Construction Update 07-14-2010

  1. 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 7.14.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 7.12.2010 Current Activities this Week: Mass Excavation: Backfilling of on-grade seating is ongoing in Area 2 and Area 3. Site Utilities: Storm Sewer Installation (Line 6000) has started again Concourse Level Area 2 – Underground on the east side of France Family Drive. plumbing and electrical rough-in for the Concourse Buildings is ongoing. Foundations: Area 3 Field Level – Foundation installation continues on the east side of the site. Concrete Flatwork: Area 1 – South Mezzanine concrete placement is ongoing. Subgrade prep is ongoing for the next Field Level Slab-on-Grade pour (Column Line 29-25). Prep work for next Main Concourse structural slab (Column Line 23-19.5) is ongoing. Field Level Area 1 – Cast-in-place concrete riser installation is ongoing. Structural Steel Erection: Area 1 – Erection of Structural Steel Sequence 2-1 is ongoing. Main Canopy truss erection in Sequence 1-7 has started. Underground MEP: Electrical Secondary Distribution is ongoing in Areas 2 and 3. Mezzanine Level Area 1 – Concrete for slab- depression at Food Service Cooler is placed at South Mezzanine. Building the Future
  2. 2. MEP Rough-in: Area 1 – Shallow electrical and plumbing rough-in is ongoing. Ductwork installation on Suite Level has begun. Metal Stud Framing: Area 1 – Metal stud framing for Suite and Press Levels are ongoing. Area 2 –Steel erection in Sequence 2-1 is in Projected Activities occurring next Week: full ongoing. Installation of metal decking has started. Mass Excavation: Backfilling of on-grade seating areas will continue in Area 3. Grading in Area 3 (east of A-Line) will continue. Site Utilities: Installation of the Storm Line 6000 on the East Side (France Family Drive) of the site will continue. Deep Underground MEP: Deep Sanitary and Electrical Distribution installation in Area 3 will continue. Foundations: Area 1 – Shot of the West Building from the Area 3 Field Level – Foundation installation will continue. south concourse area. Concrete Flatwork: Area 1 Field Level – Concrete placement for Slab-on-Grade Will be completed from Column Lines 29-25. Area 1 Field Level – Installation of on-grade seating risers will continue. Structural Steel Erection: Erection of Structural Steel in Sequence 2-1 will continue. Erection of Structural Steel Sequence 3-1 will begin. Suite/Press Levels Area 1 – Metal stud Erection of the Canopy Trusses will continue in Sequence 1-7. framing for Suites are ongoing. Building the Future
  3. 3. Underground MEP: Electrical Secondary will continue in Area 3. MEP Rough-in: Plumbing and Electrical rough-in for Area 1 Field Level slab on grade will continue. MEP Rough-in at Suite Level will continue. Metal Stud Framing: Area 1 – Shot from Roof Level showing the Area 1 – Metal stud framing for Suite and Press Levels will installation of the Canopy Roof Trusses. continue. Field Level Area 3 – F-Line Grade Beam is ongoing. Building the Future
  4. 4. Additional Photos: Area 1 – Structural Steel erection is complete at Stadium Suite now that the Area 1 – Shot of the West Building from the precast seating tub is installed. northeast corner of the project site. Suite Level Area 1 – Metal stud framing and Press Level Area 1 – Metal Stud Framing metal duckwork installation is ongoing. installation is ongoing. Concourse Level Area 1 – Reinforcing Steel Area 1 – Prefabricated plumbing carriers are being installed in preparation for upcoming being delivered to the project site. concrete pour (Column Lines 23-19.5). Building the Future

×