THINGS ARE TAKING<br />OFF AT<br />
LIT YOUR GATEWAY TO THE WORLD<br />
LIT ADVANTAGES<br />
LIT – Commercial Carriers<br />?<br />
LIT CONTAINMENT AREA<br />91%<br />
LIT – STABILITY IN TROUBLED TIMES<br />While other airports are seeing severe downturns in passengers, Little Rock Nationa...
SHORT Range Terminal Re-DESIGN / <br />REMODEL<br />
CURRENT LOBBY WITH CTX SCANNERS <br />
Long Range Terminal Re-DESIGN / <br />REMODEL<br />
TERMINAL OPTIONS<br />New Terminal – <br />“T” Configuration<br />
OPTION CHOSEN BY COMMISSION<br />“T” Configuration<br />
OPTION CHOSEN BY COMMISSION<br />Departure Level<br />
OPTION CHOSEN BY COMMISSION<br />Arrivals Level<br />
2008 DBE Results<br />Actual<br />Goal<br />
THANK YOU<br />
Upcoming SlideShare
Loading in …5
×

Little Rock National Airport Presentation to the Chamber 9/16/09

889 views

Published on

Since 1983, the Little Rock Chamber's Business Diversity Committee hosts Minority Enterprise Development (MED) Week activities.

LIT Executive Director, Ron Mathieu was the guest speaker.

Published in: Travel, Business, Education
1 Comment
0 Likes
Statistics
Notes
  • Be the first to like this

No Downloads
Views
Total views
889
On SlideShare
0
From Embeds
0
Number of Embeds
188
Actions
Shares
0
Downloads
4
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide

Little Rock National Airport Presentation to the Chamber 9/16/09

  1. 1.
  2. 2. THINGS ARE TAKING<br />OFF AT<br />
  3. 3. LIT YOUR GATEWAY TO THE WORLD<br />
  4. 4.
  5. 5. LIT ADVANTAGES<br />
  6. 6. LIT – Commercial Carriers<br />?<br />
  7. 7. LIT CONTAINMENT AREA<br />91%<br />
  8. 8. LIT – STABILITY IN TROUBLED TIMES<br />While other airports are seeing severe downturns in passengers, Little Rock National has been relatively stable .<br />
  9. 9. SHORT Range Terminal Re-DESIGN / <br />REMODEL<br />
  10. 10. CURRENT LOBBY WITH CTX SCANNERS <br />
  11. 11. Long Range Terminal Re-DESIGN / <br />REMODEL<br />
  12. 12. TERMINAL OPTIONS<br />New Terminal – <br />“T” Configuration<br />
  13. 13. OPTION CHOSEN BY COMMISSION<br />“T” Configuration<br />
  14. 14. OPTION CHOSEN BY COMMISSION<br />Departure Level<br />
  15. 15. OPTION CHOSEN BY COMMISSION<br />Arrivals Level<br />
  16. 16. 2008 DBE Results<br />Actual<br />Goal<br />
  17. 17. THANK YOU<br />

×