IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & Wieck

4,189 views

Published on

http://ibm.com/interconnect

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
4,189
On SlideShare
0
From Embeds
0
Number of Embeds
2,977
Actions
Shares
0
Downloads
202
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

IBM InterConnect 2013 Expert Integrated Systems Keynote: Sotiropoulos & Wieck

  1. 1. Simplify and Accelerate Cloud and Big Data with Expert Integrated Systems Andrew Sotiropoulos General Manager PureFlex Systems © 2013 IBM Corporation
  2. 2. #IBMINTERCONNECT Market Shifts Are Driving IT Imperatives IT economics is driving integrated systems Mobile, social, big data & analytics are redefining client engagement Cloud is the new delivery model IMPROVE IT EFFICIENCY by simplifying the IT lifecycle ACCELERATE new applications, big data and analytics SIMPLIFY CLOUD application platforms and infrastructure
  3. 3. #IBMINTERCONNECT The Problem: The Time and Effort Spent on Deploying an IT Project Top Causes of Project Delays Hardware  Troubleshooting and tuning production environment  Integration, configuration and testing of the infrastructure  Installation, cabling and network access for the environment Software  Integration, configuration and testing of applications  Integration, configuration and testing of middleware  Configuration, build and deployment of applications 45% 45% 29% 41% 35% 34% PHASE TIME (DAYS) BUDGET Specify/design 73 - 96 14% - 16% Procure 57 - 112 19% - 21% Implement 74 – 93 12% Configure/test 74 – 80 10% - 11% Cluster & HA 66 – 104 11% - 12% Backup 44 – 108 10% Tune 89 – 98 9% - 10% Management 67 – 110 9 – 10% Typical IT Project Time and Budget From a commissioned study conducted by Forrester Consulting on behalf of IBM Design/Deploy Manage/Maintain
  4. 4. #IBMINTERCONNECT You Can Fundamentally Change the Economics and Experience of IT Systems with integrated expertise and built for cloud Deeply integrating and tuning hardware and software Capturing and automating what experts do Making every part of the IT lifecycle easier Integration by DesignBuilt-in Expertise Simplified Experience
  5. 5. #IBMINTERCONNECT Cloud Applications  BPM  SAP  DevOps  Etc…  Mobile  Social  Analytics  Commerce  SaaS/BPaaS  PaaS  IaaS Big Data  Transactions  Data Warehouse  Operational  Exploration IT Efficiency  Consolidation  VDI  High availability  Performance Optimized to Accelerate and Simplify Business Priorities Technology Building Blocks Advanced Blade Technology
  6. 6. #IBMINTERCONNECT Compute  Multi architecture: POWER & x86  Flexible choice of nodes to meet workload requirements Chassis / Networking  Highest performance I/O - 40Gb Ethernet, 16Gb SAN, 56Gb Infiniband FDR  Designed for multiple generations of technology for investment protection Storage  Optimize data between Flash and HDDs with tiering  Connect to or virtualize existing storage Management  Single point of management control for all resources  Reduce complexity by automating everyday management tasks The building blocks for PureSystems 7 Architectures Hypervisors Operating Systems Advanced Blade Technology
  7. 7. #IBMINTERCONNECT PureFlex System: Infrastructure for Cloud and IT Efficiency Scalable Storage with Seamless Integration Enhanced Virtualization and Efficient Resource Pooling Single Point Management System IT Scalability and Leading VM Density High Performance Networking  PureFlex Express  PureFlex Enterprise  Additional solutions for cloud, Microsoft and IBM i
  8. 8. #IBMINTERCONNECT 0144: Simplify cloud deployments with the IBM PureSystems family Simplify Cloud Deployments WHEN: Today at 2:00 PM WHERE: Roselle (4611) Rapidly and efficiently entered cloud services market with single point of support Cut time to provision new environments by 30% SEE THIS SESSION
  9. 9. Simplify and Accelerate Cloud and Big Data with Expert Integrated Systems © 2013 IBM Corporation Marie Wieck General Manager Application and Integration Middleware
  10. 10. #IBMINTERCONNECT Achieving a new level of application efficiency 14 non-IBM apps efficiently migrated onto WAS v8.5 75 minutes to create a production-ready BPM 8.0 environment Simultaneously tested deployment of 9 patterns Large Global Financial Provider
  11. 11. #IBMINTERCONNECT PureApplication System: Revolutionary Deployment and Management of Applications Accelerate new project delivery & simplify application lifecycle using Patterns of Expertise  New applications up and running an order of magnitude faster  System management, maintenance and upgrades automated and without downtime  Scaling policies, security and disaster recovery setup and applied with just a few clicks  Up to 6.5x better performance for web and database workloads System “mini” Power model Based on IBM internal tests of the IBM PureApplication System W1700-96 compared to results of testing of a competitor’s configuration (previous version; no longer available; executing an online JEE trading application workload in a controlled laboratory environment and a 3 year total cost of acquisition (based on US list prices). The cost calculation compares the average cost per request. 3 year total cost of acquisition includes expected hardware, software, service & support. IBM's internal workload studies are not benchmark applications, nor are they based on any benchmark standard. As such, customer applications, differences in the stack deployed, and other systems variations or testing conditions may produce different results and may vary based on actual configuration, applications, specific queries and other variables in a production environment. Users of this document should verify the applicable data for their specific environment.
  12. 12. #IBMINTERCONNECT Partners * * We’re Partnering across Key Industries to Bring Critical Applications onto PureSystems Big Data Data Management Business Analytics & Data Warehousing Information Integration & Governance Mobile Mobile Development and Connectivity Social Collaboration Web Experience  SAP Business Suite  Smarter Process  DB2 with BLU Acceleration Banking Energy & Utilities Insurance Government Retail Telecom Financial Markets Healthcare Consumer Products
  13. 13. #IBMINTERCONNECT Coming Soon! IBM Business Intelligence Pattern with BLU Acceleration Self-service, self-optimizing Business Intelligence • FAST in-memory acceleration • RICH performance optimization and visibility • SIMPLE to deploy and manage Accelerated OLAP Pre-configured deployment for predictable, high performance analytics solution delivery
  14. 14. #IBMINTERCONNECT Example: IBM PureApplication System savings across the IT lifecycle Deployment • Fully assembled and configured • Pre-installed management software • Fast pattern-based deployment Incident/capacity management • Centrally monitor and resolve issues • Automatic scaling Asset management • Track license usage of products Security management • Centralized access control Change management • Visibility into relationships of virtual images in a workload • Automatically apply changes to desired virtual servers 9612 hrs 2302 hrs 0 10000 5000 Do It Yourself PureApplication System Labor Hours Spent* 76%Savings *Note: Do It yourself used 9 blades (144 cores). IBM PureApplication System used 3 nodes (96 cores). Each system has the capacity to run 72 workloads where each workload can sustain a peak throughput of 1720 page elements per second.
  15. 15. #IBMINTERCONNECT 9612 hrs 2302 hrs 0 10000 5000 Do It Yourself PureApplication System Labor Hours Spent* 76%Savings IBM PureApplication System beats the competition *Note: Do It yourself used 9 blades (144 cores). IBM PureApplication System used 3 nodes (96 cores). Each system has the capacity to run 72 workloads where each workload can sustain a peak throughput of 1720 page elements per second. 5815 hrs 153%More 4843 hrs 110%More Pre-integrated Competitor Coalition Competitor Deployment Change Management Security Management Asset Management Incident/capacity Mgmt
  16. 16. #IBMINTERCONNECT SEE THIS SESSION 500% increase in email open rates 1000% increase in conversion rate Accelerate Big Data & Analytics 0149: Accelerate big data and analytics with the IBM PureSystems family WHEN: Today at 3:00 PM WHERE: Simpor (4811) Drastically reduces the data extraction workload
  17. 17. #IBMINTERCONNECT  PureData System for Hadoop  PureData System for Analytics New smaller capacity PureData System: Optimized for Big Data and Analytics  Completely integrated  Appliance simplicity  Fast time-to-value for Transactions High availability transactions (OLTP) for Analytics High-speed, peta-scale analytics for Operational Analytics Real-time, high-throughput analytics for Hadoop Exploratory analysis & queryable archive MODELS OPTIMIZED FOR PURPOSE
  18. 18. #IBMINTERCONNECT PureSystems simplify each phase of the systems lifecycle reducing time, cost and risk Phase Time (days) Specify/design 73 - 96 Procure 57 - 112 Implement 74 – 93 Configure/test 74 – 80 Cluster & HA 66 – 104 Backup 44 – 108 Tune 89 – 98 Management 67 – 110 Typical IT Project Time and Budget From a commissioned study conducted by Forrester Consulting on behalf of IBM  Pre-integrated, pre-tested, ready to run  Up and running in hours  Rapid application and data deployment  Rapid dev/test environment replication  Dynamic scaling  Automatic failover and high availability  Fully integrated management  Single support number  System level updates and upgrades  Simplified problem determination From…. To.…
  19. 19. #IBMINTERCONNECT The PureSystems Family Can Make a Difference in Transforming Your Business IMPROVE IT EFFICIENCY by simplifying the IT lifecycle ACCELERATE new applications, big data and analytics SIMPLIFY CLOUD application platforms and infrastructure  Deploy a web application in under 15 minutes1  Application time to market has decreased by as much as 67%4  Setup times 33% less than traditional approaches2  Deploy services in minutes or hours rather than days or weeks4  Reduce management time across the IT lifecycle by up to 75%3  57% lower operating expenses4 1Based upon testing of the IBM PureApplication System W1500-192 and W1700-608 deploying a single Virtual Application Pattern consisting of 2 WAS VMs, a DB2 VM, and updating the Elastic Load Balancer (ELB). The WAS VMs were allocated 4 vCPUs, 4 GB of memory and 12 GB of disk while the DB2 VM was allocated 8 vCPUs, 6 GB of memory and two virtual disks of 12 GB and 4 GB. 2Based upon testing of the IBM PureApplication System W1500-96 and W1700-608 with time measured from powering on the system to when it is ready to support application deployments 3IBM Competitive Project Office analysis of PureApplication System versus do-it-yourself (DIY) approach. DIY used nine blades (144 cores). IBM PureApplication System used three nodes (96 cores). Each system has the capacity to run 72 workloads, where each workload can sustain a peak throughput of 1,720 page elements per second 4Real customer results documented and published by IDC
  20. 20. #IBMINTERCONNECT Take Advantage of Opportunities to Learn More ibm.com/puresystems youtube.com/user/expertintegratedsys/featured Solution Center PureSystems Sessions Expert Integrated Systems Zone Business Best Practice Solution Sessions 144: Simplify Cloud Deployments 149: Accelerate Big Data & Analytics Technology Roadmaps Solution Sessions 173: IBM PureFlex System and IBM Flex System 174: IBM PureApplication System 175: IBM PureData System for Transactions 176: IBM PureData Systems
  21. 21. #IBMINTERCONNECT © 2013 IBM Corporation Thank You

×