  1. 1. River Road Area Sewer Improvements Neighborhood Advisory Committee July 22, 2004
  2. 2. Today’s Meeting <ul><li>Program Review </li></ul><ul><li>River Road Projects </li></ul><ul><ul><li>EQ Basin/Pump Station - Brookford Park </li></ul></ul><ul><ul><li>Sewer installation </li></ul></ul><ul><ul><li>Force main installation </li></ul></ul><ul><li>Next Meeting Date </li></ul>
  3. 3. Program Review <ul><li>4 Sanitary Sewer Overflows in River Road Area </li></ul><ul><li>Must be eliminated by November of 2006 </li></ul><ul><ul><li>Stiff penalties for missed deadlines </li></ul></ul>
  4. 4. Proposed River Road Area Projects <ul><li>Underground Equalization Basin – River Road Park </li></ul><ul><li>Underground Pump Station – River Road Park </li></ul><ul><li>New Force Main Sewer – Brookford Drive </li></ul><ul><li>New Relief Sewer– Beverly and River Road </li></ul><ul><li>Beverly Pump Station – West of Trail </li></ul>
  5. 5. Project Schedules <ul><li>Projects will be built concurrently </li></ul><ul><li>Construction bids – October/November 2004 </li></ul><ul><li>Break Ground – Spring 2005 </li></ul><ul><li>Completed by November 2006 </li></ul>
  6. 6. Equalization Basin <ul><li>Underground facility </li></ul><ul><ul><li>3 million gallon storage capacity </li></ul></ul><ul><ul><li>120 ft. x 240 ft. </li></ul></ul><ul><ul><li>17 ft. deep </li></ul></ul><ul><li>To be located at River Road Park ball diamond site </li></ul><ul><ul><li>Tanks from old Toledo Water Plant currently located there </li></ul></ul>
  7. 7. Equalization Basin
  8. 8. Equalization Basin Issues & Discussion <ul><li>Construction Access Road </li></ul><ul><ul><li>From River Road to site (between playgrounds) </li></ul></ul><ul><ul><li>Reduces amount of construction equipment entering site from Brookford </li></ul></ul><ul><li>Grading </li></ul><ul><ul><ul><li>Part of Treatment Plant project </li></ul></ul></ul><ul><ul><li>Fill to reorient sledding hill </li></ul></ul><ul><ul><li>Fill to shift baseball diamond to west </li></ul></ul><ul><ul><li>Fill to improve park-like setting </li></ul></ul>
  9. 9. Issues and Discussion Continued <ul><li>Baseball diamond </li></ul><ul><ul><li>Will be lost for one season due to construction </li></ul></ul><ul><ul><li>Options for replacement of the field </li></ul></ul><ul><ul><ul><li>Outfield </li></ul></ul></ul><ul><ul><ul><li>Parking </li></ul></ul></ul><ul><ul><ul><li>Bleachers </li></ul></ul></ul><ul><li>Maintenance building </li></ul><ul><ul><li>City reviewing options </li></ul></ul>
  10. 10. River Road Park Pump Station <ul><li>Located next to Equalization Basin </li></ul><ul><li>Bulk of facility underground </li></ul><ul><li>Electrical panel above ground </li></ul>
  11. 11. Force Main Sewer <ul><li>New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin </li></ul><ul><li>To be located on south side of Brookford </li></ul><ul><li>Shouldn’t disturb street – except for crossings at OLPH and Island Avenue </li></ul><ul><li>Traffic maintained </li></ul><ul><ul><li>Will work with committee to minimize disruption </li></ul></ul>
  12. 12. New Relief Sewers <ul><li>From River Road, Midland or Hemlock down River Road to Brookford </li></ul><ul><ul><li>New water line will be installed at same time </li></ul></ul><ul><ul><ul><li>Should help resolve water pressure problems </li></ul></ul></ul><ul><ul><li>Preferred sewer location is in east lane of River Road </li></ul></ul>
  13. 13. New Relief Sewers <ul><li>On Beverly from Brookford to Medford </li></ul><ul><li>Both relief sewer lines should help reduce basement flooding in area </li></ul><ul><li>Traffic control </li></ul>
  14. 14. Beverly Pump Station <ul><li>Underground – with electrical panel(s) above ground </li></ul><ul><li>Will pump waste from Beverly sewer to new EQ basin </li></ul>
  15. 15. Comment <ul><li>Questions </li></ul><ul><li>Discussion </li></ul>
  16. 16. Future Meetings <ul><li>Next meeting date? </li></ul><ul><li>Best time and location? </li></ul>

×