  1. 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 9.29.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 9.27.2010 Current Activities this Week: Foundations: Area 4 Field Level – Foundations for “infill” area between Column Lines 39-1 are ongoing. Concrete Flatwork: Area 3 Field Level –Lower dock slab-on-grade is complete. Prep work for flatwork between column lines 6-4 is Field Level Area 3 – Concrete slab-on grade ongoing. is placed at lower dock area. Masonry: Area 1 – Field level masonry installation is ongoing in Area H, G, F, E and D. Area 2/3 – Concourse building masonry installation is ongoing. Steel Erection: Area 4 – Steel erection for “infill” area will begin 9/30/2010 (Sequence 3-3). Area 2 – Steel joist and metal decking installation for concourse buildings Field Level Area 1 – Subroof, storm line, is ongoing. Canopy decking installation is ongoing. framing and ceiling hanger installation Canopy gutter enclosure framing installation is ongoing. continues on Field Level. Roofing and Sheetmetal: Area 1 – Permanent roofing installation at West Building is ongoing. Area 2 – Canopy gutter installation is ongoing. Concourse Level Area 1 – Steel joist and roof decking being installed at southwest concourse buildings. Building the Future
  2. 2. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels are ongoing. Exterior metal stud framing and sheathing installation is ongoing at Field, Suite, and Press Levels. Glass: Area 1 - Curtainwall framing and glass installation is ongoing at West Building on west, south and east elevations. Roof Level Area 1 – Permanent roofing is being installed on the West Building. MEP Rough-in: Area 3 – Underground MEP rough-in is ongoing. West Building - Ductwork installation on Concourse, Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Press Levels. Fire Protection rough-in is ongoing on Concourse, Suite and Press Levels. Electrical rough-in is ongoing on Concourse, Suite and Press Levels. Area 1 – Shot of the Canopy decking, gutter Projected Activities occurring next Week: installation and gutter enclosure framing at column lines 23-20. Foundations: Area 3/4 Field Level – Foundations for “infill” area between Column Lines 29-1 will be complete. Concrete Flatwork: Area 3 Field Level – Concrete placement for Slab-on Grade from lower dock area to Column Line 4. Area 3 and 4 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Concourse Level Area 1 – Curtainwall Masonry: framing installation has started at field side Area 1 – Field level masonry installation will continue in of Main Club. Area H, G, F, E and D. Area 2/3 – Concourse building masonry installation will continue. Building the Future
  3. 3. Structural Steel Erection: Area 4 – Structural steel erection for “infill” area will be ongoing. Area 2 – Steel joist and metal decking installation for concourse buildings will continue. canopy decking installation will continue. Canopy gutter enclosure framing installation will continue. Roofing and Sheetmetal: Area 4 – Shot of north elevation roof Area 1 – Permanent roofing installation at West structure and on-grading seating progress Building will continue. Area 2 – Canopy gutter installation below. will continue. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Exterior Framing and sheathing installation will continue. Glass: Area 1 – Curtain Framing and Glass installation around West Building will continue. Curtainwall framing on Suite and Press Level balconies will continue. Curtainwall framing at Field Side of Main Concourse will continue. MEP Rough-in: Area 1 – Shot of the west building showing MEP Rough-in at Concourse, Suite and Press Levels will the progress of the exterior envelope. continue. Ductwork installation on Concourse, Suite, and Press Level will continue. Fire Sprinkler installation will continue on Concourse, Suite and Press Levels. Building the Future
  4. 4. Additional Photos: Area 4– Foundation work has started in “fill- Area 2 – Concession/Restroom building in” area between Column Lines 39-1. CMU installation is ongoing. Area 1 – Field side of West Building showing Concourse Level Area 4 – Reinforcing, progress of exterior sheathing. formwork and electrical rough-in is ongoing. Area 1 – Shot of the West Building from the Field Level Area 1 – Metal stud framing and southeast concourse. drywall is ongoing. Building the Future

×