Page 89, which appears on page 103 in Acrobat, of the MDOT Environmental Assessment of the US-23 Corridor Improvement Plan. It shows the estimated cost of replacing three bridges over US-23, (Territorial Road, Six Mile Road, and Eight Mile Road) as $14 Million.

Published in: Government & Nonprofit
  • Be the first to comment

  • Be the first to like this

Mdot ea project_costs_p103

  1. 1.   89    8.0 PROJECT COSTS The following are the US‐23 Improvements preliminary engineering and construction costs  projected in fiscal year 2016 funds:  Active Traffic Management (ATM), M‐14/US‐23 to south of M‐36:  .......................... $29,540,000   Intelligent Transportation System (ITS), M‐14/US‐23 to south of M‐36:  ................... $14,000,000   Bridge replacements at 6 Mile, 8 Mile and N. Territorial Roads:  ............................... $14,017,000  Bridge replacements of US‐23 bridge over the railroad: ................................................ $4,639,047  Widening of US‐23 bridge over Barker Road:  .................................................................... $639,483  Northbound and southbound on‐ramp extensions:  ...................................................... $6,305,000   US‐23 CPM, M‐14/US‐23 to Silver Lake Road:  ................................................................ $6,440,000   CPM on the Joy Road and Warren Road bridges:  ............................................................. $602,000    

×