IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

3,766 views

Published on

http://ibm.com/interconnect

Published in: Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
3,766
On SlideShare
0
From Embeds
0
Number of Embeds
2,925
Actions
Shares
0
Downloads
23
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

  1. 1. PT. Steel Pipe Industry of Indonesia Tbk (SPINDO) The Hanny Purnomo © 2013 IBM Corporation
  2. 2. #IBMINTERCONNECT Company Profile
  3. 3. #IBMINTERCONNECT Company Profile Jakarta Representative Office Head Office Plant I Plant II Plant IIIPlant VI Plant IV Plant V Plant VII
  4. 4. #IBMINTERCONNECT Company Profile PT. Steel Pipe Industry of Indonesia Tbk (SPINDO).  established in 1971.  the biggest production volume in Indonesia & ASEAN.  the widest product size range in Indonesia & ASEAN.  Feb.2013, listed in Indonesia Stock Exchange (ISSP.JK).  sales projection in 2013  USD 340 mio.
  5. 5. #IBMINTERCONNECT Challenges SAP ERP servers.  since 2005.  located in Head Office. Objectives.  serve users: nearly 24x7.  unplanned down time: 0%. Problems.  availability: slow recovery.  performance: slow.  EOSL dates: varied widely.  technology gap.  space consumption: high.
  6. 6. #IBMINTERCONNECT Solution IBM PureFlex System with Power.  SAPS#.  IOPS.  hardware integration.  hardware virtualization.  resource management.  database compression.
  7. 7. #IBMINTERCONNECT Implementation December 2012.  hardware.  current capacity is fit for 3 years (2013-2015).  expandable for more than 7 years (2013-2019 ).  7 years of maintenance agreement (2013-2019). March 2013.  migration of 8 years of live data (2005-2013).
  8. 8. #IBMINTERCONNECT Results March 2013.  processing time for data reporting: up to 7.9 times faster.  time for backup: 3.7 times faster.  total database size: cut by 36%.  energy consumption: cut by 40 percent.  space: reduced by more than 50%.
  9. 9. #IBMINTERCONNECT Why choose IBM? Principal IBM Principal (Local Support) IBM Indonesia - Geo Expansion - Surabaya Branch Distributor BPT (Blue Power Technology) Business Partner WCS (Wahana Cipta Sinatria) Surabaya Branch Support Team IBM-STG, IBM-SWG, IBM- GBS End User SPINDO (PT. Steel Pipe Industry of Indonesia Tbk)

×