Construction Update 08-18-2010

  1. 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 8.18.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 8.16.2010 Current Activities this Week: Mass Excavation: Backfilling of on-grade seating and foundations are ongoing in Area 3. Site Utilities: Storm and Sanitary Sewer Installation is complete Area 3 – Installation of Storm and Sanitary on the east side of France Family Drive. Lines are complete. Cleanup and repair of France Family Drive has started. Foundations: Area 3 Field Level – Foundation installation continues on the east side of the site (Truck Dock Area). Concrete Flatwork: Area 2 – Prep work for next slab pour is underway from Column Line 15 – 12. Area 3 – Slab-on-Metal Deck is placed to Column Line 1. Structural Steel Erection: Field Level Area 3 – Foundations are Area 1 – Main Canopy Truss Erection are set to Column continuing on East side. Switchback ramp to Line 20. Cauldron Club installation is ongoing. Area 2 – South Scoreboard support steel is set between Column Lines 15 – 18. Precast Concrete: Area 3 – Precast erection is ongoing and is currently set to Column Line 7. Underground MEP: Electrical for Electrical Room 01.12.01 is ongoing. Deep Plumbing has started in Area 3. Area 3 – Precast riser erection has turned the corner is ongoing on the East side and is currently to Column Line 7. Building the Future
  2. 2. MEP Rough-in: Area 2 – Shallow electrical and plumbing rough-in is ongoing. Ductwork installation on Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Press Levels. Fire Protection rough-in is ongoing on Suite Level. Metal Stud Framing: Area 1 – Metal stud framing for Concourse, Suite and Press Area 1 – South Scoreboard support steel is Levels are ongoing. Metal stud framing has started at Field erected. Level. Masonry: Area 1 Field Level – Masonry wall installation is ongoing in Areas F, G and H. Area 3 Concourse Level – Picture framing has started for south concourse buildings. Layout for north buildings are ongoing. Projected Activities occurring next Week: Grading: Area 4 – Grading for field wall foundations will continue. Area 1 – Shot of the West Building from the east concourse. Site Utilities: Gas Service installation will begin. Deep Underground MEP: Deep Plumbing installation will continue in Area 3. Foundations: Area 3 Field Level – Foundation installation will continue. Concrete Flatwork: Area 3 Field Level – Concrete placement for Slab-on Field Level Area 1 – Metal Stud Framing has Grade between Column Lines 15 - 12. started at the Field Level. Area 1, 2 and 3 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Building the Future
  3. 3. Structural Steel Erection: Area 2 – Canopy installation at South side of Stadium will continue. Underground MEP: Deep underground plumbing will continue in Area 3. MEP Rough-in: MEP Rough-in at Suite and Press Levels will continue. Area 1 – Installation of curtainwall framing Ductwork installation on Press Level will continue. Fire at West Building has started. Sprinkler installation will continue on Suite Level. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Suite Level Area 1 – Stair 10 is installed at Stadium Suite. Building the Future
  4. 4. Additional Photos: Suite Level Area 1 – Stair 6 installed to Press Press Level Area 1 – Shot of curtainwall Level. framing from inside the Club. Field Level Area 1 – Backfill for east side on- Field Level Area 3 – Dock Leveler concrete grade seating is ongoing. bases are placed. Mezzanine Level Area 1 – Masonry Field Level Area 3 – Grease Interceptor Pit is installation is ongoing at south mezzanine. installed. Building the Future

×