.448.3112 • Mike Lavalla, Director of Public Works Mike.Lavalla@lebcity.com 603.448.3112 • Ryan Wingard, Wright-Pierce Project Manager Ryan.Wingard@wright-pierce.com 603.430.3728
  5. 5. 3/31/2014 5 Small Group Sessions North Main Street Component Existing Proposed Width 28’ 28’ Esplanade 2’-4’ (west) no change (west) 4’-9’ (east) no change (east) Sidewalk 3.5’-5.5’ (both) no change (both) Drainage Vert. Curb/CBs Vert. Curb/CBs
  6. 6. 3/31/2014 6
  7. 7. 3/31/2014 7 Highland Avenue Prospect to Maple Component Existing Proposed Width 20’-22’ 22’ Esplanade None None Sidewalk None 5’ (south) Drainage None Vert. Curb/CBs
  8. 8. 3/31/2014 8 HIGHLAND AVE
  9. 9. 3/31/2014 9 Highland Avenue Maple to Green Street West Component Existing Proposed Width 22’-24’ 24’ Esplanade 1’-2’ (south) 2’ (south) Sidewalk 3.5’-5.0’ (south) 5’ (south) Drainage Vert. Curb/CBs Vert. Curb/CBs
  10. 10. 3/31/2014 10 HIGHLAND AVE Prospect Street West Component Existing Proposed Width 18’-29’ 22’ Esplanade 1’-5’ (east) 4’ (east) Sidewalk 4.5’-5.5’ (east) 5’ (east) Drainage None Vert. Curb/CBs
  11. 11. 3/31/2014 11
  12. 12. 3/31/2014 12
  13. 13. 3/31/2014 13 Pearl Street Component Existing Proposed Width 21’-25’ 22’ Esplanade 1’-4’ (east) 3’ (east) 2’-4’ (west) Sidewalk 4’-6’ (east) 5’ (east) 4’-5.5’ (west) Drainage CBs Curb/CBs Pervious Pavement
  14. 14. 3/31/2014 14
  15. 15. 3/31/2014 15 Timothy Avenue Component Existing Proposed Width 22’-30’ 22’ Esplanade None None Sidewalk None None Drainage Curb/CBs Sloped Curb/CBs TIMOTHY AVE/WINTER ST WEST
  16. 16. 3/31/2014 16 TIMOTHY AVE Winter Street West Component Existing Proposed Width 22’-24’ 22’ Esplanade None None Sidewalk None None Drainage None Sloped Curb/CBs Pervious Pavement
  17. 17. 3/31/2014 17 TIMOTHY AVE/WINTER ST WEST WINTER ST WEST
  18. 18. 3/31/2014 18 Green Street West Component Existing Proposed Width 19’-23’ 22’ Esplanade None None Sidewalk None None Drainage None Sloped Curb/CBs
  19. 19. 3/31/2014 19

×