Boi, Dell'Orto, Raffaldi & Trombetti - input2012

344 views

Published on

Enrico Boi, Chiara Dell’Orto, Marco Raffaldi, Paolo Trombetti
on "Finding the right approach for a national underground infrastructure register"

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
344
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Boi, Dell'Orto, Raffaldi & Trombetti - input2012

  1. 1. UNDERGROUND INFRASTRUCTURE REGISTER The register as an instrument of knowledge: • Supporting decision makers in both design and investment choices to optimize the use of resources • Making more effective interventions in case of failure, and to ensure greater security of networks and systems • Making it easier to design renovations of a network or its expansion • Identifying existing usable infrastructure in order to reuse them •Facilitating access to information on networks layout in order to avoid interference construction
  2. 2. FINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  3. 3. FINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  4. 4. THE PILOT PROJECT “Progettazione Partecipata dei Sottoservizi nei Territori dei Comuni di Milano, Rho, Pero e Comune Arese Arese - 2010-2012” Key elements: • Mapping networks of existing shared Comune Pero standards; • Testing georadar available technologies and prototypes Purpose: to allow the government to define Comune Rho best targets, priorities and policies for optimal planning of underground infrastructure.FINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  5. 5. PROJECT STRUCTURE Evaluation of feasibility - Evaluation of costs - Model testingMapping the pilot area: Cost evaluation in relation to: Define a management-design solution: •Different mapping methods: •Regional level: management of•Acquiring of utility database a public portal containing all•Instrumental surveys Digital Slit trenches the regional common dataset•Processing of all different GPR standard •Local authorities: datadataset GPR 3D complex interchange infrastructure for•Mashing of the geodatabase •Data processing sharing information between•Data representation •Data mashing utility company and authorities•Webgis portal •2d-3d webgis •Adoption of common database tablesFINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  6. 6. A PILOT PROJECT FOR MILANO, RHO, PERO, ARESE Rho Arese Pero MilanoProject area: 48.166.242 mq Population in the area: 168.966 abitantiArea occupied by utilities: 2.423.212 mq Index for utility crowding on the area = 5%Networks: water, electricity, centralised heating, sewage, storm water, gas, TLC, public lightningUtility companies: ENEL, Colt, Ianomi, Metroweb, Telecom, Fastweb, Wind, Terna, A2A, Snam, MMFINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  7. 7. A PILOT PROJECT FOR MILANO, RHO, PERO, ARESE Key element of the projects is the practical aproach, with 228.000 sqm of GPR mapping sutes distributed within the 4 municipalities Aree comunali interessate dal progetto Comune di Arese (m2) 485,222.00 Comune di Pero (m2) 380,955.00 Comune di Rho (m2) 542,740.00 Comune di Milano (m2) 1,014,295.00 Totale aree comunali (m2) 2,423,212.00FINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  8. 8. DATA ACQUISITION Historical database GPR and moreFINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  9. 9. DATA MASHINGFINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  10. 10. TEST SITE SURVEYFINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  11. 11. PLAN POSITION ACCURACY 35% is the estimate discrepancy between historical and instrumental datasetFINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  12. 12. DATA LAYOUT: 2D WEBGIS PORTALFINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  13. 13. DATA LAYOUT: 3D WEBGIS PORTALFINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER
  14. 14. FINDING THE RIGHT APPROACH FOR A NATIONAL UNDERGROUND INFRASTRUCTURE REGISTER

×