  1. Stage 2 Trillium Line Independent Peer Review Light Rail Sub-Committee May 26, 2023
  2. Background 2 Discussion Quality of railway design, construction, and installation on the TLE City Council Third-party Peer Review Objectives ● Analyze & validate TNEXT's strategies & methodologies ● Identify any potential issues Procurement SYSTRA Canada Inc. and RATP Dev. Canada Final Report Oct 2021 Dec 2021 May 2022 Feb 2023
  3. Company profile 3 RATP Group SYSTRA Canada Relevant Projects - ARTM Blue Line Extension Peer Review Montreal, Canada - Lusail Light Rail Transit Doha, Qatar - Al Sufouh Tramway System Project Dubai, United Arab Emirates Certified ISO 9001:2015 History Over 60 years of experience 7,500 employees worldwide Services Transportation Solutions Advise, Design and Build New Mobility Systems History Over 120 years of experience 3rd largest public transport entity worldwide Services Operations & Maintenance Services Design, Build, Operate, Maintain, and Modernize Urban Rail Systems
  4. Process 4 Review Extensive Review of various documentation from project management, design, construction, testing, operation and Maintenance. Interviews Series of interviews and workshops with the TransitNEXT team. Site Visit A site visit to various project locations, including the Main Server Room, the Test Lab, the Main Control Centre, the MSF, and the Walkley Station. Discussion Several rounds of constructive discussions with TransitNEXT and the City to arrive at a shared understanding of the strategies employed based on the work completed to date. Final Review Final report identifies project risks and offers recommendations, based on final review of document updates and feedback from City/TransitNEXT. Action Plan City has taken active steps to address any identified shortfalls by implementing an action plan throughout the ongoing project development
  5. 47 action Items 5 Operations & Maintenance (9) Rail Systems (20) Project Management (3) Rail Infrastructure (5) Safety Processes (10) • Trackwork • Tunnel Ventilation System • Construction Control • Trains and Systems • Rail Communication Systems • Testing & Commissioning • System Engineering Management
  6. Status of action Items 6 In Progress (7) • Post Concrete Placement Verification • On-site Systems Integration Addressed in an Alternative Format (13) Future Consideration (4) To be explored further based on System Performance Fully Addressed (23) • Revisions to various documents • Issuance of Documents Following Peer Review • Completed Testing • Ongoing Report Updates • Recurring Meetings • Future Testing
  7. Project management 7 New Baseline Schedule Lessons-learned Document Training Schedule
  8. Rail infrastructure 8 Direct Fixation Track - Methodology & Tests Limebank Crossover Rail (StructureInteractionAnalysis) Tunnel Temperature & Trains HVAC Tunnel Ventilation documentation Post Concrete Placement Verification
  9. Rail systems (1 of 2) 9 Cold Weather Test (Door Operator) Cold Weather Test (Engine Startup) Interior & Exterior Noise Tests Bogie Rotational Resistive Test Vehicle Vertical Gaps at the Platform Train Control System Test (GEBR Test) Testing & Commissioning Test Plan Systems Testing & Documentation Testing & Commissioning Schedule
  10. Rail systems (2 of 2) 10 Considerations for the Future Electrification Accountability for Systems Configuration Management System Breakdown Structure & Functional Breakdown Structure EMC Control Plan update Operating Requirements for 98.5% Service Delivery
  11. Operations & maintenance 11 2048 Ridership Forecast MinimumAchievable Headway South Keys Turnaround Time 8th Stadler Train Maintenance Mobilization Plan Maintenance Software Additional Incident Simulations Maintenance Schedule Obsolescence Management Plan
  12. Safety processes 12 RAMS Activities (V-Model Life Cycle) RAMS Team (Autonomy/Authority/Independence) RAMS Terms (Definitions) RAM Apportionment (from top level down to the LRU) RAMS Data Collection and Verification Risk Reduction (Safety/RAMS Related Risks) Common Cause FailureAnalysis Hazards & Mitigations Alstom LINT Functional Interfaces CENELEC Complience
  13. Questions? 13