VECTOR PRAXIS_ULTRA CUSTOM FABRICATION PROJECT

  1. 1. VECTOR PRAXIS: MODEL DRIVEN DIGITAL FABRICATION
  2. 2. EVERY PART IN EXACTLY THE RIGHT PLACE A MODEL DRIVEN APPROACH TO OFF-SITE, HIGH- TOLERANCE, ULTRA-CUSTOM FABRICATION
  3. 3. THE PROJECT: -‘AAA’ FEATURE STAIR - SEAGRAM BUILDING, 375 PARK AVENUE, NY -STAIR CONNECTS THE 23RD AND 24TH FLOOR -PROJECT ARCHITECT: GENSLER -GENERAL CONTRACTOR: TRISTAR CONSTRUCTION -CONTRACT: DESIGN, DETAIL, BUILD SERVICES -MATERIALS: STEEL, CORIAN, GLASS, STAINLESS STEEL
  4. 4. CHALLENGES/OPPORTUNITIES FEATURE STAIR -COMPLEX GEOMETRY (ELLIPTICAL STAIR) -NYC SITE (LISTED BUILDING) -TIGHT FABRICATION TIMELINE -TIGHT COORDINATION REQUIRED FOR ON-SITE WORK -DESIRE TO MINIMIZE TENANT DISRUPTION -UNDERSIZED FREIGHT ELEVATOR -CORIAN CLADDING REQUIRES HIGH TOLERANCE STEEL STRUCTURE (+/- 1/8”) -ABSOLUTE NOVELTY OF PROCESS
  5. 5. CONCEPT MODEL DRAWINGS JIGS PART ASSEMBLY LOGISTICS INSTALLATION
  6. 6. SIMULTANEOUS VERSUS SEQUENTIAL FABRICATION
  7. 7. PHASE 1 CONCEPT AND DESIGN DEVELOPMENT
  8. 8. SKETCHES QUICKLY LEAD TO A WORKING MODEL THAT GROWS MORE ROBUST AS DESIGN DECISIONS ARE MADE
  9. 9. THE SITE IS CAREFULLY ANALYZED
  10. 10. CONCRETE CHIPPED AWAY FROM STEEL GIRDERS, SITE MEASUREMENTS TAKEN
  11. 11. A PARAMETRIC MODEL IS PRODUCED THAT REPRESENTS A BUILDABLE REALITY. THE MODEL BECOMES THE CARRIER OF ALL INPUT
  12. 12. WITH RENDERINGS THAT REFLECT ACTUAL CONSTRUCTABILITY
  13. 13. ACCURATE ARCHITECT INPUT CAPTURE LEADS TO FASTER RESOLUTIONS AND SPEEDIER APPROVALS
  14. 14. OUR SOLIDWORKS MODELS CAN BE RAPIDLY UPDATED AND VARIOUS CONFIGURATIONS TESTED WITH FULL PARAMETRIC CONTROL Ie. MAKE CHANGES TO THE THICKNESS OF A GIVEN MATERIAL AND THE MODEL WILL RESPOND TO ALTER AFFECTED ASSEMBLIES AND COMPONENTS.
  15. 15. WE DESIGN MULTI-MATERIAL ASSEMBLIES FOR FASTER AND MORE ACCURATE INSTALLATION- A PRECISE KIT OF PARTS
  16. 16. INTEGRATED ‘POUR STOP’ ASSEMBLY -COMPLETE GLASS SHOE -ALL STRUCTURE REQ’D TO CONNECT TO BASE BUILDING -INSTALLED TO EXACT CEILING HEIGHT FOR APPROPRIATE REVEALS AND OTHER ARCH DETAILS
  17. 17. -THIS INTEGRATED POURSTOP ASSEMBLY COMBINES THE WORK OF 5 TRADES IN ONE PRE-FABRICATED PART -WHAT COULD TAKE WEEKS TO INSTALL USING TYPICAL METHODS, TAKES A COUPLE DAYS TO INSTALL MONTHS BECOME WEEKS, WEEKS BECOME DAYS
  18. 18. LOGISTICAL CONSIDERATIONS ARE UNDERSTOOD THROUGH THE MODEL AND FORM A SIGNIFICANT PART OF THE DESIGN PROCESS
  19. 19. PHASE 2 MASTER MODEL THE MODEL CONTAINS: CUT FILES BILL OF MATERIALS WEIGHT OF MATERIALS LOGISTICS AND SHIPPING INFORMATION COST CALCULATIONS DESIGN DOCUMENTS FABRICATION DRAWINGS FOR OUTSIDE TRADES ASSEMBLY DRAWINGS JIG AND FIXTURE SYSTEMS FOR FABRICATION INFORMATION FOR COORDINATION WITH CLIENT ETC. THIS IS TRUE PARAMETRIC BIM.
  20. 20. MODEL GEOMETRY READILY EXPORTED TO ENGINEERING SOFTWARE FOR LOAD ANALYSIS AND STRUCTURAL REFINEMENT AS REQUIRED
  21. 21. TEMPLATES ARE PRODUCED FROM MODEL GEOMETRY TO AID CONTRACTOR WITH LAYOUT AND DEMOLITION
  22. 22. A SIMILAR TEMPLATE RECREATES THE SITE CONDITION IN THE SHOP
  23. 23. EXTREMELY ACCURATE ASSEMBLIES ARE PRODUCED FROM THIS TEMPLATE SYSTEM
  24. 24. A SERIES OF JIG SYSTEMS ARE PRODUCED WITHIN THE MODEL FOR THE FABRICATION OF STEEL AND CORIAN COMPONENTS STEEL ASSEMBLY JIG CORIAN ASSEMBLY JIG
  25. 25. FROM MODEL TO SHOP FLOOR JIG FOR STRUCTURAL STEEL AND HANDRAIL JIG FOR CORIAN BENDING
  26. 26. CUT FILES SENT OUT TO STEEL FABRICATOR FOR PRECISE CUTTING AND ROLLING
  27. 27. PHASE 3 SIMULTANEOUS PRODUCTION OF ALLIED PARTS & ASSEMBLIES IN SEPARATE LOCATIONS
  28. 28. STEEL STRINGERS ASSEMBLED IN JIG
  29. 29. STAIR SECTIONS ASSEMBLED
  30. 30. FROM DRAWINGS EXTRACTED FROM THE MASTER MODEL
  31. 31. MEANWHILE CORIAN PRODUCTION BEGINS AT SOLID SURFACE FABRICATOR
  32. 32. OTHER COMPONENTS CONTINUE TO BE PRODUCED AT VP SHOP
  33. 33. FABRICATION DRAWINGS FROM THE MODEL ENABLE HIGH PRECISION FABRICATION AND PERFECT FIT
  34. 34. HANDRAIL BENDING AND FITTING TO JIG
  35. 35. IN-HOUSE TESTING OF COMPONENTS AND ADHESIVES
  36. 36. HOIST POINTS ARE CALCULATED THROUGH THE MODEL AND ELIMINATE GUESSWORK
  37. 37. SPLICE PLATES CONNECT STAIR SECTIONS AND ELIMINATE ON-SITE WELDING
  38. 38. ALL DETAILED EXCLUSIVELY THROUGH THE MODEL
  39. 39. AS CORIAN SECTIONS ARE COMPLETED THEY CAN BE TEST FIT TO THE MASTER JIG WITH STEEL STRUCTURE ASSEMBLED
  40. 40. WHILE FABRICATION CONTINUES ON OUR END, BASE BUILDING STEEL IS GOING IN, READY FOR OUR WORK WITHOUT DELAY
  41. 41. PHASE 4 SHIPPING COMPLETE ASSEMBLIES ‘JUST-IN-TIME’ TO SITE FOR IMMEDIATE ERECTION
  42. 42. STAIR ASSEMBLIES WITH CUSTOM CARTS DESIGNED TO FIT WITHIN SITE ELEVATOR AID INSTALLATION
  43. 43. STEEL ERECTION DETAILED INSTALLATION DRAWINGS PRODUCED FROM THE MODEL FOR USE BY THE NYC ERECTOR
  44. 44. LOAD-IN OF STEEL
  45. 45. HOISTING STEEL SECTIONS INTO POSITION
  46. 46. THE STAIR SECTIONS ARE ERECTED ON-SITE IN LESS THAN A WEEK
  47. 47. CORIAN INSTALLATION THE CORIAN IS INSTALLED PERFECTLY, ENABLING CONCURRENT GLASS INSTALLATION WHILE THE CONTRACTOR COMPLETES OTHER SITE WORK
  48. 48. CORIAN COMPONENTS SLEEVE OVER STEEL STRUCTURE
  49. 49. CORIAN COMPLETE, TREADS TO GO IN
  50. 50. MODEL DRIVEN FABRICATION ENABLES TREADS TO BE LASER CUT OFF-SITE. TREADS AND RISERS ARE INSTALLED ON-SITE IN 2.5 DAYS
  51. 51. INSTALLATION OF HANDRAIL
  52. 52. A CENTRAL JIG ENABLES THE HANDRAIL TO BE OFF-SITE FABRICATED AVOIDING SEQUENTIAL PRODUCTION AND SHAVING WEEKS OFF THE PROCESS
  53. 53. COMPLETION IMAGES

×