FINAL CONSTRUCTION DOCUMENTS (GMP) REPORT
THE GROVE PLAZA RENOVATION
May 2, 2016
TABLE OF CONTENTS
This Final Construction Documents (GMP) Report, presents a
Guaranteed Maximum Price (GMP) estimate for the cost of work associated
with the Grove Plaza Renovation. Potential investment expenditures are
captured and defined within the framework of current design, existing site
and market conditions, delivery schedules, general conditions, and other
jurisdictional requirements. The purpose of this deliverable is to present GMP
documents which will serve as baseline references for the duration of the
project delivery, and to obtain final authorization to proceed with construc-
tion phase activities on May 17, 2016. Presented costs are a product of a
qualified public bid process executed in April 2016. Bid packages were so-
licited utilizing the Final Construction Documents and Specifications, Logistics
Plans, and Phased Delivery Schedule provided herein.
Report reference supplements include a detailed cost estimate with as-
sumptions and clarifications, based upon the latest published 99% Bid Docu-
ments. Alternate rough order of magnitude (ROM) budget pricing is includ-
ed, as well as detailed breakout of estimated General Conditions. A Project
Schedule is included for evaluating deadlines and milestones as applicable
to this project. Logistic Plans, including site signage, pedestrian travel-ways
and traffic control, are provided to identify and reconcile constraints as-
sociate with the project. All work phases identified with the project delivery
schedule are reconciled with said plans, providing an integrated and holistic
project delivery concept tied to the GMP estimate. Existing site conditions in
photo format are provided as a supplement to the design documents, and
were utilized to validate assumptions and overall design intent. A Project
Management Plan is also provided highlighting how the project is intended
to be managed through the remaining project delivery phases.
The documents and information included herein are proprietary and confi-
dential to McAlvain Construction, Inc., and Capitol City Development Cor-
poration (CCDC), and are not intended for the use of others. Duplication or
redistribution without the express written permission of its authors is prohibited.
TABLE OF CONTENTS
1| CONSTRUCTION DOCUMENTS (GMP) ESTIMATE & QUALIFICATIONS
	 a| Assumptions and Clarifications
	 b| Estimate
	 c| Alternates/Rough Order of Magnitude (ROM) Budget Pricing
	 d| General Conditions
2| CONSTRUCTION DOCUMENTS (GMP) BASELINE PROJECT SCHEDULE
3| QUALITY ASSURANCE AND CONSTRUCTABILITY REVIEW
	 a| Existing Conditions Photos
4| SITE LOGISTICS PLANS
	 a| Site Logistics Plan
	 b| Site Signage Plan
	 c| Traffic Control Plan
	 d| Pedestrian Flow Plan
5| PROJECT MANAGEMENT PLAN
	 a| Project Management Plan
	 b| Appendix A - Work Breakdown Structure (WBS)
1| CONSTRUCTION DOCUMENTS (GMP) ESTIMATE & QUALIFICATIONS
	 a| Assumptions and Clarifications
	 b| Estimate
	 c| Alternates/Rough Order of Magnitude (ROM) Budget Pricing
	 d| General Conditions
2| CONSTRUCTION DOCUMENTS (GMP) BASELINE PROJECT SCHEDULE
3| QUALITY ASSURANCE AND CONSTRUCTABILITY REVIEW
	 a| Existing Conditions Photos
4| SITE LOGISTICS PLANS
	 a| Site Logistics
	 b| Site Signage Plan
	 c| Traffic Control Plan
	 d| Pedestrian Flow Plan
5| PROJECT MANAGEMENT PLAN
	 a| Project Management Plan	
	 b| Appendix A - Work Breakdown Structure (WBS)

More Related Content

What's hot

What's hot (17)

Peter White CV
Peter White CV Peter White CV
Peter White CV
 
Maaden Exp.
Maaden Exp.Maaden Exp.
Maaden Exp.
 
Apel GEF GHG accounting methods requirements Nov 10 2014
Apel GEF GHG accounting methods requirements Nov 10 2014Apel GEF GHG accounting methods requirements Nov 10 2014
Apel GEF GHG accounting methods requirements Nov 10 2014
 
Zimmerman.marybeth
Zimmerman.marybethZimmerman.marybeth
Zimmerman.marybeth
 
IRS Sep2016 Vonline
IRS Sep2016 VonlineIRS Sep2016 Vonline
IRS Sep2016 Vonline
 
Fixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) ActFixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) Act
 
Using TILOS in Pipelines
Using TILOS  in PipelinesUsing TILOS  in Pipelines
Using TILOS in Pipelines
 
PMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce StephanPMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce Stephan
 
Linear scheduling LSM
Linear scheduling LSMLinear scheduling LSM
Linear scheduling LSM
 
Summer Student Presentation 2016 Charlie Morgan
Summer Student Presentation 2016 Charlie MorganSummer Student Presentation 2016 Charlie Morgan
Summer Student Presentation 2016 Charlie Morgan
 
PMO Global Awards_France Framatome
PMO Global Awards_France FramatomePMO Global Awards_France Framatome
PMO Global Awards_France Framatome
 
What Programme do you need, when and why
What Programme do you need, when and whyWhat Programme do you need, when and why
What Programme do you need, when and why
 
Tilos for linear project
Tilos for linear projectTilos for linear project
Tilos for linear project
 
For expressways
For expresswaysFor expressways
For expressways
 
Presentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah IghagbonPresentation of Quarterly Report_Deborah Ighagbon
Presentation of Quarterly Report_Deborah Ighagbon
 
S curve1
S curve1S curve1
S curve1
 
Resume_Sannikov Detailed
Resume_Sannikov DetailedResume_Sannikov Detailed
Resume_Sannikov Detailed
 

Similar to Grove Plaza Renovation GMP Report

CDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 StrategyCDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 StrategyRobert Doig
 
Pollitt.julie
Pollitt.juliePollitt.julie
Pollitt.julieNASAPMC
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aForbes Chanakira
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne PearceSuzanne Pearce
 
Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209Alan Millett
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
Csr 2014-khyber-pakhtunkhwa
Csr 2014-khyber-pakhtunkhwaCsr 2014-khyber-pakhtunkhwa
Csr 2014-khyber-pakhtunkhwaIftikhar Mahmood
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project ReportRISHABHSIINGH
 
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVIPLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVIIRJET Journal
 
Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and controlJanak Singh Chauhan
 
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...IRJET Journal
 
Running head FINAL ASSIGNMENT1FINAL ASSIGNMENT.docx
Running head FINAL ASSIGNMENT1FINAL ASSIGNMENT.docxRunning head FINAL ASSIGNMENT1FINAL ASSIGNMENT.docx
Running head FINAL ASSIGNMENT1FINAL ASSIGNMENT.docxcowinhelen
 
Coonce.tom
Coonce.tomCoonce.tom
Coonce.tomNASAPMC
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...World-Academic Journal
 

Similar to Grove Plaza Renovation GMP Report (20)

CDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 StrategyCDS Construction Execution Process ^0 Strategy
CDS Construction Execution Process ^0 Strategy
 
4
44
4
 
Qa qc-waste unit4
Qa qc-waste unit4Qa qc-waste unit4
Qa qc-waste unit4
 
Pollitt.julie
Pollitt.juliePollitt.julie
Pollitt.julie
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_a
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
 
Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209Modularization Technical Overview - DSD 20151209
Modularization Technical Overview - DSD 20151209
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Kiran H K 17-06-2016
Kiran H K 17-06-2016Kiran H K 17-06-2016
Kiran H K 17-06-2016
 
Capital Programs - O'Hare 21
Capital Programs - O'Hare 21 Capital Programs - O'Hare 21
Capital Programs - O'Hare 21
 
Csr 2014-khyber-pakhtunkhwa
Csr 2014-khyber-pakhtunkhwaCsr 2014-khyber-pakhtunkhwa
Csr 2014-khyber-pakhtunkhwa
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVIPLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
 
H1303055462
H1303055462H1303055462
H1303055462
 
Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and control
 
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
A Project On Comparative Analysis Of Cost Overrun And Time Delay In Road Cons...
 
Information Management and Model Checking
Information Management and Model CheckingInformation Management and Model Checking
Information Management and Model Checking
 
Running head FINAL ASSIGNMENT1FINAL ASSIGNMENT.docx
Running head FINAL ASSIGNMENT1FINAL ASSIGNMENT.docxRunning head FINAL ASSIGNMENT1FINAL ASSIGNMENT.docx
Running head FINAL ASSIGNMENT1FINAL ASSIGNMENT.docx
 
Coonce.tom
Coonce.tomCoonce.tom
Coonce.tom
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
 

More from Jamal Nelson, CCM

ICOM Schedule & Logistics (1)
ICOM Schedule & Logistics (1)ICOM Schedule & Logistics (1)
ICOM Schedule & Logistics (1)Jamal Nelson, CCM
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Jamal Nelson, CCM
 
ISU Davis Field Presentation - FINAL
ISU Davis Field Presentation - FINALISU Davis Field Presentation - FINAL
ISU Davis Field Presentation - FINALJamal Nelson, CCM
 
Director of Preconstruction JD
Director of Preconstruction JDDirector of Preconstruction JD
Director of Preconstruction JDJamal Nelson, CCM
 
062115 Weekly Pulse 13-0934 Elkhorn Lodge
062115 Weekly Pulse 13-0934 Elkhorn Lodge062115 Weekly Pulse 13-0934 Elkhorn Lodge
062115 Weekly Pulse 13-0934 Elkhorn LodgeJamal Nelson, CCM
 
Analyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project DeliveryAnalyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project DeliveryJamal Nelson, CCM
 

More from Jamal Nelson, CCM (8)

ICOM Schedule & Logistics (1)
ICOM Schedule & Logistics (1)ICOM Schedule & Logistics (1)
ICOM Schedule & Logistics (1)
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 
ISU Davis Field Presentation - FINAL
ISU Davis Field Presentation - FINALISU Davis Field Presentation - FINAL
ISU Davis Field Presentation - FINAL
 
Director of Preconstruction JD
Director of Preconstruction JDDirector of Preconstruction JD
Director of Preconstruction JD
 
062115 Weekly Pulse 13-0934 Elkhorn Lodge
062115 Weekly Pulse 13-0934 Elkhorn Lodge062115 Weekly Pulse 13-0934 Elkhorn Lodge
062115 Weekly Pulse 13-0934 Elkhorn Lodge
 
Analyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project DeliveryAnalyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project Delivery
 
TVD Workshop - Boise
TVD Workshop - BoiseTVD Workshop - Boise
TVD Workshop - Boise
 
Slideshow Draft
Slideshow DraftSlideshow Draft
Slideshow Draft
 

Grove Plaza Renovation GMP Report

  • 1. FINAL CONSTRUCTION DOCUMENTS (GMP) REPORT THE GROVE PLAZA RENOVATION May 2, 2016
  • 3. This Final Construction Documents (GMP) Report, presents a Guaranteed Maximum Price (GMP) estimate for the cost of work associated with the Grove Plaza Renovation. Potential investment expenditures are captured and defined within the framework of current design, existing site and market conditions, delivery schedules, general conditions, and other jurisdictional requirements. The purpose of this deliverable is to present GMP documents which will serve as baseline references for the duration of the project delivery, and to obtain final authorization to proceed with construc- tion phase activities on May 17, 2016. Presented costs are a product of a qualified public bid process executed in April 2016. Bid packages were so- licited utilizing the Final Construction Documents and Specifications, Logistics Plans, and Phased Delivery Schedule provided herein. Report reference supplements include a detailed cost estimate with as- sumptions and clarifications, based upon the latest published 99% Bid Docu- ments. Alternate rough order of magnitude (ROM) budget pricing is includ- ed, as well as detailed breakout of estimated General Conditions. A Project Schedule is included for evaluating deadlines and milestones as applicable to this project. Logistic Plans, including site signage, pedestrian travel-ways and traffic control, are provided to identify and reconcile constraints as- sociate with the project. All work phases identified with the project delivery schedule are reconciled with said plans, providing an integrated and holistic project delivery concept tied to the GMP estimate. Existing site conditions in photo format are provided as a supplement to the design documents, and were utilized to validate assumptions and overall design intent. A Project Management Plan is also provided highlighting how the project is intended to be managed through the remaining project delivery phases. The documents and information included herein are proprietary and confi- dential to McAlvain Construction, Inc., and Capitol City Development Cor- poration (CCDC), and are not intended for the use of others. Duplication or redistribution without the express written permission of its authors is prohibited. TABLE OF CONTENTS 1| CONSTRUCTION DOCUMENTS (GMP) ESTIMATE & QUALIFICATIONS a| Assumptions and Clarifications b| Estimate c| Alternates/Rough Order of Magnitude (ROM) Budget Pricing d| General Conditions 2| CONSTRUCTION DOCUMENTS (GMP) BASELINE PROJECT SCHEDULE 3| QUALITY ASSURANCE AND CONSTRUCTABILITY REVIEW a| Existing Conditions Photos 4| SITE LOGISTICS PLANS a| Site Logistics Plan b| Site Signage Plan c| Traffic Control Plan d| Pedestrian Flow Plan 5| PROJECT MANAGEMENT PLAN a| Project Management Plan b| Appendix A - Work Breakdown Structure (WBS)
  • 4. 1| CONSTRUCTION DOCUMENTS (GMP) ESTIMATE & QUALIFICATIONS a| Assumptions and Clarifications b| Estimate c| Alternates/Rough Order of Magnitude (ROM) Budget Pricing d| General Conditions
  • 5. 2| CONSTRUCTION DOCUMENTS (GMP) BASELINE PROJECT SCHEDULE
  • 6. 3| QUALITY ASSURANCE AND CONSTRUCTABILITY REVIEW a| Existing Conditions Photos
  • 7. 4| SITE LOGISTICS PLANS a| Site Logistics b| Site Signage Plan c| Traffic Control Plan d| Pedestrian Flow Plan
  • 8. 5| PROJECT MANAGEMENT PLAN a| Project Management Plan b| Appendix A - Work Breakdown Structure (WBS)