Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Seagas LNG Bunkering Viking Grace

2,539 views

Published on

Great photos illustrate LNG fuel bunkering logistics in Sweden. Truck to ship LNG loading of Seagas, transport LNG, ship to ship Seagas LNG bunkering fuel to Viking Grace, and description of LNG bunkering process.

Published in: Engineering
  • Contibuting in the Projects aims by offering a Broadband IP network at 8Mbps-300Mbps at low cost
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Cypriot omnis-CleanFuelsServices is in condition in offering a plethora of IoT Maritime Services, Networking vessels equipped with Wartsila’s engines between them & with Wartsila’s Headquarters, capitalizing on the innovative Broadband IP Network (SES/Maritime+),” particularly suited for vessels with medium ... high data volumes 40...100+ GByte data volume per month” Launching-Managing-Monetizing IoT Jasper CCPlatform Services enabling the provision of“Preventive vessels’ Conditional Maintenance-Autonomous Vessels’ Navigation – Entertainment of crews by IPTV-SatMed -Fuel Metering & measuring by Krill VFMMS & Emerson Coriolis mm sensors & other on the way to be defined IoT based Services.. Vessels’ compulsory compliance with EC.Reg.747/2015 MRVmay be easily implemented, by capitalizing on omnis-CleanFuelsServices’ Broadband IP Network (SES/ Maritime) , Managed by IoT Jasper CCP Services, conceived & disseminated by Wartsila & other Maritime s/w developers, aiming in connecting- networking vessels, equipped with Wartsila engines, between them & with Wartsila’s Headquarters in EU & other International locations , for remote survey of vessels’ Wartsila LNG fueled engines’ performances, capitalizing on Broadband IP Network (SES/Maritime+) operational speeds of 8Mbps up to 300Mbps (SES+O3b) provided at an impressively low-cost, dramatically lower than conventional Satellite Kbps-based Communication Services.
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here

Seagas LNG Bunkering Viking Grace

  1. 1. © Wärtsilä SEA GAS LNG BUNKERING VIKING GRACE 4.10.2016 [Presentation name / Author]1 John Hatley PE Gas Initiatives ( MBA, MSE ) Wartsila North America Cell 281 221 4209 john.hatley@wartsila.com Singapore Maritime Ports Authority LNG Bunkering Roundtable Resorts World Convention Center Singapore 4 October 2016
  2. 2. © Wärtsilä 13 May 2016 25 August 2016 4.10.2016 [Presentation name / Author]2 LNG Fuel Milestones Summer 2016… Viking Grace 4 million Passengers &, 1,000 LNG bunkerings Source: http://shipandbunker.com/news/world/515838-viking-cruise-vessel- marks-1000-lng-bunkering-milestone
  3. 3. © Wärtsilä Viking Grace ROPAX 4.10.2016 [Presentation name / Author]3 Length: 214.0 m Breadth: 31.8 m Cruise Speed 22 knots Passengers: 2,800 RoRo Lane Meters 1,275m Car Lane Meters 1,000m Crew 200 Cabins 880 Ice class: 1A Super In service: 2013 Shipyard STX Finland Oy Ship Owner: Viking Line Fuel LNG Power Wartsila 4x 8L50DF 31,200 kW ( 41,800 HP )
  4. 4. © Wärtsilä Viking Grace LNG Fuel 4.10.2016 [Presentation name / Author]4 LNG Fuel Capacity 3 Round Trips 2 LNGpac tanks @ 200 m3 each Daily LNG Fuel Consumption ≈ 45 tons ( 105 m3 )
  5. 5. © Wärtsilä Viking Grace LNG System 4.10.2016 [Presentation name / Author]5 LNGpac Port LNG Bunker Station Starboard LNG Bunker Station Gas Valve Unit “GVU” 2x 8L50DF Engines 2x 8L50DF Engines Vent Mast
  6. 6. © Wärtsilä Viking Grace Route 4.10.2016 [Presentation name / Author]6 24 Hour Round Trip Turku evening… Stockholm morning… Midpoint stopover Mariehamn. Bunkering LNG Stockholm daily…
  7. 7. © Wärtsilä LNGF SEAGAS Bunker Vessel 4.10.2016 [Presentation name / Author]7 Ex Car Ferry Fjalir Length: 49.6 m Breadth: 11.2 m Cruise Speed 13 knots Accommodation 4 Conversion March 2013 Shipyard Fiskerstrand Verft Owner AGA Gas AB Fuel Diesel Power 735 kW LNG Capacity ≈ 86 tons ( 185 m3 ) 1 Cryogenic Tank Type 1870-HCB-15-DNV/PED Source: http://www.fiskerstrand.no/site/img/208/FV--Fact- sheets-Conversion-and-Rebuilding---LNGF-Seagas.pdf Source: photo by John Hatley June 2016 Stockholm harbor
  8. 8. © Wärtsilä Seagas Route 4.10.2016 [Presentation name / Author]8 Loading LNG @ Loudden Transit Short 3.3 Nm Distance Arrive Stadsgarden Terminal Bunker LNG Fuel to Viking Grace Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
  9. 9. © Wärtsilä LNG Logistic Modes 4.10.2016 [Presentation name / Author]9 Source: LNG Supply Security LNG Infrastructure, Bryan Luftglass, The Linde Group, June 2013 LNGC… Ship to Shore Shore to Truck Truck to Ship Ship to Ship
  10. 10. © Wärtsilä Loudden LNG Terminal… Truck to Ship 4.10.2016 [Presentation name / Author]10 3 Truck Loads to Seagas Total LNG ≈ 75 Tons (160 m3)Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
  11. 11. © Wärtsilä Sea Gas Route 4.10.2016 [Presentation name / Author]11 Loaded LNG @ Loudden Transit about ½ hour to Stadsgarden Terminal Bunker Viking Grace Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
  12. 12. © Wärtsilä Viking Grace LNG Bunker Plan 4.10.2016 [Presentation name / Author]12 Source: John Hatley detailed LNG bunkering notes, SEAGAS to Viking Grace, 21 May 2014. Wednesday 21 May 8 minutes prep 40 minutes LNG transfer 8 minutes conclude
  13. 13. © Wärtsilä Stockholm Stagsgarden Terminal Ship to Ship 4.10.2016 [Presentation name / Author]13 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 SEAGAS Alongside Aft Port Quarter of Viking Grace … Readying to commence LNG fueling
  14. 14. © Wärtsilä Bunker Safety Zone 4.10.2016 [Presentation name / Author]14 Source: photo John Hatley, Stockholm LNG Fueling, June 2016 25 Meters
  15. 15. © Wärtsilä Bunkering Safety Zone 4.10.2016 [Presentation name / Author]15 25 Meters
  16. 16. © Wärtsilä Seagas LNG Hose Rig 4.10.2016 [Presentation name / Author]16 Source: photo John Hatley, Stockholm LNG Fueling, June 2016 Hydraulic Knuckle Boom 6 inch Cryogenic hose Safe Break Away Coupling Quick Connect Dry Disconnect Coupling
  17. 17. © Wärtsilä LNG Hose Coupling Details 4.10.2016 [Presentation name / Author] 17 Mann-Tek 6” Safe Break Away Coupling “SBC” Mann-Tek 6” Dry Disconnect Coupling “DDC” Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
  18. 18. © Wärtsilä Alongside Begin Hose Connection 4.10.2016 [Presentation name / Author]18 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 Viking Grace Bunker Port
  19. 19. © Wärtsilä LNG Fueling 4.10.2016 [Presentation name / Author]19 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 Discharge LNG Fuel to Viking Grace
  20. 20. © Wärtsilä Sea Gas LNG Fueling Viking Grace 4.10.2016 [Presentation name / Author]20
  21. 21. © Wärtsilä LNG fueling 4.10.2016 [Presentation name / Author]21 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 Viking Grace Bunker Port Onboard Sea Gas
  22. 22. © Wärtsilä Time Events 4.10.2016 [Presentation name / Author]22
  23. 23. © Wärtsilä Connection Details 4.10.2016 [Presentation name / Author]23 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 Viking Grace Bunker Port Onboard Sea Gas
  24. 24. © Wärtsilä Simultaneous Operations “SIMOPS” 4.10.2016 [Presentation name / Author]24 Roll On Roll Off Vehicles @ Bow Adjacent Terminal Roadway Traffic Passengers LNG Fueling
  25. 25. © Wärtsilä Viking Grace LNG Bunkering Timeline 4.10.2016 [Presentation name / Author]25 0725 Viking Grace All Fast Stockholm 0730 SEAGAS alongside aft port quarter 0731 LNG hose in position 0735 Cool down complete 0817 Liquid LNG Transfer complete 0825 Nitrogen Purge Complete 0826 SEAGAS Retrieves LNG hose onboard 0827 SEAGAS last line to Viking Grace 0827 SEAGAS maneuvers away 0842 Viking Grace last line Port Stockholm Source: John Hatley detailed LNG bunkering notes, SEAGAS to Viking Grace, 21 May 2014. Bunker Plan Wednesday 21 May 8 minutes prep 40 minutes LNG transfer 8 minutes conclude LNG Bunker Log Wednesday 21 May
  26. 26. © Wärtsilä Viking Grace 4.10.2016 [Presentation name / Author]26
  27. 27. © Wärtsilä SEA GAS LNG BUNKERING VIKING GRACE QUESTIONS ? 4.10.2016 [Presentation name / Author]27 John Hatley PE Gas Initiatives ( MBA, MSE ) Wartsila North America Cell 281 221 4209 john.hatley@wartsila.com Singapore Maritime Ports Authority LNG Bunkering Roundtable 4 October 2016

×