Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Pre Engineered Building and Structure By Delta Infrastructures

25 views

Published on

(http://www.deltainfrastructures.in) We are highly popular organization passionately engrossed in the Manufacturing the broad collection of Steel Structures, Industrial Roofing Shed and MS Portable Cabins. And also providing Steel Fabrication Services.

Published in: Business
  • Be the first to comment

  • Be the first to like this

Pre Engineered Building and Structure By Delta Infrastructures

  1. 1. PRE- ENGINEERED BUILDINGS
  2. 2. About Delta  Established in 2007  Provides Customer’s Preferred Choice for PEB & Heavy Structural Buildings  Manufacturing Facilities at Kadapa and Maheswaram in Andhra Pradesh.  Production capacity of PEB- 30,000 MT per annum  Production capacity of Heavy Structural Fabrication- 24,000 MT per annum(scaled to 40,000 MT)  Completed more than 300 Projects
  3. 3. Why Delta  Economical prices  Use of quality materials  High end skillful professionals  In Perfection with working standards  Use of effective technology
  4. 4. Major CLIENTS  IVRCL INFRA  OCTAMEC  GMR AIRPORT  MEGHA INFRA  BHARATI POLYMERS  PHEONIX INFO CITY  KCP PROJECTS  SRI CITY  VVC MOTORS  NSL  NOVA CARBONS  JYOTHI DAIRY  VA TECH WABAGE  GENESIS  SRI BIOTECH  ROHINI SEEDS  SINDHU CARGO  RAIN CII  LEINTZ PHARMA  HES INFRA  YUVARAJ POWER PROJECTS  SHAPES INFRA(INTERNATIONAL CLIENT)  UMANG ASSOCIATES
  5. 5. Delta peb as  Warehouses/ Cold storages  Factories/ site offices  Commercial complexes  Offices/ schools  Parking solutions  Aircraft hangers  Automobile showrooms  Shopping malls  Dairy farms  Railway stations  Sports complexes  Incubation centers
  6. 6. 6 ERECTION @ delta  1. NEVER BEGIN ERECTION WITHOUT? “FOR CONSTRUCTION” DRAWINGS TEMPORARY BRACING AND A PLAN VP ERECTION GUIDES INVENTORY  2. ALWAYS COMPARE ID STICKERS WITH METAL TAGS ON FRAMES. TAG IS GOOD.  3. NEVER MAKE ANY MODIFICATIONS WITHOUT VP APPROVAL.  4. ALWAYS CHECK ANCHOR BOLTS.  5. INDEX LABEL PAGES OF PLANS FOR QUICK REFERENCE.  6. ERECT BRACE BAY FIRST.  7. ALWAYS INSTALL BRACING AND SECONDARY AS YOU PROCEED.  8. NEVER USE ROD BRACING TO MOVE FRAMES.  9. LEAVE TEMPORARY BRACING INSTALLED UNTIL COMPLETED.  10. INSTALL EVERYTHING YOU CAN ON THE GROUND.  11. ALWAYS REFERENCE THE VP SEDS FOR PROPER
  7. 7. PEB Vs CONVENTIONAL
  8. 8. Projects

×