2. ABOUTBHEL
ABOUT BHEL
• BHEL- BHARAT HEAVY ELECTRICALS LIMITED
• BHEL is the largest engineering and manufacturing
enterprise in India.
• Type: PSU, Maharatna Company
• Industry: Electrical equipments
• Founded: 1964
• Founder: Government of India
• Headquarters: New Delhi, India
• Key people: B Prasad Rao, (Chairman & MD)
• Products: Gas and Steam Turbines, Boilers, Electric Motors,
Generators, Heat Exchangers. 1/11/20162
8. • Started in 1960s with the help of Russia.
• BHEL, Ranipur has two plants:
• HEEP: Heavy Electrical Equipment Plant.
• CFFP: Central Foundry Forge Plant.
• Spread in about 5000 Acres.
BHEL, RANIPUR
1/11/20168
10. • A steam turbine works on the principle
of conversion of High pressure & temperature steam into high Kinetic
energy, thereby giving torque to a moving rotor.
STEAM TURBINE
1/11/201610
14. I.P Turbine have more pressure than L.P Turbine but less than H.P
Turbine.
Specifications of I.P Turbine:
• Length- 4425 mm
• Width- 5000 mm
• Height- 4800 mm
• Steam pressure- 41 Kg/cm
• Steam temperature- 537˚C
1/11/201614
2. I.P TURBINE-
15. The size of blades of I.P steam turbine is larger than H.P steam turbine,
but smaller than L.P steam turbine.
1/11/201615
I.P Turbine Blades:
16. Specification of LP Turbine(500 MW):
• Main Steam Temp- 320˚C
• Main steam pressure- 8 kg/cm2
• Reheat steam temp- 320˚C
• Length of Rotor - 8.71m
• Height -10.7m
• Weight-345000kg.
1/11/201616
3. L.P TURBINE-
17. The blades of I.P turbine are made up of Titanium alloys which offer
high strength to bear the steam temperature.
1/11/201617
L.P Turbine Blades:
18. Vocational Training gives the idea of general
awareness in steam turbine manufacturing, & its
process. Its provides practical idea to manufacturing
several components of turbine.
1/11/201618
CONCLUSION