A Warranty Provider’s perspective of MMC &<br />Eco Building<br />
Who are we?<br />DCLG Designated Warranty Scheme Provider<br />Dedicated Technical Service Company<br />
What is a Structural Warranty?<br /><ul><li>Insurance Policy
Covers Defects in Design, Workmanship and Materials causing Major Damage
Defective Weatherproofing
Drainage
Health & Safety of Occupants
Contaminated Land
Upcoming SlideShare
Loading in …5
×

Build zone structural warranty - a view of mmc eco building

1,180 views

Published on

Build-Zone Structural Warranty - A view of MMC Eco Building

Published in: Real Estate
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,180
On SlideShare
0
From Embeds
0
Number of Embeds
283
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Build zone structural warranty - a view of mmc eco building

  1. 1. A Warranty Provider’s perspective of MMC &<br />Eco Building<br />
  2. 2. Who are we?<br />DCLG Designated Warranty Scheme Provider<br />Dedicated Technical Service Company<br />
  3. 3. What is a Structural Warranty?<br /><ul><li>Insurance Policy
  4. 4. Covers Defects in Design, Workmanship and Materials causing Major Damage
  5. 5. Defective Weatherproofing
  6. 6. Drainage
  7. 7. Health & Safety of Occupants
  8. 8. Contaminated Land
  9. 9. Loss of Deposit</li></li></ul><li>Our experience of MMC & Eco Building methods<br />Should we be concerned or is it all about the risk management?<br />
  10. 10. The Build-Zone partnered Approved Inspector<br />Provides Building Control in the private sector<br />Where the development is for sale or rent must ensure developer is using a Designated Warranty Scheme in respect of the Warranty Link Rule.<br />Must carry Professional Indemnity<br />Must adhere to Surveyor Link systems, training, procedures and practices.<br />
  11. 11. The technical audit process<br />Brick & Block<br />MMC Panel<br />Straw Bale<br />Foundations<br />Structure & Cavities<br />Roof Structure<br />Completion<br />+ Building Control<br />Foundations<br />Panel Lift 1<br />Roof Structure<br />Completion<br />+ Building Control<br />Foundations<br />Walls at 3rd bale<br />Roof Structure<br />Completion<br />+ Building Control<br />Stage release certification available as part of the service<br />
  12. 12. Risk transfer – and claim trends<br />10 Years Risk Transfer<br />No MMC or Eco Build related claim notifications<br />No increase in pricing structure relative to MMC or Eco Build methods<br />Traditional building methods continue to produce workmanship claims on a low frequency basis.<br />
  13. 13. Conclusions<br />MMC and Eco Building are definitely here for the long term and should be subject to exactly the same risk management and long term understanding as we placeon traditional methods of construction. <br />

×