Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
DTP_KM HOUSE_FINAL_merged_compressed.pdf
1. - A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
BLOCK PLAN
1 : 400 10 12
2. - A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
SITE PLAN
1 : 100 11 12
3. SCALE 1 : 100
1st FLOOR PLAN - A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
1st FLOOR PLAN
1 : 100 01 12
4. SCALE 1 : 100
2nd FLOOR PLAN - A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
2nd FLOOR PLAN
1 : 100 02 12
5. SCALE 1 : 100
ROOF PLAN - A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
ROOF PLAN
1 : 100 03 12
6. SCALE 1 : 100
SECTION A-A
- A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
SECTION A-A
1 : 100 04 12
7. SCALE 1 : 100
SECTION B-B
- A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
SECTION B-B
1 : 100 05 12
8. SCALE 1 : 100
NORTH ELEVATION
- A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
NORTH ELEVATION
1 : 100 06 12
9. SCALE 1 : 100
EAST ELEVATION
- A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
EAST ELEVATION
1 : 100 07 12
10. SCALE 1 : 100
WEST ELEVATION
- A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
WEST ELEVATION
1 : 100 08 12
11. SCALE 1 : 100
SOUTH ELEVATION
- A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
SOUTH ELEVATION
1 : 100 09 12
12. SCALE 1 : 5
DETAILS A
SCALE 1 : 5
DETAILS C
SCALE 1 : 5
DETAILS B - A3
PROJECT NUMBER PAPER SIZE
DRAWING NUMBER
DRAWING CODE
DATE
ISSUED FOR
OWNER
PROJECT
BY
DATE
R E V I S I O N
NO
REMARKS
DATE
SCALE
DRAWN BY CHECKED BY APPROVED
DRAWING TITLE
ARCHITECTURE CONSULTANT
STRUCTURE CONSULTANT
MEP CONSULTANT
INTERIOR DESIGN CONSULTANT
KM House
FOR CONSTRUCTION
PRINCIPAL ARCHITECT PROJECT ARCHITECT
DRAWING TYPE
ARSITEKTURAL
VINCENT MARTHANEGARA_315190105
ADRIAN LUCAS TEJA_315190019
KELVIN HARTANTO_315190005
ON NO ACCOUNT MAY THIS DRAWING BE SCALED. ANY
DISCREPANCIES IN FIGURED DIMENSIONS IS TO BE REPORTED
IMMEDIATELY TO ALL PARTIES CONCERNED BEFORE
COMMENCEMENT OF WORK. ALL DIMENSIONS MUST BE
VERIFIED ON SITE PRIOR TO FABRICATION.
CONNECT DETAILS
1 : 5 12 12
SCALE 1 : 5
DETAILS D
13.
14.
15. STUDIO PERANCANGAN
ARSITEKTUR VII
THE PRITZKER
HOUSE
KELOMPOK:
VINCENT MARTHANEGARA / 315190105
ADRIAN LUCAS TEJA / 315190019
KELVIN HARTANTO / 315190005
DOSEN KOORDINATOR:
RUDY SURYA Ir., M.M., M.ARS.
DOSEN KELAS:
Ir. HIMALADIN, M.ARS.
DOSEN PEMBIMBING:
Ir. NURYANTO RACHMAN
PERSPEKTIF EKSTERIOR 3 (BIRD EYE VIEW)
16. STUDIO PERANCANGAN
ARSITEKTUR VII
THE PRITZKER
HOUSE
KELOMPOK:
VINCENT MARTHANEGARA / 315190105
ADRIAN LUCAS TEJA / 315190019
KELVIN HARTANTO / 315190005
DOSEN KOORDINATOR:
RUDY SURYA Ir., M.M., M.ARS.
DOSEN KELAS:
Ir. HIMALADIN, M.ARS.
DOSEN PEMBIMBING:
Ir. NURYANTO RACHMAN
PERSPEKTIF EKSTERIOR 4 (BIRD EYE VIEW)
17. STUDIO PERANCANGAN
ARSITEKTUR VII
THE PRITZKER
HOUSE
KELOMPOK:
VINCENT MARTHANEGARA / 315190105
ADRIAN LUCAS TEJA / 315190019
KELVIN HARTANTO / 315190005
DOSEN KOORDINATOR:
RUDY SURYA Ir., M.M., M.ARS.
DOSEN KELAS:
Ir. HIMALADIN, M.ARS.
DOSEN PEMBIMBING:
Ir. NURYANTO RACHMAN
PERSPEKTIF EKSTERIOR 5 (HUMAN EYE VIEW)
18. STUDIO PERANCANGAN
ARSITEKTUR VII
THE PRITZKER
HOUSE
KELOMPOK:
VINCENT MARTHANEGARA / 315190105
ADRIAN LUCAS TEJA / 315190019
KELVIN HARTANTO / 315190005
DOSEN KOORDINATOR:
RUDY SURYA Ir., M.M., M.ARS.
DOSEN KELAS:
Ir. HIMALADIN, M.ARS.
DOSEN PEMBIMBING:
Ir. NURYANTO RACHMAN
PERSPEKTIF EKSTERIOR 6 (HUMAN EYE VIEW)
19. STUDIO PERANCANGAN
ARSITEKTUR VII
THE PRITZKER
HOUSE
KELOMPOK:
VINCENT MARTHANEGARA / 315190105
ADRIAN LUCAS TEJA / 315190019
KELVIN HARTANTO / 315190005
DOSEN KOORDINATOR:
RUDY SURYA Ir., M.M., M.ARS.
DOSEN KELAS:
Ir. HIMALADIN, M.ARS.
DOSEN PEMBIMBING:
Ir. NURYANTO RACHMAN
PERSPEKTIF EKSTERIOR 6 (HUMAN EYE VIEW)
20. STUDIO PERANCANGAN
ARSITEKTUR VII
THE PRITZKER
HOUSE
KELOMPOK:
VINCENT MARTHANEGARA / 315190105
ADRIAN LUCAS TEJA / 315190019
KELVIN HARTANTO / 315190005
DOSEN KOORDINATOR:
RUDY SURYA Ir., M.M., M.ARS.
DOSEN KELAS:
Ir. HIMALADIN, M.ARS.
DOSEN PEMBIMBING:
Ir. NURYANTO RACHMAN
PERSPEKTIF INTERIOR RUANG TENGAH
21. STUDIO PERANCANGAN
ARSITEKTUR VII
THE PRITZKER
HOUSE
KELOMPOK:
VINCENT MARTHANEGARA / 315190105
ADRIAN LUCAS TEJA / 315190019
KELVIN HARTANTO / 315190005
DOSEN KOORDINATOR:
RUDY SURYA Ir., M.M., M.ARS.
DOSEN KELAS:
Ir. HIMALADIN, M.ARS.
DOSEN PEMBIMBING:
Ir. NURYANTO RACHMAN
PERSPEKTIF INTERIOR MASTERBEDROOM
22. STUDIO PERANCANGAN
ARSITEKTUR VII
THE PRITZKER
HOUSE
KELOMPOK:
VINCENT MARTHANEGARA / 315190105
ADRIAN LUCAS TEJA / 315190019
KELVIN HARTANTO / 315190005
DOSEN KOORDINATOR:
RUDY SURYA Ir., M.M., M.ARS.
DOSEN KELAS:
Ir. HIMALADIN, M.ARS.
DOSEN PEMBIMBING:
Ir. NURYANTO RACHMAN
PERSPEKTIF INTERIOR BALKON DEPAN