TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff
SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt
dduurriinngg tthhee yyeeaarr 22001122--1133..
((PPaarrtt --11))
GGuujjaarraatt EEnneerrggyy DDeevveellooppmmeenntt AAggeennccyy
4th Floor, Block No.11 and 12, Udyog Bhavan, Sector - 11
Gandhinagar – 382 017, Gujarat, India
Phone : +91 79 23257251/2/3/4
Fax: +91 79 23257255, 23247097
(Sign and Seal of the bidder)
Page 2 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
TABLE OF CONTENTS- for Part 1 of the tender
E- TENDER NOTICE..................................................................................................................................3
1.0 e Tendering (Online Tendering) Instruction to Bidders..................................................................4
2.0 CHECK LIST........................................................................................................................................6
Annexure 1: GENERAL INFORMATION ABOUT THE BIDDER................................................................7
3.0 INSTRUCTIONS TO THE BIDDER.....................................................................................................9
4.0 GENERAL TERMS AND CONDITIONS.............................................................................................11
5.0 GUIDELINES and ELIGIBILITY CRITERIA FOR BIDDERS...................................................................14
6.0 TENDER EVALUATION CRITERIA ....................................................................................................18
Annexure 2: Details of similar work experience in last three years ..................................................19
Annexure 3: Details of Technical staff available with the company for execution of work ...........20
Annexure 4: DECLARATION..................................................................................................................21
Annexure 5: DEVIATION SHEET............................................................................................................22
Annexure 6:List of Plant and Machinery.............................................................................................25
(Sign and Seal of the bidder)
Page 3 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
Gujarat Energy Development Agency
4th
floor, Block No. 11 and 12, Sector - 11
Gandhinagar – 382 017, Gujarat, India
Phone:+91 79 23257251/2/3/4, Fax: +91 79 23257255
URL:http://www.geda.gujarat.gov.in/
TENDER NO. : GEDA/SPV/2012-13/03
E- TENDER NOTICE
Gujarat Energy Development Agency invites sealed offers for Installation of Solar Photovoltaic
Systems in the State of Gujarat during the year 2012-13.Tender Document can be downloaded from
the Agencies website https://geda.nprocure.com or www.nprocure.com.
Interested parties are required to fill in the requisite details and submit their Technical Bid and
Financial Bids along with a non-refundable Tender Fee of Rs.15, 000/- and an EMD of Rs.5, 00,000/-
in the form of Demand Draft drawn on any Nationalized Bank, ICICI Bank, IDBI Bank, AXIS Bank, HDFC
Bank, Kotak Mahindra Bank, Yes Bank, IndusInd Bank , Saurastra Gramin Bank, Baroda Gujarat
Gramin Bank, Dena Gujarat Gramin Bank, The Kalupur Commercial Co-operative Bank Ltd. , Rajkot
Nagrik Sahakari Bank Ltd. , The Ahmedabad Mercantile Co-operative Bank Ltd., The Mehsana Urban
Co-operative Bank Ltd. separately in favor of Gujarat Energy Development Agency payable at
Gandhinagar.
The Tender schedule is as follows:
Director, GEDA reserves the right to reject any/all offers without assigning any reasons thereof.
Director
Gujarat Energy Development Agency, Gandhinagar
Sr.
No.
Tender Schedule Date Time
1. Online Downloading Start Date 14.09.2012 12 p.m.
2. Online Downloading End Date 12.10.2012 12 p.m.
3. Last Date of Physical Submission in GEDA Office 12.10.2012 3 p.m.
4. Bid Opening in GEDA Office 12.10.2012 3.30 p.m.
(Sign and Seal of the bidder)
Page 4 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
1.0 e Tendering (Online Tendering) Instruction to Bidders
1. Down loading of Tender Documents
1.1. Bid document will be available on web site up to date shown in the tender
advertisement.
1.2. Bidders wishes to participate in this tender will have get them self registered on web
site www.nprocure.com or https://geda.nprocure.com
2. Digital Certificate
2.1. Bidders who wish to participate in on line tenders will have to procure / should have
legally valid digital Certificate as per Information Technology act 2000 using which
they can sign their electronic bids.
Bidders can procure the same from any of the license certifying Authority of India or
can contact (n) code solutions- a division of GNFC Ltd, who are licensed certifying
Authority by Govt. Of India
2.2. All bids should be digitally signed, for details regarding digital signature certificate
and related training involved the below mentioned address should be contacted
2.3. (n) Code Solution-A division of GNFC Ltd.,
(n) procure cell
403, GNFC Infotower, S. G. Road, Bodakdev, Ahmedabad- 380 054
Tel: +91 79 26854511/12/13 (Ext. 501,512, 516,517,525) Fax: +91 79 26857321
E-mail: nprocure@ncode.in
Toll free number: 1-800-233-1010 (Ext. 501, 512,516, 517,525)
2.4. Bidders who already have a valid Digital certificate need not procure a new digital
certificate.
3. On line Submission of Technical and Price Bid
3.1. Bidders can prepare and edit their offers number of times before tender submission
date and time. After tender submission date and time, bidder cannot edit their offer
submitted in any case. No written or online request in this regard shall be granted.
3.2. Tenderer shall submit their offer, i.e Technical bid as well as Price bid in Electronic
format on above mentioned website and date shown in the tender details after
Digitally signing the same. Physical submission of price bid will disqualify the bidder.
3.3. Offers submitted without digitally signed will not be accepted.
3.4. Offers only in physical form will not be accepted in any case.
4. Contacting Officer
4.1. Further details / clarification , if any required, will be available from Director,
GUJARAT ENERGY DEVELOPMENT AGENCY, 4th floor, Block No. 11 and 12 Udyog
Bhavan, Sector -11 Gandhinagar, Gujarat, India Phone : +91-079-23257251,
23257252, 23257253, 23257254
4.2. In case bidder needs any clarification /assistance or if training required for
participating in online tender , they can contact at following office
(Sign and Seal of the bidder)
Page 5 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
4.3. (n) Code Solution-A division of GNFC Ltd.,
(n) procure cell
403, GNFC Infotower, S. G. Road, Bodakdev, Ahmedabad- 380 054
Tel: +91 79 26854511/12/13 (Ext. 501,512, 516,517,525) Fax: +91 79 26857321
E-mail: nprocure@ncode.in
Toll free number: 1-800-233-1010 (Ext. 501, 512,516, 517,525)
5. General Instructions:
5.1. The fees for on line tender document will not be refunded under any circumstances
5.2. EMD in the form specified in tender document only shall be accepted.
5.3. Tenders without Tender document fees, earnest money deposit (EMD) and which do
not fulfils all or any of the condition or submitted in complete in any respect will be
rejected.
5.4. Tenderer approved either by the Central/ State Govt. or Central / State Govt.
undertaking is not exempted by this Agency for paying EMD , SD etc.
5.5. Conditional tender shall not be accepted.
5.6. The Internet site address for E-Tender is www.nprocure.com or
https://geda.nprocure.com
5.7. The GEDA reserves the right to reject any or all the tenders or split the work between
more than one bidders without assigning any reason thereof.
5.8. The attachments to the tender document shall be duly filed and page numbered,
with an index, specifying the document attached and its page number(s).
(Sign and Seal of the bidder)
Page 6 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
2.0 CHECK LIST
To ensure that your offer submitted to GEDA is complete in all respects, please go through the
following checklist and tick mark for the enclosures attached with your offer:
Sr.
No
Description Attached YES/ NO Page No.
1 Earnest Money Deposit in the prescribed form
2 Tender Document Fee in the prescribed form.
3 The original document duly signed and sealed on
every page, as a confirmation of acceptance of
the terms and conditions of the document.
4 A copy VAT and CST Number, Permanent Account
Number (PAN)
5 Relevant IEC certificates for SPV panels, Battery, PCU
and all the other machineries & National/NABL
accredited laboratory certificate for LED fixture issued
on or after 1st
April 2011.
6 Details of similar work done in last three years
alongwith copies of the orders and certificates from
the customers, as per the Offer Evaluation Criteria
and as per Annexure – 2 of the tender document
7 Details of Technical staff available (Brief Biodata of
key Personnel be given) as per Annexure – 3 of the
tender document
8 Name and address of dealers/ distributors/ service
stations in Gujarat along with copy of agreements.
9 Declaration of the Bidder about any relatives working
with GEDA as per Annexure – 4 of the tender
document
10 Deviation, if any, from the specifications, terms and
conditions etc. (Annexure – 5)
11 Whether validity of your offer is confirmed as per the
document
DETAILS OF EARNEST MONEY DEPOSIT ATTACHED
S.No. Description
1 Earnest Money Deposit
Earnest Money Deposit of Rs. 5,00,000/- submitted in the form of Demand Draft/ Banker’s
Cheque, drawn on______________________________________Bank,
______________________ Branch, bearing DD/BC No. _________________ dated
________________ OR Bank Gurantee No.________________dated_______is attached
herewith.
2 Tender Document Fee
Tender Document Fee of Rs. 15,000/- submitted in the form of Demand Draft/ Banker’s Cheque,
drawn on______________________________________Bank, ______________________
Branch, bearing DD/BC No. _________________ dated ____________________ is attached
herewith.
(Sign and Seal of the bidder)
Page 7 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
Annexure 1: GENERAL INFORMATION ABOUT THE BIDDER
1. Name of the Company
2. Postal Address
3. Telephone nos.
Fax no.
4. e-mail address and URL
5. Type of Company
Attach Proof of Company
Registration alongwith a copy
of the Partnership Deed/
Article of Association and
Memorandum of
Understanding
Proprietorship/ Partnership/ Private Limited/ Public
Limited
6. Name and designation of the
representative of the Bidder to
whom all reference shall be
made to expedite technical co-
ordination.
7. Entrepreneur Memorandum
Part 2 registration with DIC/
NSIC registration no./ CSPO
registration no./ DGSandD
registration no.
8. Factory Address
9. Factory Telephone/Fax no.
10. Factory e-mail address
11. Floor area of the factory
12. Manufacturing facilities
(a list of machinery be
attached as per annexure - VI)
(Sign and Seal of the bidder)
Page 8 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
13. Name and address of the
Indian/ Foreign collaborator(s),
if any.
14. Details of Technical Staff
available.
Please furnish information as
per Enclosed Annexure II.
15. Details of workmen on muster
roll Skilled/ unskilled.
(attach copy of muster roll)
16. List of components
manufactured by the company
at their factory.
SPV panel/ Electronics/ Battery
(Pl. tick appropriately)
17. List of components sourced
from outside/ other agencies.
18. Has the company/firm to pay
arrear of income tax? If yes
upto what amount.
19. Turnover of company for last 3
years 2009-10, 2010-11, 2011-
2012.
2009-10 Rs.
2010-11 Rs.
2011-12 Rs.
20. Has any Govt. Dept./ Under-
taking ever debarred the
company/ firm from executing
any work?
21. Approved MNRE Channel
Partners under JNNSM (attach
MNRE letter).
YES/ NO
It is certified that the information provided above is true to the best of my knowledge and belief.
If any information found to be concealed, suppressed or incorrect at later date, our tender shall
be liable to rejected and our company debarred from executing any business with GEDA.
Date: Sign. and Stamp of the Tenderer
(Sign and Seal of the bidder)
Page 9 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
3.0 INSTRUCTIONS TO THE BIDDER
A.1 Online offer should be submitted complete in all respects with all schedules, documents etc.
of the tender document. Physical offers shall be received in GEDA office upto the date and
time as mentioned in the tender form.
A.2 GEDA reserves the rights to reject any or all the Offers or accept any Offer in total or in part
or may divide the work among various Bidders, without assigning any reason thereof.
A.3 Tenders should be accompanied with requisite Earnest Money Deposit (EMD). Any Tender
not accompanied by Earnest Money Deposit (EMD) shall be disqualified and no further
consideration shall be given to such Tender. Tenderers may note that no relaxation in this
regard shall be made. Tenderers having valid registration of Entrepreneur Memorandum
Part 2 with DIC for the tendered item AND are having valid registration with
CSPO/NSIC/DGS & D will be exempted from depositing the EMD. NSIC/ Entrepreneur
Memorandum Part 2 registration for other than tendered item will not be taken in to
consideration and in such case; tenderer will be required to submit requisite EMD with their
tender.
A.4 Earnest Money Deposit (EMD) of unsuccessful bidders shall be returned back upon
finalization of tenders. Earnest Money Deposit of successful bidders will be retained as
Security Deposit.
A.5 If any information provided by the bidder is found to be concealed, suppressed or incorrect
at later date or during finalization of the tender or the bidder withdraws their offer during
finalization of the tender, the tender shall be liable to be rejected and company shall be
debarred from executing any business with GEDA for the period of 3 years and the EMD of
such bidder shall be forfeited.
A.6 Validity of the offer should be at least up to March 31, 2013. Without this validity the Offers
shall be rejected.
A.7 Before submission of the Offer, Bidders are required to make themselves fully conversant
with the scope of the work, technical requirements and specifications, etc., so that no
ambiguity arises on a latter date in this respect.
A.8 All information in the Offer shall be in English. Information in any other language should be
accompanied by its translation in English. Failure to comply with this may disqualify the
Bidder.
A.9 If the Bidder finds discrepancies in, or omissions from the specifications or other documents
or if he is in doubt as to their meaning, he should at once intimate GEDA and obtain
clarification in writing prior to submitting his Offer.
A.10 Any approach from the Bidder, his representative or his agent to influence the decision on
the Offer, officially or otherwise, shall render the Offer liable to be summarily rejected.
(Sign and Seal of the bidder)
Page 10 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
A.11 Physical offer should be submitted in sealed envelopes super scribed with as” Installation of
Solar Photovoltaic System in the State of Gujarat during the year 2012-13”.All the papers of
Tender documents duly signed should be submitted in the envelope. Requisite Earnest
Money Deposit and Tender Document Fee in the form of Demand Draft drawn on a
nationalized bank, ICICI Bank, IDBI Bank, AXIS Bank, HDFC Bank, Kotak Mahindra Bank, Yes
Bank, IndusInd Bank , Saurastra Gramin Bank, Baroda Gujarat Gramin Bank, Dena Gujarat
Gramin Bank, The Kalupur Commercial Co-operative Bank Ltd. , Rajkot Nagrik Sahakari Bank
Ltd. , The Ahmedabad Mercantile Co-operative Bank Ltd., The Mehsana Urban Co-operative
Bank Ltd. pledged in the name of “Gujarat Energy Development Agency”, payable at
Gandhinagar should be attached with this bid.
A.12 Erases and other changes shall be initialed by the person/persons signing the Offer.
A.13 Each page of the Offer document should be signed and stamped by the Bidder as a token of
acceptance to terms and conditions mentioned herein.
A.14 Offers of only those firms or individuals, who are either themselves technically capable and
sound for providing such services and who give satisfactory evidence of such experience
shall only be considered.
A.15 The general technical requirements mentioned are mainly for the guidance of the Bidder.
These requirements are not intended to preclude ingenuity of designs or other
improvements. If the Bidder proposes any deviation from these requirements those shall be
considered provided they are necessary either to improve the utility, performance and
efficiency or to secure over all economy. The Bidder shall give a separate list containing
points of deviations in his offer from the specifications asked for.
A.16 The Bidder shall declare the name of the employee of GEDA and his relationship with him in
case any employee of GEDA is a relative of the Bidder.
A.17 In the event, the successful Bidder fails to sign the agreement with GEDA or accept the
work order within specified time or withdraws his offer within the validity period or fails to
accept the order for any reason whatsoever, then the earnest money deposited by the
Bidder shall be forfeited by GEDA.
A.18 GEDA reserves the right to accept any offer based on its merits and GEDA is not bound to
place the order with the party having submitted the lowest offer. Thus party merely on the
ground that their financial offer is lowest, does not necessarily qualify them for receiving the
order.
A.19 Only Notarized copies of documents will be submitted in support of claims made by the
party and party shall bring the original copies of documents for verification by GEDA officials.
A.20 GEDA, at its discretion, may award the work to more than one party.
(Sign and Seal of the bidder)
Page 11 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
4.0 GENERAL TERMS AND CONDITIONS
B-1 In this deed of agreement/ Offer, unless the context otherwise requires:-
GEDA shall mean the Director or his representative of Gujarat Energy Development Agency,
with Head Office at 4th
floor, Block No. 11 and 12, Udyog Bhavan, Sector - 11, Gandhinagar –
382 017, and shall include his successors and assignees.
The Bidder shall mean the Bidder/ Associate whose Offer shall be accepted by GEDA and shall
include such Bidders/ Associate heirs, legal representatives, successors and assignees.
Associate shall mean the business associate authorized and having valid agreement with
Public Sector Enterprise having ten years experience in solar energy field with office in the
State of Gujarat. The offer shall be considered on behalf of the Public Sector Enterprise and
authority letter for submitting the tender shall be furnished. If the Public Sector Enterprise
directly participates in the tender, Associate’s offer shall not be considered.
B-2 The Bidder shall be deemed to have carefully examined all the papers, drawings, etc. attached
in the contract. If he has any doubt as to the meaning of any portion of any condition/
specification, etc. he shall before signing the contract submit the particulars thereof to GEDA
in order that such doubts are removed.
B-3 The work, shall be completed within the completion period as mentioned in the agreement,
failing which penalty at the rate of 1 % per week subject to maximum of 10 % of agreement
value shall be imposed as time is the essence of the contract. If the bidder fails to complete
the work within ten weeks after scheduled date, GEDA reserves the right to cancel the order.
This excludes delay in the completion of the work due to unforeseen reasons beyond the
control and without fault and negligence of the Bidder including (but not restricted to) act of
God or public anomie action of Government in its sovereign capacity, floods, epidemics,
strikes, lockouts, fires and accidents. In the event of any of the aforesaid contingencies GEDA
may be promptly kept informed by the Bidder by Fax/Telex/Telegram followed by
confirmation in writing with documentary proof within fifteen days of commencement and
cessation of Force Majeure circumstances. Under such circumstances reasonable extension of
time shall be granted by GEDA. Application for such extension must be made before the due
date of completion of work as per agreement. In the event of termination of the agreement,
GEDA shall be at liberty to get the remaining part of the work done through any other
agency/Bidder in the manner and on the terms it thinks proper. If the cost of executing the
work as aforesaid shall exceed the balance due to the Bidder, and the Bidder fails to make
good the deficiency, GEDA may recover it from the Bidder in any lawful manner.
B-4 The Bidder shall have to comply with all rules, regulations, laws and bylaws enforced by local
and State Govt. and also the organization in whose premises the work has to be done.
B-5 The Bidder shall not, without the consent in writing of GEDA, transfer, assign or sublet the
work under this contract or any substantial part thereof to any other party.
(Sign and Seal of the bidder)
Page 12 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
B-6 If the Bidder neglects to execute the work with due diligence and expedition or refuses or
neglect to comply with any reasonable orders within two days notice given in writing to the
Bidder and if he fails to comply with the notice, then in such a case GEDA shall be at liberty to
get the work or any part of it, executed through any other agency/Bidder in the manner and
on the terms it thinks proper. If the cost of executing the work as aforesaid shall exceed the
balance due to the Bidder, and the Bidder fails to make good the deficiency, GEDA may
recover it from the Bidder in any lawful manner.
B-7 GEDA shall have at all reasonable time access to the works being carried out by the Bidder
under this contract. All the works shall be carried out by the Bidder to the satisfaction of
GEDA.
B-8 Any question, dispute or difference whatsoever arises between GEDA and Bidder, in
connection with this agreement except as to matters, the decision for which has been
specifically provided, either party may forthwith give to the other notice in writing of
existence of such questions, dispute, difference and the same shall be referred to the sole
arbitration of a person nominated by Director GEDA. This reference shall be governed by
Indian Arbitration Act prevailing at the time of dispute and the rules made there under. The
award in such arbitration shall be final and binding on all the parties. Work under the
agreement shall continue during the arbitration proceedings unless the GEDA or the
Arbitrator directs otherwise.
B-9 GEDA may at any time by notice in writing to the Bidder either stop the work altogether or
reduce or cut it down. If the work is stopped altogether, the Bidder shall only be paid for work
done and expenses legitimately incurred by him as on preparation of the execution of the
work upto the date on which such notice is received by him. Such expenses shall be assessed
by GEDA whose decision shall be final and binding on the Bidder. If the work is cut down the
Bidder shall not be paid for the work as so cut down, but in neither case shall be paid any
compensation what so ever for the loss or profit which he might have made if he had been
allowed to complete all the work included in the contract.
B-10 Prior to dispatch, the materials may be inspected and tested by GEDA at the Bidder's works.
Bidder shall inform GEDA for such inspection at least 7 days in advance before the probable
date of dispatch.
B-11 The system supplied or installed shall be guaranteed by the Bidder for a minimum period of
five years in regard to quality of material, workmanship, performance, efficiency, installation,
etc. Defects developed in the system within guarantee period, shall be rectified by the Bidder
at his own expense promptly. In case the defects are not rectified within 2 days of the receipt
of the complaint by the Bidder, GEDA shall have full liberty to remove such defect or
undertake such repairs as may be necessary to restore the system in working condition. The
expenditure so incurred by GEDA shall be deducted from Bidder’s pending claims, security,
etc. and if necessary may be recovered in other mode provided under the law. In the event of
failure of the complete system, if necessary, the whole system shall be replaced by the Bidder
promptly.
(Sign and Seal of the bidder)
Page 13 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
B-12 Notices, Statements and other communications sent by GEDA through registered post or
telegram or telex or to the Bidder at his specified address shall be deemed to have been
delivered to the Bidder.
B-13 The work shall be carried out by the Bidder with prior approval of GEDA. Work carried out
without GEDA’s approval shall not be accepted and the GEDA shall have right to reject it and
to recover the cost as so incurred, from the Bidder.
B-14 All equipment/material shall be suitably packed for transport/carriage at site and outdoor
storage during transit as per best industrial practices and appropriate standards. The Bidder
shall be responsible for any damage to the equipment during transit due to improper or
inadequate packing. The cases containing easily damageable material shall be very carefully
packed and marked with appropriate caution symbols i.e. 'FRAGILE, HANDLE WITH CARE' etc.
The contents of each package shall bear marking that can be readily identified from the
package list and packing shall provide complete protection from moisture, termites and
mechanical shocks during shipment/transportation to site. Adequate protection must be
provided for outdoor storage at site in tropical humid climate, wherever necessary proper
arrangement for attaching signs for lifting shall be provided and all packages clearly marked
with gross weight, signs showing 'UP' and 'DOWN' sides of boxes, contents of each package,
order no. And date, name of the plant/equipments to which the material in the package forms
the part of, and any handling and unpacking instructions considered necessary. The Bidder
without any extra cost shall supply any material found short inside intact packing case. The
Bidder shall ascertain prior to shipment, from concerned authorities, the transport limitations
like weight and maximum allowable package size for transportation. All packing cases and
packing material shall become the property of the purchaser.
B-15 The Bidder shall provide one copy of the instruction manual and routine maintenance manual
in Gujarati with each item supplied or installed. These manuals should contain all the relevant
details and drawings required for proper maintenance of the system supplied or installed.
B-16 The Bidder shall not display the photograph of the work and shall not take advantage through
publicity of the work without written permission of GEDA.
B-17 The inspection as mentioned in clause No. B-10 by GEDA’s representative shall not relieve the
Bidder from full responsibility of completing the work confirming to the requirement of this
contract.
B-18 Conditional tenders shall not be accepted.
(Sign and Seal of the bidder)
Page 14 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
5.0 GUIDELINES and ELIGIBILITY CRITERIA FOR BIDDERS
1. INDICATIVE TARGETS: Tender is invited for Installation of Solar Photovoltaic System in the
state of Gujarat during the year 2012-13 under the GEDA Solar PV Programme. The indicative
quantities to be supplied, installed and commissioned during the year 2012-13 as per the below
table :
SOLAR PV ROOFTOP SYSTEM WITH BATTERY BANK (Quantity in Nos.)
1 kW system 25
2 kW system 25
3 kW system 25
5 kW system 25
GRID CONNECT SOLAR POWER GENERATING SYSTEM(Quantity in Nos.)
10 kW System 25
15 kW system 25
20 kW system 25
25 kW system 25
SOLAR PV HOME SYSTEMS 100 Nos.
SOLAR PV STREET LIGHT
SYSTEMS
100 Nos.
2. ELIGIBILITY: Only those bidders, who manufacture, at least one of the major items used in the
lighting systems i.e. solar PV modules or storage battery or electronics, OR MNRE registered
channel partners having adequate facilities for testing (i.e. digital DC power supply, Tongue
tester, solarimeter, multimeters etc.) of solar lighting system would be allowed to supply the
systems under the scheme. The bidder should submit the list and pictures of the manufacturing
and testing facilities and submit an undertaking that if the details provided by the bidders are in
deviation with the provision of the scheme, it will call for disqualification. If considered
necessary, a team of GEDA official may visit the facilities of the bidders for verification.
Companies which are engaged only in assembly of solar lighting systems with above mentioned
bought out items will not be eligible for supply of systems under this scheme except MNRE
registered Channel Partners.
3. It is mandatory to have valid IEC certificates for Solar panels & batteries; and certificates from
National/NABL accredited laboratory for LED fixture as mentioned in the specifications, issued
on or after 1st
April 2011. Copies of such certificates should be attached /uploaded with the
tender. Tenders received without test certificates as above will be rejected out-right and no
correspondence will be entertained in this regards.
4. The PV modules must be tested and approved by one of the IEC authorized test centers. Test
certificates can be from any of the NABL/ BIS Accredited Testing / Calibration Laboratories.
(Sign and Seal of the bidder)
Page 15 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
Qualification test certificate as per IEC standard, issued by the Solar Energy Centre for small
capacity modules upto 37Wp capacity will also be valid.
5. Test certificates for the BoS items/ components can be from any of the NABL/ BIS Accredited
Testing-Calibration Laboratories/ MNRE approved test centers.
6. The bidder should have supplied solar photovoltaic systems of the values Rs. 10 crores for grid
connected systems and Rs. 5 crores for off-grid (stand alone ) systems, out of which Rs. 100
lacs and Rs. 50 lacs respectively for grid connected systems and off- grid (stand alone) systems;
to any State Nodal Agencies/ Government Departments/ PSUs during the past three financial
years and supplies against such work order should have completed satisfactorily as certified by
the concerned State Nodal Agencies/ Government departments.
7. The bidder should have supplied a minimum 100 nos. solar photovoltaic systems, during the
past three years and should be working satisfactorily, to any State Nodal Agency/ Government
department/ PSUs.
8. SPECIFICATIONS: The specifications of SPV systems, for which tenders are invited, are annexed.
9. AFTER SALES SERVICES: Bidders should have well established network of service centers within
the state and should have adequately trained staff available at service stations for repair and
maintenance of Solar PV Systems.
10. Bidder will ensure that necessary spares are always available with their service centers to
provide necessary after sales service to the customers during the warranty period.
11. LOI: Fax Letter of Intent (LOI) shall be issued to the shortlisted Bidders indicating the quantity
allocated to them and the security deposit amount to be deposited by them with GEDA.
Shortlisted Bidders will be required to deposit the requisite security deposit within one week of
issuance of Fax Letter of Intent, failing which the letter of intent will stand as cancelled. The
order will be issued to the shortlisted Bidders only after receipt of requisite security deposit.
12. SECURITY DEPOSIT: Bidders, to whom order is awarded for the year 2012-13 will be required to
deposit security deposit of Rs.50,000/- or 3% of total order value awarded to them, which ever
is more. The Security Deposit will be accepted in the form of Demand Draft issued by
Nationalized Bank, ICICI Bank, IDBI Bank, UTI Bank, HDFC Bank in favour of Gujarat Energy
Development Agency payable at Gandhinagar. The Security Deposit can also be submitted in
the form of Bank Guarantee issued by Nationalized Bank, ICICI Bank, IDBI Bank, AXIS Bank, HDFC
Bank, Kotak Mahindra Bank, Yes Bank, IndusInd Bank , Saurastra Gramin Bank, Baroda Gujarat
Gramin Bank, Dena Gujarat Gramin Bank, The Kalupur Commercial Co-operative Bank Ltd. ,
Rajkot Nagrik Sahakari Bank Ltd. , The Ahmedabad Mercantile Co-operative Bank Ltd., The
Mehsana Urban Co-operative Bank Ltd. as per GEDA’s format with validity of 180 days. The
Security Deposit submitted in the form of Demand Draft will be retained till completion of the
work .No interest will be paid on the Security Deposit. The Earnest Money Deposit of the
successful bidders will be retained as security deposit and will form part of the total security
deposit required to be deposited by the successful bidder.
(Sign and Seal of the bidder)
Page 16 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
13. ADDITIONAL ORDER: In the event of awarding the order of additional quantity, the Bidder will
be required to deposit additional Security Deposit on prorate basis within one week of the
issuance of Fax LOI for the additional order quantity.
14. TIME SCHEDULE: It is very critical to complete the work as per the order given by the agency
before January 31, 2013. To ascertain the manufacturing capabilities of each Bidder, no. of
systems that could be supplied, installed and commissioned by the Bidder in the state, every
Bidder is required to submit with their Technical offer, information about manufacturing
capacity of their factory and no. of systems that could be supplied in the State. In the event of
failure to supply no. of systems as per order, will lead to forfeiter of the Security Deposit up to
100% and will lead to disqualification of the Bidder for transacting business with GEDA for
atleast three years or the time duration as may be decided by the Director, GEDA.
15. The Bidder shall arrange to provide to each beneficiary, a SPV instruction manual. The Bidder
shall also arrange to instruct each beneficiary about routine maintenance procedure.
16. IDENTIFICATION MARK: Serial Number (identification mark) must be permanently marked on all
major components (PCB, Battery, Module, Body etc.) of the SPV systems. Metallic number
plates with serial numbers duly riveted or fixed with strong adhesive for non-metallic body, as
approved by GEDA, shall be fixed on charge controller/ light fixture of each lot.
17. INSPECTION OF MATERIAL: he Bidder will offer Solar PV Systems for inspection at their works by
GEDA or its authorized quality inspection agency. Inspection can also be offered at one place in
Gujarat (main distributor’s place), where equivalent inspection facilities are available. GEDA may
carry out random testing of SPV systems at Bidder’s factory for various parameters as per the
specifications laid by GEDA. Visual inspection shall be carried for 100% of SPV systems. Bidder
will intimate to GEDA in writing in advance for such inspections. If during the inspection the
percentage of rejections exceeds 10% then the whole lot would be rejected. The rejected
material is to be replaced with new material as per the specifications. The systems should be
offered for inspection again after necessary rectification. Expenses for such re-inspection shall
be borne by the Bidder.
GEDA reserves the right to inspect any number of SPV systems, any number of times at the
addresses of the beneficiaries given by the Bidder.
18. IDENTIFICATION OF BENEFICIARIES: GEDA has identified the site/ beneficiary after surveys and
site details/ list of the beneficiaries shall be provided along with the order. All wiring shall be
concealed/ in Rigid PVC pipe as per the requirement of site. For rooftop and grid connected
systems all wiring shall be UV-resistant certified for solar application, concealed in galvanized
cable trays with minimum 3 cm clearance from the terrace/ rooftop floor.
19. PAYMENTS
The payment terms shall be as follows:
a. 25 % of total order value shall be paid as an advance to the Tenderer against submission of
bank guarantee of equivalent amount issued by Nationalized Bank, ICICI Bank, IDBI Bank,
UTI Bank and HDFC Bank as per the prescribed format of GEDA, valid for the period of six
months.
b. 50 % total order value shall be released to the Tenderer after submission of following
necessary documents in duplicate at GEDA and after on-site verification/ inspection by
(Sign and Seal of the bidder)
Page 17 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
GEDA and/or its authorized inspection agency/ies as per norms of GEDA, for which the claim
is received:
a. Bills
b. Installation certificate duly signed by beneficiary showing its installation date.
c. Security Deposit shall be released with this 50% payment of the order.
d. 25% of the order value shall be paid against submission of Performance Bank Guarantee of
equivalent amount valid for the period of 5 years.
20. OTHER TERMS & CONDITIONS: GEDA, at its discretion, may award work to more than one
Bidder and will decide the quantity to be allocated to them. Decision of GEDA in this matter, will
be binding to all the Bidders.
21. In case of any type of misappropriations, cheating or intention of cheating, frauds, irregularities,
malpractice, etc. the Director GEDA reserves the right to cancel the order without giving reasons
thereof and forfeit the security deposit.
22. Rates quoted by the Bidder will be inclusive of taxes, levies, duties, packing, forwarding, freight,
insurance, loading unloading, supply, installation, commissioning, warranties and any/ all
charges for successful Supply and Installation of the system at any locations in the State of
Gujarat and all expenses of marketing, commissions etc
23. The rates quoted by the Bidder will be inclusive of Service Tax, Work Contract Tax, VAT or any
other taxes applicable for such work. Any escalation in such taxes/ levies during the tenure of
the contract/order, will not be paid by GEDA and Bidders are advised to take in to consideration
any such escalations in the prevailing taxes/levies/duties.
24. During site inspection by GEDA staff/ authorized representative, if the systems are found
uninstalled and false report of installation and commissioning is submitted to GEDA for claiming
payment, Director, GEDA is empowered to forfeit Security Deposit up to 100% & to terminate
the contract.
25. Bidders are required to quote rates inclusive of Comprehensive Maintenance Contact (CMC) for
the period of five years for the system. The rates quoted should be should be inclusive of
charges for providing routine maintenance services at the beneficiary’s end to ensure smooth
and satisfactory performance of the system. Replacement of any components of the system is
included in the scope of work of CMC. As per the format given in the bid document quarterly
report should be prepared and submitted to GEDA after providing necessary services.
26. Training of representative of the beneficiary on the aspect of primary trouble shooting and
Do’s & Don’ts of the SPV systems, including general operation and maintenance, including
lodging complaints & primary reporting.
(Sign and Seal of the bidder)
Page 18 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
6.0 TENDER EVALUATION CRITERIA
Offers of only those parties who are found qualifying based of following Tender Evaluation Criteria
will be taken in to further consideration and prices of only those parties qualifying based of these
criterion will be opened.
COMMERCIAL
1) Earnest Money Deposit and Tender Document Fee in the prescribed form should be submitted
along with the tender.
2) The company should have supplied PV systems of Rs. 300 lacs in past three years as per clause
no.6, 7, 8 of Chapter no. 5.
TECHNICAL
1) Only those bidders as defined in Chapter no. 5 Clause 2, who manufacture at least one of the
major items used in the lighting systems i.e. solar PV modules or storage battery or electronics,
OR MNRE registered channel partners having adequate facilities for testing (i.e. digital DC
power supply, Tongue tester, solarimeter, multimeters etc.) of solar lighting system would be
allowed to supply the systems under the scheme. The bidder should submit the list and pictures
of the manufacturing and testing facilities and submit an undertaking that if the details provided
by the bidders are in deviation with the provision of the scheme, it will call for disqualification. If
considered necessary, a team of GEDA official may visit the facilities of the bidders for
verification. Companies which are engaged only in assembly of solar lighting systems with above
mentioned bought out items will not be eligible for supply of systems under this scheme.
2) The bidder should have valid test certificates as per required specifications for supply under
tender and submit the copy of test reports.
3) Offers received from only those parties having adequate infrastructure to manufacture, Market
and provide after sales services in the state will be taken in to consideration and offers received
from others will be summarily rejected. Documentary evidences in support of the same should
be enclosed with the offer. GEDA may visit manufacturing facilities to ascertain the claims made
by the Bidder.
4) Details of similar work done in last three years along with copies of the orders and certificates
from the user agencies should be submitted along with the Technical Offer as per Annexure – 2
of the Offer Document.
5) The party should have sufficient technically qualified and well-experienced manpower for
Manufacturing, Marketing, and Installation and after sales service of the systems. Brief bio-data
of the key personnel be enclosed with the offers as per Annexure-3 of the Document.
GENERAL
1) The party should have declared, if any relatives working with GEDA in Annexure – 4.
2) As an acceptance of terms and conditions, the document duly signed and sealed on every page
should be returned along with the offer. Offers not satisfying any of the above mentioned
criteria will be liable for rejection.
(Sign and Seal of the bidder)
Page 19 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
Annexure 2: Details of similar work experience in last three years
(Information to be attached with the Technical Offer)
Sr. No. Name of
the
Company
with full
address,
phone, fax
and name
of contact
person
Work
Description
Ref. and
date of
the order
Work Order Value Details of order
and its configuration
 Copies of Work orders along with Work completion certificates should be attached with this
information.
 If necessary, separate sheet may be used to submit the information.
(Sign and Seal of the bidder)
Page 20 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
Annexure 3: Details of Technical staff available with the company for execution of work
(Information to be attached with the Technical Offer)
Sr.
No
.
Name Qualification Additional
Certificati
on, if any
Total
Experience
, no. of
years
Remarks
 Copies of Resumes and appropriate certifications should be attached with this information.
 If necessary, separate sheet may be used to submit the information.
Annexure 4: DECLARATION
(Strike off whichever is not applicable)
This is to declare that Mr/Ms. __________________________________, employee of GEDA at
_____________________(place), is related to our ___________________________
_______________________(designation and name).
OR
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives
employed or working with Gujarat Energy Development Agency at any of its offices or its parent
Department i.e. Energy and Petrochemicals Dept., Govt. of Gujarat.
Date : Sign. and Stamp of the Tenderer
(Sign and Seal of the bidder)
Page 22 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
Annexure 5: DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified below
in this sheet. If there are no deviations offered, it should be clearly mentioned on this page.
Deviation offered to
Chapter No, Clause No. of
the tender document
Deviation offered
(Sign and Seal of the bidder)
Page 23 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
QUARTERLY MAINTENANCE & SERVICING REPORT FORMAT
1. DETAILS OF SOLAR PHOTOVOLTAIC SYSTEM INSTALLED
1. Supplied by :
2. Date of installation :
3. Servicing period : From to
2. USER PROFILE
1. Name and address of User:
3. TECHNICAL DETAILS
1. Module Capacity, make and serial number :
2. Battery Capacity, make and serial number :
3. DC fan make and serial number :
4. CHECK OF THE PRODUCT
1. Correct inclination and orientation of SPV panel :
2. Cleaning of dust from SPV panel :
3. Interconnection of modules, charge controller, battery etc.:
4. Fuse of charge controller, light fixture, fan & switches :
5. Battery Voltage as measured by multimeter: :
6. Cleaning of battery terminals and providing petroleum jelly:
7. Topping up of battery with distilled water/ acid :
5. DIFFICULTIES IN OPERATION/ PROBLEM FACED BY USER:
6. DIAGNOSIS DETAILS/ REPAIR ACTION:
7. DATE ON WHICH SYSTEM WAS LAST ATTENDED:
8. REMARKS:
User Name & Signature Technician’s Name & Signature
Date: (with rubber stamp)
(Sign and Seal of the bidder)
Page 24 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
Appendix I
FORMAT FOR WARRANTY CARD TO BE SUPPLIED WITH EACH SOLAR PV SYSTEM
1. Name & Address of
The Bidder/Bidder of the System
2. Name & Address of Purchasing Agency
3. Date of supply of the system
4. Details of PV Module (s) supplied in the
System Make (Name of the Bidder)
Model
Serial No(s)
Wattage of the PV Module (s) under STC
Warranty valid up to
5 Details of Battery
System Make (Name of the Bidder)
Model
Batch/Serial No(s)
Rated V & AH capacity at C/20 or C/10 rate at 20 C
Warranty valid up to
6 Details of PCU/ Electronics & other BOS items/ cables.
System Make (Name of the Bidder)
Model
Serial No(s)
Warranty valid up to
7 Designation & Address of the person to be
Contacted for claiming Warranty obligations.
(Signature)
Name & Designation
Name & Address of the Bidder/bidder
(SEAL)
Place & Date:
(During the warranty period State Agencies/users reserves the right to cross check the
performance of the systems with the minimum performance levels specified in the
specifications).
(Sign and Seal of the bidder)
Page 25 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11))
Annexure 6:List of Plant and Machinery
(To be completely filled by the tenderer)
For manufacturing of Solar PV panels ( as applicable)
S. No. Name of equipment Date of purchase Date of calibration Utility
For manufacturing of electronics ( as applicable)
S. No. Name of equipment Date of purchase Date of calibration Utility
For manufacturing of Battery ( as applicable)
S. No. Name of equipment Date of purchase Date of calibration Utility

More Related Content

Viewers also liked

Tender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanTender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanHeadway Solar
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantL'Obel Solar Power System
 
Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20prodv
 
Solar electric installation check list
Solar electric installation check listSolar electric installation check list
Solar electric installation check listDigital Consummate
 
National Solar Jobs Census 2013
National Solar Jobs Census 2013National Solar Jobs Census 2013
National Solar Jobs Census 2013GW Solar Institute
 
Haryana solar power policy 2014
Haryana solar power policy 2014Haryana solar power policy 2014
Haryana solar power policy 2014Headway Solar
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013Headway Solar
 
Economics of Solar PV Power
Economics of Solar PV PowerEconomics of Solar PV Power
Economics of Solar PV PowerSudhanwa Sahoo
 
Bridging the Solar Income Gap Working Paper
Bridging the Solar Income Gap Working PaperBridging the Solar Income Gap Working Paper
Bridging the Solar Income Gap Working PaperGW Solar Institute
 
Financing the Next Generation of Solar Workers
Financing the Next Generation of Solar WorkersFinancing the Next Generation of Solar Workers
Financing the Next Generation of Solar WorkersThe Solar Foundation
 
Fact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice AggregationFact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice AggregationThe Solar Foundation
 
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - DraftHeadway Solar
 
Philips Solar Installation - Reference
Philips Solar Installation -  ReferencePhilips Solar Installation -  Reference
Philips Solar Installation - ReferenceShivendra Kumar
 

Viewers also liked (19)

Tender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanTender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at Daman
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 
Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20
 
Document samples
Document samplesDocument samples
Document samples
 
Final standard tender doc
Final standard tender docFinal standard tender doc
Final standard tender doc
 
Solar electric installation check list
Solar electric installation check listSolar electric installation check list
Solar electric installation check list
 
National Solar Jobs Census 2013
National Solar Jobs Census 2013National Solar Jobs Census 2013
National Solar Jobs Census 2013
 
Haryana solar power policy 2014
Haryana solar power policy 2014Haryana solar power policy 2014
Haryana solar power policy 2014
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013
 
Economics of Solar PV Power
Economics of Solar PV PowerEconomics of Solar PV Power
Economics of Solar PV Power
 
Bridging the Solar Income Gap Working Paper
Bridging the Solar Income Gap Working PaperBridging the Solar Income Gap Working Paper
Bridging the Solar Income Gap Working Paper
 
Financing the Next Generation of Solar Workers
Financing the Next Generation of Solar WorkersFinancing the Next Generation of Solar Workers
Financing the Next Generation of Solar Workers
 
Fact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice AggregationFact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice Aggregation
 
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 3 Tranche 1 Guidelines - Draft
 
National Solar Jobs Census 2010
National Solar Jobs Census 2010National Solar Jobs Census 2010
National Solar Jobs Census 2010
 
National Solar Jobs Census 2011
National Solar Jobs Census 2011National Solar Jobs Census 2011
National Solar Jobs Census 2011
 
National Solar Jobs Census 2012
National Solar Jobs Census 2012National Solar Jobs Census 2012
National Solar Jobs Census 2012
 
Different Types of Dance Rhythms
Different Types of Dance RhythmsDifferent Types of Dance Rhythms
Different Types of Dance Rhythms
 
Philips Solar Installation - Reference
Philips Solar Installation -  ReferencePhilips Solar Installation -  Reference
Philips Solar Installation - Reference
 

Similar to Tender Document for Solar Power Plant in Gujarat Part 1

Tender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandTender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandHeadway Solar
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...Harish Sharma
 
Gujarat energy development agency 125 mw
Gujarat energy development agency 125 mwGujarat energy development agency 125 mw
Gujarat energy development agency 125 mwJay Ranvir
 
1324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-13654943321324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-1365494332Dayanand Sonawane
 
NOTICE INVITING TENDER
NOTICE INVITING TENDER NOTICE INVITING TENDER
NOTICE INVITING TENDER Laxman Chaldas
 
Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Headway Solar
 
4 BHK Flats in Sector 106 Gurgaon - Godrej Meridien Floor Plan
4 BHK Flats in Sector 106 Gurgaon - Godrej Meridien Floor Plan4 BHK Flats in Sector 106 Gurgaon - Godrej Meridien Floor Plan
4 BHK Flats in Sector 106 Gurgaon - Godrej Meridien Floor PlanPoojaShetty87
 
Tendernotice_1 (1).pdf
Tendernotice_1 (1).pdfTendernotice_1 (1).pdf
Tendernotice_1 (1).pdfssusera91051
 
Tendernotice_1.pdf
Tendernotice_1.pdfTendernotice_1.pdf
Tendernotice_1.pdfssusera91051
 
Tendernotice_1 (3).pdf
Tendernotice_1 (3).pdfTendernotice_1 (3).pdf
Tendernotice_1 (3).pdfHARIWAYLINES
 
Cattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxCattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxswarnavet05
 
Dmi housing Finance - Ahmedabad Business Standrad
Dmi housing Finance - Ahmedabad Business StandradDmi housing Finance - Ahmedabad Business Standrad
Dmi housing Finance - Ahmedabad Business Standraddmihousingfinance
 
Sebagian PO pembelian Komputer yang sudah kami kerjakan
Sebagian PO pembelian Komputer yang sudah kami kerjakanSebagian PO pembelian Komputer yang sudah kami kerjakan
Sebagian PO pembelian Komputer yang sudah kami kerjakansachirul alim
 
Eoi indoor & outdoor venue branding
Eoi indoor & outdoor venue brandingEoi indoor & outdoor venue branding
Eoi indoor & outdoor venue brandingplastivision
 

Similar to Tender Document for Solar Power Plant in Gujarat Part 1 (20)

Tender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandTender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, Uttarakhand
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
SKYSEA_CLASS 44_PRITY KHASTGIR.pdf
SKYSEA_CLASS 44_PRITY KHASTGIR.pdfSKYSEA_CLASS 44_PRITY KHASTGIR.pdf
SKYSEA_CLASS 44_PRITY KHASTGIR.pdf
 
Adb zone-i
Adb zone-iAdb zone-i
Adb zone-i
 
Gujarat energy development agency 125 mw
Gujarat energy development agency 125 mwGujarat energy development agency 125 mw
Gujarat energy development agency 125 mw
 
1324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-13654943321324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-1365494332
 
01_ONLINE_NOTICE[1]
01_ONLINE_NOTICE[1]01_ONLINE_NOTICE[1]
01_ONLINE_NOTICE[1]
 
Dtl nit-1496-140709 (1)
Dtl nit-1496-140709 (1)Dtl nit-1496-140709 (1)
Dtl nit-1496-140709 (1)
 
NOTICE INVITING TENDER
NOTICE INVITING TENDER NOTICE INVITING TENDER
NOTICE INVITING TENDER
 
Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015
 
Eoa report 2012-13
Eoa report 2012-13Eoa report 2012-13
Eoa report 2012-13
 
4 BHK Flats in Sector 106 Gurgaon - Godrej Meridien Floor Plan
4 BHK Flats in Sector 106 Gurgaon - Godrej Meridien Floor Plan4 BHK Flats in Sector 106 Gurgaon - Godrej Meridien Floor Plan
4 BHK Flats in Sector 106 Gurgaon - Godrej Meridien Floor Plan
 
Tendernotice_1 (1).pdf
Tendernotice_1 (1).pdfTendernotice_1 (1).pdf
Tendernotice_1 (1).pdf
 
Tendernotice_1.pdf
Tendernotice_1.pdfTendernotice_1.pdf
Tendernotice_1.pdf
 
Tendernotice_1 (3).pdf
Tendernotice_1 (3).pdfTendernotice_1 (3).pdf
Tendernotice_1 (3).pdf
 
Cattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxCattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docx
 
Dmi housing Finance - Ahmedabad Business Standrad
Dmi housing Finance - Ahmedabad Business StandradDmi housing Finance - Ahmedabad Business Standrad
Dmi housing Finance - Ahmedabad Business Standrad
 
Packslip andinvoice
Packslip andinvoicePackslip andinvoice
Packslip andinvoice
 
Sebagian PO pembelian Komputer yang sudah kami kerjakan
Sebagian PO pembelian Komputer yang sudah kami kerjakanSebagian PO pembelian Komputer yang sudah kami kerjakan
Sebagian PO pembelian Komputer yang sudah kami kerjakan
 
Eoi indoor & outdoor venue branding
Eoi indoor & outdoor venue brandingEoi indoor & outdoor venue branding
Eoi indoor & outdoor venue branding
 

More from Headway Solar

Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Headway Solar
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Headway Solar
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015Headway Solar
 
Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Headway Solar
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014Headway Solar
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Headway Solar
 
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesFinal draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesHeadway Solar
 
Renewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalRenewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalHeadway Solar
 
Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Headway Solar
 
RFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshRFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshHeadway Solar
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Headway Solar
 
Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Headway Solar
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Headway Solar
 
Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Headway Solar
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanHeadway Solar
 
Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Headway Solar
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabHeadway Solar
 
New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012Headway Solar
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draftHeadway Solar
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 

More from Headway Solar (20)

Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015
 
Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
 
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesFinal draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
 
Renewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalRenewable policy 2012 of West Bengal
Renewable policy 2012 of West Bengal
 
Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013
 
RFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshRFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar Pradesh
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014
 
Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Telangana solar RFS Document 2014
Telangana solar RFS Document 2014
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
 
Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
 
Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Rajasthan solar policy of 2014
Rajasthan solar policy of 2014
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draft
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 

Recently uploaded

Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingSERUDS INDIA
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...Christina Parmionova
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Christina Parmionova
 
2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdfilocosnortegovph
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...narwatsonia7
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfKatrina Sriranpong
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxLizelle Coombs
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urgesnarwatsonia7
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfAmir Saranga
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...narwatsonia7
 
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 

Recently uploaded (20)

Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donating
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...
 
2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptx
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdf
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
 
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 

Tender Document for Solar Power Plant in Gujarat Part 1

  • 1. TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133.. ((PPaarrtt --11)) GGuujjaarraatt EEnneerrggyy DDeevveellooppmmeenntt AAggeennccyy 4th Floor, Block No.11 and 12, Udyog Bhavan, Sector - 11 Gandhinagar – 382 017, Gujarat, India Phone : +91 79 23257251/2/3/4 Fax: +91 79 23257255, 23247097
  • 2. (Sign and Seal of the bidder) Page 2 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) TABLE OF CONTENTS- for Part 1 of the tender E- TENDER NOTICE..................................................................................................................................3 1.0 e Tendering (Online Tendering) Instruction to Bidders..................................................................4 2.0 CHECK LIST........................................................................................................................................6 Annexure 1: GENERAL INFORMATION ABOUT THE BIDDER................................................................7 3.0 INSTRUCTIONS TO THE BIDDER.....................................................................................................9 4.0 GENERAL TERMS AND CONDITIONS.............................................................................................11 5.0 GUIDELINES and ELIGIBILITY CRITERIA FOR BIDDERS...................................................................14 6.0 TENDER EVALUATION CRITERIA ....................................................................................................18 Annexure 2: Details of similar work experience in last three years ..................................................19 Annexure 3: Details of Technical staff available with the company for execution of work ...........20 Annexure 4: DECLARATION..................................................................................................................21 Annexure 5: DEVIATION SHEET............................................................................................................22 Annexure 6:List of Plant and Machinery.............................................................................................25
  • 3. (Sign and Seal of the bidder) Page 3 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) Gujarat Energy Development Agency 4th floor, Block No. 11 and 12, Sector - 11 Gandhinagar – 382 017, Gujarat, India Phone:+91 79 23257251/2/3/4, Fax: +91 79 23257255 URL:http://www.geda.gujarat.gov.in/ TENDER NO. : GEDA/SPV/2012-13/03 E- TENDER NOTICE Gujarat Energy Development Agency invites sealed offers for Installation of Solar Photovoltaic Systems in the State of Gujarat during the year 2012-13.Tender Document can be downloaded from the Agencies website https://geda.nprocure.com or www.nprocure.com. Interested parties are required to fill in the requisite details and submit their Technical Bid and Financial Bids along with a non-refundable Tender Fee of Rs.15, 000/- and an EMD of Rs.5, 00,000/- in the form of Demand Draft drawn on any Nationalized Bank, ICICI Bank, IDBI Bank, AXIS Bank, HDFC Bank, Kotak Mahindra Bank, Yes Bank, IndusInd Bank , Saurastra Gramin Bank, Baroda Gujarat Gramin Bank, Dena Gujarat Gramin Bank, The Kalupur Commercial Co-operative Bank Ltd. , Rajkot Nagrik Sahakari Bank Ltd. , The Ahmedabad Mercantile Co-operative Bank Ltd., The Mehsana Urban Co-operative Bank Ltd. separately in favor of Gujarat Energy Development Agency payable at Gandhinagar. The Tender schedule is as follows: Director, GEDA reserves the right to reject any/all offers without assigning any reasons thereof. Director Gujarat Energy Development Agency, Gandhinagar Sr. No. Tender Schedule Date Time 1. Online Downloading Start Date 14.09.2012 12 p.m. 2. Online Downloading End Date 12.10.2012 12 p.m. 3. Last Date of Physical Submission in GEDA Office 12.10.2012 3 p.m. 4. Bid Opening in GEDA Office 12.10.2012 3.30 p.m.
  • 4. (Sign and Seal of the bidder) Page 4 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) 1.0 e Tendering (Online Tendering) Instruction to Bidders 1. Down loading of Tender Documents 1.1. Bid document will be available on web site up to date shown in the tender advertisement. 1.2. Bidders wishes to participate in this tender will have get them self registered on web site www.nprocure.com or https://geda.nprocure.com 2. Digital Certificate 2.1. Bidders who wish to participate in on line tenders will have to procure / should have legally valid digital Certificate as per Information Technology act 2000 using which they can sign their electronic bids. Bidders can procure the same from any of the license certifying Authority of India or can contact (n) code solutions- a division of GNFC Ltd, who are licensed certifying Authority by Govt. Of India 2.2. All bids should be digitally signed, for details regarding digital signature certificate and related training involved the below mentioned address should be contacted 2.3. (n) Code Solution-A division of GNFC Ltd., (n) procure cell 403, GNFC Infotower, S. G. Road, Bodakdev, Ahmedabad- 380 054 Tel: +91 79 26854511/12/13 (Ext. 501,512, 516,517,525) Fax: +91 79 26857321 E-mail: nprocure@ncode.in Toll free number: 1-800-233-1010 (Ext. 501, 512,516, 517,525) 2.4. Bidders who already have a valid Digital certificate need not procure a new digital certificate. 3. On line Submission of Technical and Price Bid 3.1. Bidders can prepare and edit their offers number of times before tender submission date and time. After tender submission date and time, bidder cannot edit their offer submitted in any case. No written or online request in this regard shall be granted. 3.2. Tenderer shall submit their offer, i.e Technical bid as well as Price bid in Electronic format on above mentioned website and date shown in the tender details after Digitally signing the same. Physical submission of price bid will disqualify the bidder. 3.3. Offers submitted without digitally signed will not be accepted. 3.4. Offers only in physical form will not be accepted in any case. 4. Contacting Officer 4.1. Further details / clarification , if any required, will be available from Director, GUJARAT ENERGY DEVELOPMENT AGENCY, 4th floor, Block No. 11 and 12 Udyog Bhavan, Sector -11 Gandhinagar, Gujarat, India Phone : +91-079-23257251, 23257252, 23257253, 23257254 4.2. In case bidder needs any clarification /assistance or if training required for participating in online tender , they can contact at following office
  • 5. (Sign and Seal of the bidder) Page 5 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) 4.3. (n) Code Solution-A division of GNFC Ltd., (n) procure cell 403, GNFC Infotower, S. G. Road, Bodakdev, Ahmedabad- 380 054 Tel: +91 79 26854511/12/13 (Ext. 501,512, 516,517,525) Fax: +91 79 26857321 E-mail: nprocure@ncode.in Toll free number: 1-800-233-1010 (Ext. 501, 512,516, 517,525) 5. General Instructions: 5.1. The fees for on line tender document will not be refunded under any circumstances 5.2. EMD in the form specified in tender document only shall be accepted. 5.3. Tenders without Tender document fees, earnest money deposit (EMD) and which do not fulfils all or any of the condition or submitted in complete in any respect will be rejected. 5.4. Tenderer approved either by the Central/ State Govt. or Central / State Govt. undertaking is not exempted by this Agency for paying EMD , SD etc. 5.5. Conditional tender shall not be accepted. 5.6. The Internet site address for E-Tender is www.nprocure.com or https://geda.nprocure.com 5.7. The GEDA reserves the right to reject any or all the tenders or split the work between more than one bidders without assigning any reason thereof. 5.8. The attachments to the tender document shall be duly filed and page numbered, with an index, specifying the document attached and its page number(s).
  • 6. (Sign and Seal of the bidder) Page 6 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) 2.0 CHECK LIST To ensure that your offer submitted to GEDA is complete in all respects, please go through the following checklist and tick mark for the enclosures attached with your offer: Sr. No Description Attached YES/ NO Page No. 1 Earnest Money Deposit in the prescribed form 2 Tender Document Fee in the prescribed form. 3 The original document duly signed and sealed on every page, as a confirmation of acceptance of the terms and conditions of the document. 4 A copy VAT and CST Number, Permanent Account Number (PAN) 5 Relevant IEC certificates for SPV panels, Battery, PCU and all the other machineries & National/NABL accredited laboratory certificate for LED fixture issued on or after 1st April 2011. 6 Details of similar work done in last three years alongwith copies of the orders and certificates from the customers, as per the Offer Evaluation Criteria and as per Annexure – 2 of the tender document 7 Details of Technical staff available (Brief Biodata of key Personnel be given) as per Annexure – 3 of the tender document 8 Name and address of dealers/ distributors/ service stations in Gujarat along with copy of agreements. 9 Declaration of the Bidder about any relatives working with GEDA as per Annexure – 4 of the tender document 10 Deviation, if any, from the specifications, terms and conditions etc. (Annexure – 5) 11 Whether validity of your offer is confirmed as per the document DETAILS OF EARNEST MONEY DEPOSIT ATTACHED S.No. Description 1 Earnest Money Deposit Earnest Money Deposit of Rs. 5,00,000/- submitted in the form of Demand Draft/ Banker’s Cheque, drawn on______________________________________Bank, ______________________ Branch, bearing DD/BC No. _________________ dated ________________ OR Bank Gurantee No.________________dated_______is attached herewith. 2 Tender Document Fee Tender Document Fee of Rs. 15,000/- submitted in the form of Demand Draft/ Banker’s Cheque, drawn on______________________________________Bank, ______________________ Branch, bearing DD/BC No. _________________ dated ____________________ is attached herewith.
  • 7. (Sign and Seal of the bidder) Page 7 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) Annexure 1: GENERAL INFORMATION ABOUT THE BIDDER 1. Name of the Company 2. Postal Address 3. Telephone nos. Fax no. 4. e-mail address and URL 5. Type of Company Attach Proof of Company Registration alongwith a copy of the Partnership Deed/ Article of Association and Memorandum of Understanding Proprietorship/ Partnership/ Private Limited/ Public Limited 6. Name and designation of the representative of the Bidder to whom all reference shall be made to expedite technical co- ordination. 7. Entrepreneur Memorandum Part 2 registration with DIC/ NSIC registration no./ CSPO registration no./ DGSandD registration no. 8. Factory Address 9. Factory Telephone/Fax no. 10. Factory e-mail address 11. Floor area of the factory 12. Manufacturing facilities (a list of machinery be attached as per annexure - VI)
  • 8. (Sign and Seal of the bidder) Page 8 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) 13. Name and address of the Indian/ Foreign collaborator(s), if any. 14. Details of Technical Staff available. Please furnish information as per Enclosed Annexure II. 15. Details of workmen on muster roll Skilled/ unskilled. (attach copy of muster roll) 16. List of components manufactured by the company at their factory. SPV panel/ Electronics/ Battery (Pl. tick appropriately) 17. List of components sourced from outside/ other agencies. 18. Has the company/firm to pay arrear of income tax? If yes upto what amount. 19. Turnover of company for last 3 years 2009-10, 2010-11, 2011- 2012. 2009-10 Rs. 2010-11 Rs. 2011-12 Rs. 20. Has any Govt. Dept./ Under- taking ever debarred the company/ firm from executing any work? 21. Approved MNRE Channel Partners under JNNSM (attach MNRE letter). YES/ NO It is certified that the information provided above is true to the best of my knowledge and belief. If any information found to be concealed, suppressed or incorrect at later date, our tender shall be liable to rejected and our company debarred from executing any business with GEDA. Date: Sign. and Stamp of the Tenderer
  • 9. (Sign and Seal of the bidder) Page 9 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) 3.0 INSTRUCTIONS TO THE BIDDER A.1 Online offer should be submitted complete in all respects with all schedules, documents etc. of the tender document. Physical offers shall be received in GEDA office upto the date and time as mentioned in the tender form. A.2 GEDA reserves the rights to reject any or all the Offers or accept any Offer in total or in part or may divide the work among various Bidders, without assigning any reason thereof. A.3 Tenders should be accompanied with requisite Earnest Money Deposit (EMD). Any Tender not accompanied by Earnest Money Deposit (EMD) shall be disqualified and no further consideration shall be given to such Tender. Tenderers may note that no relaxation in this regard shall be made. Tenderers having valid registration of Entrepreneur Memorandum Part 2 with DIC for the tendered item AND are having valid registration with CSPO/NSIC/DGS & D will be exempted from depositing the EMD. NSIC/ Entrepreneur Memorandum Part 2 registration for other than tendered item will not be taken in to consideration and in such case; tenderer will be required to submit requisite EMD with their tender. A.4 Earnest Money Deposit (EMD) of unsuccessful bidders shall be returned back upon finalization of tenders. Earnest Money Deposit of successful bidders will be retained as Security Deposit. A.5 If any information provided by the bidder is found to be concealed, suppressed or incorrect at later date or during finalization of the tender or the bidder withdraws their offer during finalization of the tender, the tender shall be liable to be rejected and company shall be debarred from executing any business with GEDA for the period of 3 years and the EMD of such bidder shall be forfeited. A.6 Validity of the offer should be at least up to March 31, 2013. Without this validity the Offers shall be rejected. A.7 Before submission of the Offer, Bidders are required to make themselves fully conversant with the scope of the work, technical requirements and specifications, etc., so that no ambiguity arises on a latter date in this respect. A.8 All information in the Offer shall be in English. Information in any other language should be accompanied by its translation in English. Failure to comply with this may disqualify the Bidder. A.9 If the Bidder finds discrepancies in, or omissions from the specifications or other documents or if he is in doubt as to their meaning, he should at once intimate GEDA and obtain clarification in writing prior to submitting his Offer. A.10 Any approach from the Bidder, his representative or his agent to influence the decision on the Offer, officially or otherwise, shall render the Offer liable to be summarily rejected.
  • 10. (Sign and Seal of the bidder) Page 10 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) A.11 Physical offer should be submitted in sealed envelopes super scribed with as” Installation of Solar Photovoltaic System in the State of Gujarat during the year 2012-13”.All the papers of Tender documents duly signed should be submitted in the envelope. Requisite Earnest Money Deposit and Tender Document Fee in the form of Demand Draft drawn on a nationalized bank, ICICI Bank, IDBI Bank, AXIS Bank, HDFC Bank, Kotak Mahindra Bank, Yes Bank, IndusInd Bank , Saurastra Gramin Bank, Baroda Gujarat Gramin Bank, Dena Gujarat Gramin Bank, The Kalupur Commercial Co-operative Bank Ltd. , Rajkot Nagrik Sahakari Bank Ltd. , The Ahmedabad Mercantile Co-operative Bank Ltd., The Mehsana Urban Co-operative Bank Ltd. pledged in the name of “Gujarat Energy Development Agency”, payable at Gandhinagar should be attached with this bid. A.12 Erases and other changes shall be initialed by the person/persons signing the Offer. A.13 Each page of the Offer document should be signed and stamped by the Bidder as a token of acceptance to terms and conditions mentioned herein. A.14 Offers of only those firms or individuals, who are either themselves technically capable and sound for providing such services and who give satisfactory evidence of such experience shall only be considered. A.15 The general technical requirements mentioned are mainly for the guidance of the Bidder. These requirements are not intended to preclude ingenuity of designs or other improvements. If the Bidder proposes any deviation from these requirements those shall be considered provided they are necessary either to improve the utility, performance and efficiency or to secure over all economy. The Bidder shall give a separate list containing points of deviations in his offer from the specifications asked for. A.16 The Bidder shall declare the name of the employee of GEDA and his relationship with him in case any employee of GEDA is a relative of the Bidder. A.17 In the event, the successful Bidder fails to sign the agreement with GEDA or accept the work order within specified time or withdraws his offer within the validity period or fails to accept the order for any reason whatsoever, then the earnest money deposited by the Bidder shall be forfeited by GEDA. A.18 GEDA reserves the right to accept any offer based on its merits and GEDA is not bound to place the order with the party having submitted the lowest offer. Thus party merely on the ground that their financial offer is lowest, does not necessarily qualify them for receiving the order. A.19 Only Notarized copies of documents will be submitted in support of claims made by the party and party shall bring the original copies of documents for verification by GEDA officials. A.20 GEDA, at its discretion, may award the work to more than one party.
  • 11. (Sign and Seal of the bidder) Page 11 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) 4.0 GENERAL TERMS AND CONDITIONS B-1 In this deed of agreement/ Offer, unless the context otherwise requires:- GEDA shall mean the Director or his representative of Gujarat Energy Development Agency, with Head Office at 4th floor, Block No. 11 and 12, Udyog Bhavan, Sector - 11, Gandhinagar – 382 017, and shall include his successors and assignees. The Bidder shall mean the Bidder/ Associate whose Offer shall be accepted by GEDA and shall include such Bidders/ Associate heirs, legal representatives, successors and assignees. Associate shall mean the business associate authorized and having valid agreement with Public Sector Enterprise having ten years experience in solar energy field with office in the State of Gujarat. The offer shall be considered on behalf of the Public Sector Enterprise and authority letter for submitting the tender shall be furnished. If the Public Sector Enterprise directly participates in the tender, Associate’s offer shall not be considered. B-2 The Bidder shall be deemed to have carefully examined all the papers, drawings, etc. attached in the contract. If he has any doubt as to the meaning of any portion of any condition/ specification, etc. he shall before signing the contract submit the particulars thereof to GEDA in order that such doubts are removed. B-3 The work, shall be completed within the completion period as mentioned in the agreement, failing which penalty at the rate of 1 % per week subject to maximum of 10 % of agreement value shall be imposed as time is the essence of the contract. If the bidder fails to complete the work within ten weeks after scheduled date, GEDA reserves the right to cancel the order. This excludes delay in the completion of the work due to unforeseen reasons beyond the control and without fault and negligence of the Bidder including (but not restricted to) act of God or public anomie action of Government in its sovereign capacity, floods, epidemics, strikes, lockouts, fires and accidents. In the event of any of the aforesaid contingencies GEDA may be promptly kept informed by the Bidder by Fax/Telex/Telegram followed by confirmation in writing with documentary proof within fifteen days of commencement and cessation of Force Majeure circumstances. Under such circumstances reasonable extension of time shall be granted by GEDA. Application for such extension must be made before the due date of completion of work as per agreement. In the event of termination of the agreement, GEDA shall be at liberty to get the remaining part of the work done through any other agency/Bidder in the manner and on the terms it thinks proper. If the cost of executing the work as aforesaid shall exceed the balance due to the Bidder, and the Bidder fails to make good the deficiency, GEDA may recover it from the Bidder in any lawful manner. B-4 The Bidder shall have to comply with all rules, regulations, laws and bylaws enforced by local and State Govt. and also the organization in whose premises the work has to be done. B-5 The Bidder shall not, without the consent in writing of GEDA, transfer, assign or sublet the work under this contract or any substantial part thereof to any other party.
  • 12. (Sign and Seal of the bidder) Page 12 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) B-6 If the Bidder neglects to execute the work with due diligence and expedition or refuses or neglect to comply with any reasonable orders within two days notice given in writing to the Bidder and if he fails to comply with the notice, then in such a case GEDA shall be at liberty to get the work or any part of it, executed through any other agency/Bidder in the manner and on the terms it thinks proper. If the cost of executing the work as aforesaid shall exceed the balance due to the Bidder, and the Bidder fails to make good the deficiency, GEDA may recover it from the Bidder in any lawful manner. B-7 GEDA shall have at all reasonable time access to the works being carried out by the Bidder under this contract. All the works shall be carried out by the Bidder to the satisfaction of GEDA. B-8 Any question, dispute or difference whatsoever arises between GEDA and Bidder, in connection with this agreement except as to matters, the decision for which has been specifically provided, either party may forthwith give to the other notice in writing of existence of such questions, dispute, difference and the same shall be referred to the sole arbitration of a person nominated by Director GEDA. This reference shall be governed by Indian Arbitration Act prevailing at the time of dispute and the rules made there under. The award in such arbitration shall be final and binding on all the parties. Work under the agreement shall continue during the arbitration proceedings unless the GEDA or the Arbitrator directs otherwise. B-9 GEDA may at any time by notice in writing to the Bidder either stop the work altogether or reduce or cut it down. If the work is stopped altogether, the Bidder shall only be paid for work done and expenses legitimately incurred by him as on preparation of the execution of the work upto the date on which such notice is received by him. Such expenses shall be assessed by GEDA whose decision shall be final and binding on the Bidder. If the work is cut down the Bidder shall not be paid for the work as so cut down, but in neither case shall be paid any compensation what so ever for the loss or profit which he might have made if he had been allowed to complete all the work included in the contract. B-10 Prior to dispatch, the materials may be inspected and tested by GEDA at the Bidder's works. Bidder shall inform GEDA for such inspection at least 7 days in advance before the probable date of dispatch. B-11 The system supplied or installed shall be guaranteed by the Bidder for a minimum period of five years in regard to quality of material, workmanship, performance, efficiency, installation, etc. Defects developed in the system within guarantee period, shall be rectified by the Bidder at his own expense promptly. In case the defects are not rectified within 2 days of the receipt of the complaint by the Bidder, GEDA shall have full liberty to remove such defect or undertake such repairs as may be necessary to restore the system in working condition. The expenditure so incurred by GEDA shall be deducted from Bidder’s pending claims, security, etc. and if necessary may be recovered in other mode provided under the law. In the event of failure of the complete system, if necessary, the whole system shall be replaced by the Bidder promptly.
  • 13. (Sign and Seal of the bidder) Page 13 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) B-12 Notices, Statements and other communications sent by GEDA through registered post or telegram or telex or to the Bidder at his specified address shall be deemed to have been delivered to the Bidder. B-13 The work shall be carried out by the Bidder with prior approval of GEDA. Work carried out without GEDA’s approval shall not be accepted and the GEDA shall have right to reject it and to recover the cost as so incurred, from the Bidder. B-14 All equipment/material shall be suitably packed for transport/carriage at site and outdoor storage during transit as per best industrial practices and appropriate standards. The Bidder shall be responsible for any damage to the equipment during transit due to improper or inadequate packing. The cases containing easily damageable material shall be very carefully packed and marked with appropriate caution symbols i.e. 'FRAGILE, HANDLE WITH CARE' etc. The contents of each package shall bear marking that can be readily identified from the package list and packing shall provide complete protection from moisture, termites and mechanical shocks during shipment/transportation to site. Adequate protection must be provided for outdoor storage at site in tropical humid climate, wherever necessary proper arrangement for attaching signs for lifting shall be provided and all packages clearly marked with gross weight, signs showing 'UP' and 'DOWN' sides of boxes, contents of each package, order no. And date, name of the plant/equipments to which the material in the package forms the part of, and any handling and unpacking instructions considered necessary. The Bidder without any extra cost shall supply any material found short inside intact packing case. The Bidder shall ascertain prior to shipment, from concerned authorities, the transport limitations like weight and maximum allowable package size for transportation. All packing cases and packing material shall become the property of the purchaser. B-15 The Bidder shall provide one copy of the instruction manual and routine maintenance manual in Gujarati with each item supplied or installed. These manuals should contain all the relevant details and drawings required for proper maintenance of the system supplied or installed. B-16 The Bidder shall not display the photograph of the work and shall not take advantage through publicity of the work without written permission of GEDA. B-17 The inspection as mentioned in clause No. B-10 by GEDA’s representative shall not relieve the Bidder from full responsibility of completing the work confirming to the requirement of this contract. B-18 Conditional tenders shall not be accepted.
  • 14. (Sign and Seal of the bidder) Page 14 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) 5.0 GUIDELINES and ELIGIBILITY CRITERIA FOR BIDDERS 1. INDICATIVE TARGETS: Tender is invited for Installation of Solar Photovoltaic System in the state of Gujarat during the year 2012-13 under the GEDA Solar PV Programme. The indicative quantities to be supplied, installed and commissioned during the year 2012-13 as per the below table : SOLAR PV ROOFTOP SYSTEM WITH BATTERY BANK (Quantity in Nos.) 1 kW system 25 2 kW system 25 3 kW system 25 5 kW system 25 GRID CONNECT SOLAR POWER GENERATING SYSTEM(Quantity in Nos.) 10 kW System 25 15 kW system 25 20 kW system 25 25 kW system 25 SOLAR PV HOME SYSTEMS 100 Nos. SOLAR PV STREET LIGHT SYSTEMS 100 Nos. 2. ELIGIBILITY: Only those bidders, who manufacture, at least one of the major items used in the lighting systems i.e. solar PV modules or storage battery or electronics, OR MNRE registered channel partners having adequate facilities for testing (i.e. digital DC power supply, Tongue tester, solarimeter, multimeters etc.) of solar lighting system would be allowed to supply the systems under the scheme. The bidder should submit the list and pictures of the manufacturing and testing facilities and submit an undertaking that if the details provided by the bidders are in deviation with the provision of the scheme, it will call for disqualification. If considered necessary, a team of GEDA official may visit the facilities of the bidders for verification. Companies which are engaged only in assembly of solar lighting systems with above mentioned bought out items will not be eligible for supply of systems under this scheme except MNRE registered Channel Partners. 3. It is mandatory to have valid IEC certificates for Solar panels & batteries; and certificates from National/NABL accredited laboratory for LED fixture as mentioned in the specifications, issued on or after 1st April 2011. Copies of such certificates should be attached /uploaded with the tender. Tenders received without test certificates as above will be rejected out-right and no correspondence will be entertained in this regards. 4. The PV modules must be tested and approved by one of the IEC authorized test centers. Test certificates can be from any of the NABL/ BIS Accredited Testing / Calibration Laboratories.
  • 15. (Sign and Seal of the bidder) Page 15 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) Qualification test certificate as per IEC standard, issued by the Solar Energy Centre for small capacity modules upto 37Wp capacity will also be valid. 5. Test certificates for the BoS items/ components can be from any of the NABL/ BIS Accredited Testing-Calibration Laboratories/ MNRE approved test centers. 6. The bidder should have supplied solar photovoltaic systems of the values Rs. 10 crores for grid connected systems and Rs. 5 crores for off-grid (stand alone ) systems, out of which Rs. 100 lacs and Rs. 50 lacs respectively for grid connected systems and off- grid (stand alone) systems; to any State Nodal Agencies/ Government Departments/ PSUs during the past three financial years and supplies against such work order should have completed satisfactorily as certified by the concerned State Nodal Agencies/ Government departments. 7. The bidder should have supplied a minimum 100 nos. solar photovoltaic systems, during the past three years and should be working satisfactorily, to any State Nodal Agency/ Government department/ PSUs. 8. SPECIFICATIONS: The specifications of SPV systems, for which tenders are invited, are annexed. 9. AFTER SALES SERVICES: Bidders should have well established network of service centers within the state and should have adequately trained staff available at service stations for repair and maintenance of Solar PV Systems. 10. Bidder will ensure that necessary spares are always available with their service centers to provide necessary after sales service to the customers during the warranty period. 11. LOI: Fax Letter of Intent (LOI) shall be issued to the shortlisted Bidders indicating the quantity allocated to them and the security deposit amount to be deposited by them with GEDA. Shortlisted Bidders will be required to deposit the requisite security deposit within one week of issuance of Fax Letter of Intent, failing which the letter of intent will stand as cancelled. The order will be issued to the shortlisted Bidders only after receipt of requisite security deposit. 12. SECURITY DEPOSIT: Bidders, to whom order is awarded for the year 2012-13 will be required to deposit security deposit of Rs.50,000/- or 3% of total order value awarded to them, which ever is more. The Security Deposit will be accepted in the form of Demand Draft issued by Nationalized Bank, ICICI Bank, IDBI Bank, UTI Bank, HDFC Bank in favour of Gujarat Energy Development Agency payable at Gandhinagar. The Security Deposit can also be submitted in the form of Bank Guarantee issued by Nationalized Bank, ICICI Bank, IDBI Bank, AXIS Bank, HDFC Bank, Kotak Mahindra Bank, Yes Bank, IndusInd Bank , Saurastra Gramin Bank, Baroda Gujarat Gramin Bank, Dena Gujarat Gramin Bank, The Kalupur Commercial Co-operative Bank Ltd. , Rajkot Nagrik Sahakari Bank Ltd. , The Ahmedabad Mercantile Co-operative Bank Ltd., The Mehsana Urban Co-operative Bank Ltd. as per GEDA’s format with validity of 180 days. The Security Deposit submitted in the form of Demand Draft will be retained till completion of the work .No interest will be paid on the Security Deposit. The Earnest Money Deposit of the successful bidders will be retained as security deposit and will form part of the total security deposit required to be deposited by the successful bidder.
  • 16. (Sign and Seal of the bidder) Page 16 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) 13. ADDITIONAL ORDER: In the event of awarding the order of additional quantity, the Bidder will be required to deposit additional Security Deposit on prorate basis within one week of the issuance of Fax LOI for the additional order quantity. 14. TIME SCHEDULE: It is very critical to complete the work as per the order given by the agency before January 31, 2013. To ascertain the manufacturing capabilities of each Bidder, no. of systems that could be supplied, installed and commissioned by the Bidder in the state, every Bidder is required to submit with their Technical offer, information about manufacturing capacity of their factory and no. of systems that could be supplied in the State. In the event of failure to supply no. of systems as per order, will lead to forfeiter of the Security Deposit up to 100% and will lead to disqualification of the Bidder for transacting business with GEDA for atleast three years or the time duration as may be decided by the Director, GEDA. 15. The Bidder shall arrange to provide to each beneficiary, a SPV instruction manual. The Bidder shall also arrange to instruct each beneficiary about routine maintenance procedure. 16. IDENTIFICATION MARK: Serial Number (identification mark) must be permanently marked on all major components (PCB, Battery, Module, Body etc.) of the SPV systems. Metallic number plates with serial numbers duly riveted or fixed with strong adhesive for non-metallic body, as approved by GEDA, shall be fixed on charge controller/ light fixture of each lot. 17. INSPECTION OF MATERIAL: he Bidder will offer Solar PV Systems for inspection at their works by GEDA or its authorized quality inspection agency. Inspection can also be offered at one place in Gujarat (main distributor’s place), where equivalent inspection facilities are available. GEDA may carry out random testing of SPV systems at Bidder’s factory for various parameters as per the specifications laid by GEDA. Visual inspection shall be carried for 100% of SPV systems. Bidder will intimate to GEDA in writing in advance for such inspections. If during the inspection the percentage of rejections exceeds 10% then the whole lot would be rejected. The rejected material is to be replaced with new material as per the specifications. The systems should be offered for inspection again after necessary rectification. Expenses for such re-inspection shall be borne by the Bidder. GEDA reserves the right to inspect any number of SPV systems, any number of times at the addresses of the beneficiaries given by the Bidder. 18. IDENTIFICATION OF BENEFICIARIES: GEDA has identified the site/ beneficiary after surveys and site details/ list of the beneficiaries shall be provided along with the order. All wiring shall be concealed/ in Rigid PVC pipe as per the requirement of site. For rooftop and grid connected systems all wiring shall be UV-resistant certified for solar application, concealed in galvanized cable trays with minimum 3 cm clearance from the terrace/ rooftop floor. 19. PAYMENTS The payment terms shall be as follows: a. 25 % of total order value shall be paid as an advance to the Tenderer against submission of bank guarantee of equivalent amount issued by Nationalized Bank, ICICI Bank, IDBI Bank, UTI Bank and HDFC Bank as per the prescribed format of GEDA, valid for the period of six months. b. 50 % total order value shall be released to the Tenderer after submission of following necessary documents in duplicate at GEDA and after on-site verification/ inspection by
  • 17. (Sign and Seal of the bidder) Page 17 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) GEDA and/or its authorized inspection agency/ies as per norms of GEDA, for which the claim is received: a. Bills b. Installation certificate duly signed by beneficiary showing its installation date. c. Security Deposit shall be released with this 50% payment of the order. d. 25% of the order value shall be paid against submission of Performance Bank Guarantee of equivalent amount valid for the period of 5 years. 20. OTHER TERMS & CONDITIONS: GEDA, at its discretion, may award work to more than one Bidder and will decide the quantity to be allocated to them. Decision of GEDA in this matter, will be binding to all the Bidders. 21. In case of any type of misappropriations, cheating or intention of cheating, frauds, irregularities, malpractice, etc. the Director GEDA reserves the right to cancel the order without giving reasons thereof and forfeit the security deposit. 22. Rates quoted by the Bidder will be inclusive of taxes, levies, duties, packing, forwarding, freight, insurance, loading unloading, supply, installation, commissioning, warranties and any/ all charges for successful Supply and Installation of the system at any locations in the State of Gujarat and all expenses of marketing, commissions etc 23. The rates quoted by the Bidder will be inclusive of Service Tax, Work Contract Tax, VAT or any other taxes applicable for such work. Any escalation in such taxes/ levies during the tenure of the contract/order, will not be paid by GEDA and Bidders are advised to take in to consideration any such escalations in the prevailing taxes/levies/duties. 24. During site inspection by GEDA staff/ authorized representative, if the systems are found uninstalled and false report of installation and commissioning is submitted to GEDA for claiming payment, Director, GEDA is empowered to forfeit Security Deposit up to 100% & to terminate the contract. 25. Bidders are required to quote rates inclusive of Comprehensive Maintenance Contact (CMC) for the period of five years for the system. The rates quoted should be should be inclusive of charges for providing routine maintenance services at the beneficiary’s end to ensure smooth and satisfactory performance of the system. Replacement of any components of the system is included in the scope of work of CMC. As per the format given in the bid document quarterly report should be prepared and submitted to GEDA after providing necessary services. 26. Training of representative of the beneficiary on the aspect of primary trouble shooting and Do’s & Don’ts of the SPV systems, including general operation and maintenance, including lodging complaints & primary reporting.
  • 18. (Sign and Seal of the bidder) Page 18 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) 6.0 TENDER EVALUATION CRITERIA Offers of only those parties who are found qualifying based of following Tender Evaluation Criteria will be taken in to further consideration and prices of only those parties qualifying based of these criterion will be opened. COMMERCIAL 1) Earnest Money Deposit and Tender Document Fee in the prescribed form should be submitted along with the tender. 2) The company should have supplied PV systems of Rs. 300 lacs in past three years as per clause no.6, 7, 8 of Chapter no. 5. TECHNICAL 1) Only those bidders as defined in Chapter no. 5 Clause 2, who manufacture at least one of the major items used in the lighting systems i.e. solar PV modules or storage battery or electronics, OR MNRE registered channel partners having adequate facilities for testing (i.e. digital DC power supply, Tongue tester, solarimeter, multimeters etc.) of solar lighting system would be allowed to supply the systems under the scheme. The bidder should submit the list and pictures of the manufacturing and testing facilities and submit an undertaking that if the details provided by the bidders are in deviation with the provision of the scheme, it will call for disqualification. If considered necessary, a team of GEDA official may visit the facilities of the bidders for verification. Companies which are engaged only in assembly of solar lighting systems with above mentioned bought out items will not be eligible for supply of systems under this scheme. 2) The bidder should have valid test certificates as per required specifications for supply under tender and submit the copy of test reports. 3) Offers received from only those parties having adequate infrastructure to manufacture, Market and provide after sales services in the state will be taken in to consideration and offers received from others will be summarily rejected. Documentary evidences in support of the same should be enclosed with the offer. GEDA may visit manufacturing facilities to ascertain the claims made by the Bidder. 4) Details of similar work done in last three years along with copies of the orders and certificates from the user agencies should be submitted along with the Technical Offer as per Annexure – 2 of the Offer Document. 5) The party should have sufficient technically qualified and well-experienced manpower for Manufacturing, Marketing, and Installation and after sales service of the systems. Brief bio-data of the key personnel be enclosed with the offers as per Annexure-3 of the Document. GENERAL 1) The party should have declared, if any relatives working with GEDA in Annexure – 4. 2) As an acceptance of terms and conditions, the document duly signed and sealed on every page should be returned along with the offer. Offers not satisfying any of the above mentioned criteria will be liable for rejection.
  • 19. (Sign and Seal of the bidder) Page 19 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) Annexure 2: Details of similar work experience in last three years (Information to be attached with the Technical Offer) Sr. No. Name of the Company with full address, phone, fax and name of contact person Work Description Ref. and date of the order Work Order Value Details of order and its configuration  Copies of Work orders along with Work completion certificates should be attached with this information.  If necessary, separate sheet may be used to submit the information.
  • 20. (Sign and Seal of the bidder) Page 20 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) Annexure 3: Details of Technical staff available with the company for execution of work (Information to be attached with the Technical Offer) Sr. No . Name Qualification Additional Certificati on, if any Total Experience , no. of years Remarks  Copies of Resumes and appropriate certifications should be attached with this information.  If necessary, separate sheet may be used to submit the information.
  • 21. Annexure 4: DECLARATION (Strike off whichever is not applicable) This is to declare that Mr/Ms. __________________________________, employee of GEDA at _____________________(place), is related to our ___________________________ _______________________(designation and name). OR This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or working with Gujarat Energy Development Agency at any of its offices or its parent Department i.e. Energy and Petrochemicals Dept., Govt. of Gujarat. Date : Sign. and Stamp of the Tenderer
  • 22. (Sign and Seal of the bidder) Page 22 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) Annexure 5: DEVIATION SHEET Any deviations offered from the terms and conditions of the Offer should be clearly specified below in this sheet. If there are no deviations offered, it should be clearly mentioned on this page. Deviation offered to Chapter No, Clause No. of the tender document Deviation offered
  • 23. (Sign and Seal of the bidder) Page 23 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) QUARTERLY MAINTENANCE & SERVICING REPORT FORMAT 1. DETAILS OF SOLAR PHOTOVOLTAIC SYSTEM INSTALLED 1. Supplied by : 2. Date of installation : 3. Servicing period : From to 2. USER PROFILE 1. Name and address of User: 3. TECHNICAL DETAILS 1. Module Capacity, make and serial number : 2. Battery Capacity, make and serial number : 3. DC fan make and serial number : 4. CHECK OF THE PRODUCT 1. Correct inclination and orientation of SPV panel : 2. Cleaning of dust from SPV panel : 3. Interconnection of modules, charge controller, battery etc.: 4. Fuse of charge controller, light fixture, fan & switches : 5. Battery Voltage as measured by multimeter: : 6. Cleaning of battery terminals and providing petroleum jelly: 7. Topping up of battery with distilled water/ acid : 5. DIFFICULTIES IN OPERATION/ PROBLEM FACED BY USER: 6. DIAGNOSIS DETAILS/ REPAIR ACTION: 7. DATE ON WHICH SYSTEM WAS LAST ATTENDED: 8. REMARKS: User Name & Signature Technician’s Name & Signature Date: (with rubber stamp)
  • 24. (Sign and Seal of the bidder) Page 24 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) Appendix I FORMAT FOR WARRANTY CARD TO BE SUPPLIED WITH EACH SOLAR PV SYSTEM 1. Name & Address of The Bidder/Bidder of the System 2. Name & Address of Purchasing Agency 3. Date of supply of the system 4. Details of PV Module (s) supplied in the System Make (Name of the Bidder) Model Serial No(s) Wattage of the PV Module (s) under STC Warranty valid up to 5 Details of Battery System Make (Name of the Bidder) Model Batch/Serial No(s) Rated V & AH capacity at C/20 or C/10 rate at 20 C Warranty valid up to 6 Details of PCU/ Electronics & other BOS items/ cables. System Make (Name of the Bidder) Model Serial No(s) Warranty valid up to 7 Designation & Address of the person to be Contacted for claiming Warranty obligations. (Signature) Name & Designation Name & Address of the Bidder/bidder (SEAL) Place & Date: (During the warranty period State Agencies/users reserves the right to cross check the performance of the systems with the minimum performance levels specified in the specifications).
  • 25. (Sign and Seal of the bidder) Page 25 of 25 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--11)) Annexure 6:List of Plant and Machinery (To be completely filled by the tenderer) For manufacturing of Solar PV panels ( as applicable) S. No. Name of equipment Date of purchase Date of calibration Utility For manufacturing of electronics ( as applicable) S. No. Name of equipment Date of purchase Date of calibration Utility For manufacturing of Battery ( as applicable) S. No. Name of equipment Date of purchase Date of calibration Utility