Advertisement

Earthquake of 2005 & 2015

Feb. 11, 2016
Advertisement

More Related Content

Advertisement

Earthquake of 2005 & 2015

  1. Hassam Bin Ayub Reg # Bmba151006
  2. A sudden violent shaking of the ground, typically causing great destruction, as a result of movements within the earth's crust or volcanic action.
  3. Tectonic Volcanic Collapse Explosion
  4. The moment magnitude scale is used to measure the size of earthquake in terms of energy. The scale was developed in 1970’s to succeed the 1930’s-era Richter magnitude scale (Ml). Richter scale is improved from of Marcalli scale.
  5. Value Potential Hazard
  6. Earthquake Details Magnitude • 7.6 Location • Muzafferabad.AJK Depth • 26km (16.2 Miles) Distance 100Km From Islamabad
  7. Magnitude • 8.1 Date & Time • Monday, Oct 26,2015 at 1:50pm. Location • In Btw Afghanistan & Tajikistan. Depth 193km
  8. Both Earthquake’s are due to movement of tectonic plates and seismic waves,. The Movement of Earthquake of 2005 was vertical. The Movement of earthquake 2015 was Horizontal.
  9. Aftershocks of 2005 was 16 in first week. Aftershocks of 2015 was 200 in first week.
  10. SER Provinces Deaths Injured Houses Damaged 1 Khyber Pakhtunkhwa 31,928 24,695 666,9,632 2 Punjab 1,789 6,763 5,624 3 Sindh 283 648 125 4 Ajk & Gilgit Baltistan 53,000 67,894 66,503 Grand Total 87,000 100,000 141,884
  11. SER Provinces Deaths Injured Houses Damaged 1 Khyber Pakhtunkhwa 225 1,756 25,636 2 Punjab 5 80 20 3 FATA 29 209 9,534 4 Ajk & Gilgit Baltistan 12 101 595 Grand Total 271 2,148 35,785
  12. Died Houses Injured 271 171884 100000 87000 35785 2148 Chart Title Series 1 Series 2
  13. The Govt. of Pakistan established Earthquake Reconstruction & Rehabilitation Authority (ERRA) on 24 oct,2005 to rebuild the earthquake affected regions.
  14. National Disaster Management Authority (NDMA), is the lead agency at Federal level to deal with Disaster Management Activities.
  15. No horizontal Bond Beams at base of walls. No Vertical members of concrete provided in walls. Stone masonry buildings ( Poor bonding).
  16. Lack of Latest equipment. Lack of Govt. Funding. Lack of implementation of Seismic Building code. Lack of Awareness. Poverty.
Advertisement