Evaluation Surveys   Survey Monkey   WPC Website   Community events   Customer Service UnitOnly Rain Down the Storm Dr...
Know your stuff!     Regulation changes, trends, happeningsDon’t reinvent the wheel     What resources are available for...
            
            
                
        
        
            
                        
            
                

Field Trips:Board on the 1st floor, West Superior Ave entrance            (bottom of Grand Staircase)                Troll...
Spread the word!            Wireless password:                HOW12           Conference website:   Conference.healthylake...
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Towards a Complete and Green Cleveland-Mazzei, 2012
Upcoming SlideShare
Loading in …5
×

Towards a Complete and Green Cleveland-Mazzei, 2012

247 views

Published on

To restore Lake Erie to full health, we must reduce the amount of stormwater runoff it absorbs. Fortunately, green infrastructure can provide relatively low-cost solutions that contribute to this restoration. This workshop explores green infrastructure policies, programs, and projects in the City of Cleveland, leading to more effective stormwater management.

Published in: News & Politics
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
247
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • The design provided storm water storage volume for up to a 50 year, 25 hr storm event. A storm event greater than 50 yrs will overflow into the existing catch basins.
  • UNDER DRAIN: The pipe was sized to limit storm water outflow into the combined sewer system at a maximum 10 year, 24 hour rain event. This helps ( in a small way ) to limit the overflows of the combined sewers into local streams and rivers by reducing the volume in these sewers.TREES:WPC transplanted 4 trees and left 1 in place. The contractor adjusted the design of the rain garden around the existing tree.
  • “A” is on the left with downspout shown in smaller picture“B” is on the right
  • Pump: Performance = 3,500 rpm, Capacity = 35 gpm, Head = 85.5 ftHydro-pneumatic tanks: 800 gallons, 5’ diameter
  • Towards a Complete and Green Cleveland-Mazzei, 2012

    1. 1.          
    2. 2.  
    3. 3. 
    4. 4.      
    5. 5. 
    6. 6.     
    7. 7. Evaluation Surveys  Survey Monkey  WPC Website  Community events  Customer Service UnitOnly Rain Down the Storm Drain  Household Hazardous Waste Disposal – June 2012
    8. 8. Know your stuff!  Regulation changes, trends, happeningsDon’t reinvent the wheel  What resources are available for use?Make every dollar and opportunity count  Frank’s Red Hot Sauce - Put it on everything!Partnership! Partnership! Partnership!  How can we make it a win - win?
    9. 9.    
    10. 10.    
    11. 11.     
    12. 12.   
    13. 13.   
    14. 14.    
    15. 15.       
    16. 16.    
    17. 17.     
    18. 18. 
    19. 19. Field Trips:Board on the 1st floor, West Superior Ave entrance (bottom of Grand Staircase) Trolleys board 2:30 Joint Reception: trolleys begin departing at 5:45
    20. 20. Spread the word! Wireless password: HOW12 Conference website: Conference.healthylakes.orgEmail us photos, comments, tweets or video: healthylakes@gmail.com On Twitter? Use the hashtag: #healthylakes

    ×