BELMONT TOWN CENTER: Harris Teeter-
Anchored Retail Development
Belmont, North Carolina
September 2016
Site Work Progress
Belmont Town Center
Phase 1 Site Clearing
New Curb
Stowe Rd.
New Curb and Binder
S. Point Rd.
Excavation in Progress
retaining walls, parcel D & E
New Duke Power Poles
power, telephone,
cable relocated
Excavations
outparcels D & E at retaining walls
Retaining Wall Installation
in progress
Phase II
clearing and mulching
Haul Off of Clearing
in progress
Binder Widening
Stowe Rd.
Storm
in progress
Lower Sewer Installed
Excavation at Pond #1
Backfill at Pond #1
borrow area
Phase II
cleared
Offsite Pavement on three
sides of the project
S. Point Rd. and Stowe Rd.
Pavement
Sewer and Storm Structure
behind Harris Teeter
Storm Structures behind
Harris Teeter
Final Fill at Harris Teeter
Dock Appendage in progress
Back Side of Harris Teeter Pad
Structures and Manholes
Delivery
Stowe Rd. Pavement
Improvement
Pump Station Driveway
Stowe Rd.
Bike/Sidewalk Graded
Stowe Rd.
Left Turn Lane
Stowe Rd.
Sidewalk
Stowe Rd.
Intersection Handicap Ramp
S. Point Rd.
Sidewalk
S. Point Rd.
Widening and Overlay
in front of High School
S. Point Rd.
Traffic Signal Pedestrian Pad &
Pole Foundation
main entrance
Traffic Signal Pedestrian
Pad & Pole
main entrance
AT&T Onsite
Retaining Walls at S. Point Rd.
outparcels D & E
Retaining Walls at Outparcel D
Harris Teeter Fueling Lot
Mass Excavation
Outparcel C
Topsoils Behind Shops
Relocated, Ready for Seeding
Detention Pond # 1 Seeded
Water and Storm Onsite
For more information about Paris Projects’specialized, comprehensive
management services from detailed planning through pr...
BELMONT TOWN CENTER: Site Work Progress
Upcoming SlideShare
Loading in …5
×

BELMONT TOWN CENTER: Site Work Progress

48 views

Published on

A 53,000-square-foot Harris Teeter will anchor this site. There will be a gas station and up to ten retail or food clients alongside the grocer. A 4,300 square foot sit-down restaurant will be on the southern end of the site. Five additional buildings will be constructed for retail or office space.

Published in: Real Estate
  • Be the first to comment

  • Be the first to like this

BELMONT TOWN CENTER: Site Work Progress

  1. 1. BELMONT TOWN CENTER: Harris Teeter- Anchored Retail Development Belmont, North Carolina September 2016 Site Work Progress
  2. 2. Belmont Town Center
  3. 3. Phase 1 Site Clearing
  4. 4. New Curb Stowe Rd.
  5. 5. New Curb and Binder S. Point Rd.
  6. 6. Excavation in Progress retaining walls, parcel D & E
  7. 7. New Duke Power Poles power, telephone, cable relocated
  8. 8. Excavations outparcels D & E at retaining walls
  9. 9. Retaining Wall Installation in progress
  10. 10. Phase II clearing and mulching
  11. 11. Haul Off of Clearing in progress
  12. 12. Binder Widening Stowe Rd.
  13. 13. Storm in progress
  14. 14. Lower Sewer Installed
  15. 15. Excavation at Pond #1
  16. 16. Backfill at Pond #1 borrow area
  17. 17. Phase II cleared
  18. 18. Offsite Pavement on three sides of the project
  19. 19. S. Point Rd. and Stowe Rd. Pavement
  20. 20. Sewer and Storm Structure behind Harris Teeter
  21. 21. Storm Structures behind Harris Teeter
  22. 22. Final Fill at Harris Teeter Dock Appendage in progress
  23. 23. Back Side of Harris Teeter Pad
  24. 24. Structures and Manholes Delivery
  25. 25. Stowe Rd. Pavement Improvement
  26. 26. Pump Station Driveway Stowe Rd.
  27. 27. Bike/Sidewalk Graded Stowe Rd.
  28. 28. Left Turn Lane Stowe Rd.
  29. 29. Sidewalk Stowe Rd.
  30. 30. Intersection Handicap Ramp S. Point Rd.
  31. 31. Sidewalk S. Point Rd.
  32. 32. Widening and Overlay in front of High School S. Point Rd.
  33. 33. Traffic Signal Pedestrian Pad & Pole Foundation main entrance
  34. 34. Traffic Signal Pedestrian Pad & Pole main entrance
  35. 35. AT&T Onsite
  36. 36. Retaining Walls at S. Point Rd. outparcels D & E
  37. 37. Retaining Walls at Outparcel D Harris Teeter Fueling Lot
  38. 38. Mass Excavation Outparcel C
  39. 39. Topsoils Behind Shops Relocated, Ready for Seeding
  40. 40. Detention Pond # 1 Seeded
  41. 41. Water and Storm Onsite
  42. 42. For more information about Paris Projects’specialized, comprehensive management services from detailed planning through project closeout: Email info@parisprojects.com or contact Keith Paris directly at 704.373.9996. A 53,000-square-foot Harris Teeter will anchor this site. There will be a gas station and up to ten retail or food clients alongside the grocer. A 4,300 square foot sit-down restaurant will be on the southern end of the site. Five additional buildings will be constructed for retail or office space.

×