Shell ONEgasShutdown Management ProcessChallenges of deliveringshutdowns on Shell’s SouthernNorth Sea Assets              ...
Contents: The ONEgas Asset Integrated Activity Planning Shutdown Management  Process  Application   (scaling)  Timing ...
What is ONEgas?  ONEgas – Asset name created as a result of combining the management of the UK  Southern North Sea assets ...
What is ONEgas 2011                              ~12 Bcm gas prod. (+   Opex / Abex ~$950 mln    ~ 50 Shell Staff         ...
The ONEgas Assets             90 Producing Fields, 54 Installations, 350                   Wells, 1200+ km’s Pipelines    ...
Upcoming SlideShare
Loading in …5
×

Presentation: Challenges of delivering shutdowns on Shell’s Southern North Sea Assets - Haije Stigter, SHELL

2,546 views

Published on

For the complete presentation, please download it at http://bit.ly/OzIFp1. Alternatively, please visit http://www.shutdownsandturnarounds.us/Share

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
2,546
On SlideShare
0
From Embeds
0
Number of Embeds
29
Actions
Shares
0
Downloads
24
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Presentation: Challenges of delivering shutdowns on Shell’s Southern North Sea Assets - Haije Stigter, SHELL

  1. 1. Shell ONEgasShutdown Management ProcessChallenges of deliveringshutdowns on Shell’s SouthernNorth Sea Assets 1
  2. 2. Contents: The ONEgas Asset Integrated Activity Planning Shutdown Management  Process  Application (scaling)  Timing  Governance Materials Results 2
  3. 3. What is ONEgas? ONEgas – Asset name created as a result of combining the management of the UK Southern North Sea assets owned by Shell UK Exploration & Production & the Southern North Sea assets from NAM (Offshore, NAM, Shell Expro, gas) ONEgas Facilities and Pipelines A6 / e Tyra Pipelin B4 Pip elin e 20" 100 km 26" e klin trun F3-FB km 34" (Gaz de France - Suez) 470 Cutter QC D15-FA-1 (Gaz de France) 2" Carrack West "/ 16 (2009) e Carrack Seal Pipelin QA SHAMROCK OW BRIST " 24 km 7 10 CARAVEL CLEAVER BANK L5-FA-1 L2-FA-1 BR HIGH Markham (Gaz de France - Suez) BRIGANTINE (CH4) F15 K5 -P (TotalFinaElf) BG (TotalFinaElf) OW BRIST 20" m M 5.4k K7-FA-1 K8-FA-3 PB Barque AQ/AC/AT (Perenco) 12 m 3. K7-FB " 4k PL Barque M7 12" PG (Cirrus) Galleon K8-FA-1 20" JP K7-FD-1 L9-FF-1 PN 3.7km 2" Gly and col PC 14" Galleon 12" km 24" JD 4" Clipper 9.2 K8-FA-1AP 15.5 12/1 23 km km INDEFATIGABLE K8-FA-2 16" Glycol 12/14" and 2" FIELD 12" L9-FA-1 12 km PW 16" Clipper km 10" 3.3 10" L9-FB-1 Skiff NG PM 12" T col 11km Gly PT Clipper Ext 3" 36 and Clipper PR N 15 " en 9 " ine Clipper 10 km km nkl sion tru m K 73k 2.5 35 " m 24" 30 .8k SOLE PIT L 20" Corvette K12-BD 36.5km (Gaz de France) LEMAN C G COMPLEX Indefatigable Export to Perenco Bacton L10-A CP North (Gaz de France) 14" km CD K14-FA-1P/1C F 2.7 K13-A AK LEMAN FIELD (Wintershall) 20 K15-FB-1 4.7 " km SEAN FIELD 20" 4.7km K15-FG-1 RD PD LEMAN A 24 " COMPLEX AD2 2.1 km LEMAN B South NGT Pipe COMPLEX PP line 8" L13-FC-1 30" km BP and 2.2 4" BT 30" K15-FA-1 36" AD1 AP Leman Bacton (4" Export to mo 7.6km (mothballed) 178 km 3.5 thb L15-FA-1 km alle d) 24" " K14-FB-1 11" (Gaz de France - Suez) 10 L13-FE-1 e 4"(m 0.7km lin " 30 othb m BT pe alle 7k d) 10 T Pi BH (Perenco) BD GA 10 " 6" AWG-1 d) 6.8 " AME-2 NO lle 10 " oth ba L13-FD-1 10 " " (m 20" km 30 K15-FC-1 16"/2" 3.0 ne m d 4" ali .8k 36" " an 2 Se 57 L13-FH 30 No 130 ne km ali m 1 Se .7k 8.1km 55 K15-FK E 24" No N-7 24" ton e WG in 85 km T Pip Bac el elin Pip man t to e Le xpor n Local AME-1 Sea E BRIST K17-FA-1 OW Pipelin e D BBL line Shell Bacton Gas Plant Den Helder Q16 Assen Please note that the situation as shown is not geographical correct ! EP200810214239001 December 2008 02 March 2012 3 3
  4. 4. What is ONEgas 2011 ~12 Bcm gas prod. (+ Opex / Abex ~$950 mln ~ 50 Shell Staff NGL) Capex / Expex ~$550 mln ~50 Contractors (75 mln boe) ~90 producing fields 7% of the total UK >50 platforms 2 onshore plants and 9% NL production 2 drilling rigs 8 production ~90 Bcm Exp Reserves (Dev 7 helicopters (209) systems & Undev) 4 to 5 helicopters (201) 15 sales contracts ~50 Bcm SFR fleet of boats 4
  5. 5. The ONEgas Assets 90 Producing Fields, 54 Installations, 350 Wells, 1200+ km’s Pipelines Footer: Title may be placed here or disclaimer if 5 required. May sit up to two lines in depth.

×