  1. 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 9.15.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 9.13.2010 Current Activities this Week: Underground Utilities: Area 3 - Deep underground Plumbing continues. Foundations: Area 2 Concourse Level – Excavation for remaining D-Line footing has started. Area 3 – Underground plumbing installation Concrete Flatwork: is nearly complete at the lower dock area. Area 4 Field Level – Prep work for lower dock slab on grade has started. Structural Steel Erection: Area 3 – Main Canopy Truss Erection are set to Column Line 1. Area 4 – Metal decking installation in Sequence 3-3 has started. Field Level Area 1 – Subroof decking installation is ongoing MEP Rough-in: Area 3 – Shallow electrical and plumbing rough-in is Area 2 – CMU perimeter wall installation at ongoing. West Building - Ductwork installation on Stage are nearly topped out. Concourse, Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Press Levels. Fire Protection rough-in is ongoing on Concourse, Suite and Press Levels. Electrical rough-in is ongoing on Concourse, Suite and Press Levels. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels are ongoing. Exterior metal stud framing and sheathing installation is ongoing at Field, Suite, and Area 4 – Decking being installed at North Elevation. Building the Future
  2. 2. Press Levels. Masonry: Area 1 Field Level – Masonry wall installation is ongoing in Areas E, F, G and H. Area 1, 2, 3 Concourse Level – Masonry wall installation at Main Concourse Buildings are ongoing. Area 3 – Canopy Truss erection is nearly Curtainwall: complete in Sequence 3-5. Area 1 – Curtainwall framing installation will continue at West Elevation. Installation of Curtainwall glass is ongoing. Projected Activities occurring next Week: Underground Utilities: Deep Plumbing installation will continue in Area 3, moving to the north. Foundations: Area 4 Field Level – Foundation wall installation for Main Stair will begin. Field Level Area 3 – Formwork for Stairs to Cauldron Club is set. Concrete Flatwork: Area 3 Field Level – Concrete placement for Slab-on Grade at lower dock area will begin. Prep work for slab- on-grade for lower dock area will continue. Area 3 and 4 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Structural Steel Erection: Area 2 – Canopy truss installation at North side of Stadium will continue. Area 1/2 – Filled and polished CMU Block walls at the Southwest and South Concourse MEP Rough-in: Buildings. MEP Rough-in at Concourse, Suite and Press Levels will continue. Ductwork installation on Concourse, Suite, and Press Level will continue. Fire Sprinkler installation will continue on Concourse, Suite and Press Levels. Building the Future
  3. 3. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Exterior Framing and sheathing installation will continue. Curtainwall: Area 1 – Curtain Framing and Glass installation will continue. Area 1 – Installation of curtainwall framing at Stair 4. Area 1 – Shot of the west building showing the progress of the canopy decking on trusses. Building the Future
  4. 4. Additional Photos: Concourse Level Area 3 – Exterior CMU walls started northeast Concession and Men’s Field Level Area 3 – Upper Dock concrete is Restroom Buildings. placed. Bowl – Shot of the bowl from the roof of the Field Level Area 1 – Subroof decking Stadium Suite, showing the elevation installation is ongoing. change of the canopy trusses. Area 3 – 300 Ton Crane lifting Column Line 1 Suite Level Area 1 – Metal stud framing and Truss into place. in wall MEP rough-in is ongoing. Building the Future

×