  1. 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 3/31/2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 3/29/2010 Current Activities this Week: Mass Excavation: Mass Excavation Activities in the Main Bowl continues In Areas 2 and 3. . Site Utilities: Installation of the new electrical ductbank has started. Area 3 – Excavation continues at south end Excavation for the manhole on sanitary line D is of Area 3. complete. Boring for the service line for Sanitary Line D is ongoing. Foundations: Area 1 Field Level – Column Pads excavation and Concrete placement is ongoing. Area 1 Field Level – D-Line wall placement is complete. Soil Nail Wall: Area 1 – Shotcrete installation on the 4th lift is ongoing. Concourse Level Area 2 – Electrical Duct nd Area 2 – Shotcrete installation is ongoing on the 2 and bank re-location . 3rd lifts. Field Level Area 1 – D-Line Foundation Wall tie in at Soil Nail Shoring Wall. Building the Future
  2. 2. Projected Activities occurring next Week: Mass Excavation: Remaining mass excavation activities will be nearing completion. Removal of the haul road will begin. Site Utilities: Field Level Area 1 – Concrete placement for Installation of the new electrical ductback will continue. elevator 2/3 slab. Boring under the Field Level D-Line Wall for the Sanitary Main Line D will begin. Foundations: Area 1 Concourse Level – Backfilling of D-Line wall will continue for section placed this week. Area 1 Field Level – A-Line footing placement will continue south towards 19.5 Line. Field Level Area 1 – Formwork in place for Soil Nail Wall: north vomitory wall at Player Field Entrance. Area 2 – Shotcrete placement on the 2nd and 3rd lifts will continue. Area 2 – Shotcrete wall installation continues on 2nd and 3rd lifts. Building the Future
  3. 3. Additional Photos: A shot of Area 1 from the Main Concourse Field Level Area 1 – Backfill, compaction and Level. insulation behind D/SSB-Line Walls. Area 1 – Column pad rebar cages pre-tied. Field Level Area 1 – Column pad excavation at C-Line. Field Level Area 1 – Column pad ready for Area 2 – Preparation for the soil nail pull concrete. test. Building the Future

×