  1. 1. Duplex_Cost Summary_05.05.15 Job DescriptionJob Name : BUILDER SAMPLE Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Client's Name: Builder sample m2Cost/TradeTrade DescriptionTrd Trade TotalNo. % 107,525PRELIMINARIES 11.93 289.051 23,629DEMOLITION & EXCAVATION 2.62 63.522 76,329CONCRETE 8.47 205.193 75,970BRICKWORK / BLOCKWORK 8.43 204.224 15,760WINDOWS & GLAZING 1.75 42.375 7,056STRUCTURAL STEEL 0.78 18.976 15,400METAL WORK 1.71 41.407 40,690ROOFING 4.51 109.388 95,570CARPENTRY 10.60 256.919 27,800JOINERY 3.08 74.7310 26,820FIXTURES & FITTINGS 2.98 72.1011 10,605WATERPROOFING 1.18 28.5112 35,135TILING 3.90 94.4513 55,610PLASTERING 6.17 149.4914 13,450CARPET 1.49 36.1615 16,450RENDERING 1.83 44.2216 26,290PAINTING 2.92 70.6717 43,465HYDRAULIC SERVICES (PROVISIONAL SUM) 4.82 116.8418 24,820ELECTRICAL SERVICES (PROVISIONAL SUM) 2.75 66.7219 5,000MECHANICAL SERVICES (PROVISIONAL SUM) 0.55 13.4420 35,465EXTERNAL WORKS 3.93 95.3421 1,488FINAL CLEAN 0.17 4.0022 39,017BUILDR'S MARGIN @ 5% 4.33 104.8823 Subtotal24 819,344 81,935GST 9.09 220.2625 CLARIFICATIONS26 901,279100.00 2,422.79GFA: 372 m2. $ 901,279Final Total : Page : 1NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: Global Estimating System (32 Bit) - H10 FIRST AVE BERALA NSW 2141 of 1 SAM PLE
  2. 2. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. PRELIMINARIESTrade : 1 PRELIMINARIES 1.00 ItemHome Warranty Insurance @ 0.079% of construction cost 1 6,554.51 6,554.52 36.00 WeeksSite Foreman (3 days a week)2 1,080.00 38,880.00 36.00 WeeksLabourer (3 days a week)3 840.00 30,240.00 16.00 mSite fencing and temporary public access4 75.00 1,200.00 1.00 ItemSediment control5 1,000.00 1,000.00 2.00 ItemScaffold setup / dismantle6 2,500.00 5,000.00 470.00 m2Scaffold hire (1 month only)7 25.00 11,750.00 36.00 WeeksTemp Services8 50.00 1,800.00 36.00 WeeksOnsite toilet facilities9 100.00 3,600.00 10.00 WeeksSkip Bins10 450.00 4,500.00 2.00 ItemSurveyor11 1,500.00 3,000.00 PRELIMINARIES Total : 107,524.52 DEMOLITION & EXCAVATIONTrade : 2 DEMOLITION & EXCAVATION Demolition 1.00 ItemDemolish existing structures1 15,000.00 15,000.00 Excavation 576.00 m2Site clearance2 4.00 2,304.00 145.00 m3Bulk excavation3 35.00 5,075.00 10.00 m3Detailed excavation4 125.00 1,250.00 DEMOLITION & EXCAVATION Total : 23,629.00 CONCRETETrade : 3 CONCRETE Onsite Detention Tank (Both Duplex) 4.00 m3Concrete footings :[34 m]1 400.00 1,600.00 5.00 m3150mm thick concrete slab onground :[32 m2]2 400.00 2,000.00 7.00 m3200mm thick suspended concrete slab :[32 m2]3 220.00 1,540.00 Page : 1NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  3. 3. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. CONCRETETrade : 3 (Continued) 41.00 m2Bondek to suspended slab4 85.00 3,485.00 1.00 TonneReinforcement to suspended slab (120kg/m3)5 1,300.00 1,300.00 Ground Floor 81.00 m300mm DIA concrete piers max 1m depth :[81 No] 6 195.00 15,795.00 9.00 m3Concrete footings :[97 m]7 400.00 3,600.00 289.00 m2Waffle pod concrete slab onground8 135.00 39,015.00 Steps 2.00 ItemExternal concrete steps9 1,500.00 3,000.00 Sundries 1.00 ItemDrains/sumps/cure/joints/pump/test/etc10 4,993.45 4,993.45 CONCRETE Total : 76,328.45 BRICKWORK / BLOCKWORKTrade : 4 BRICKWORK / BLOCKWORK Onsite Detention Tank 41.00 m21200mm high concrete corefilled block walling :[34 m] 1 190.00 7,790.00 Ground Floor 219.00 m2Single skin common brick veneer walling :[68 m]2 90.00 19,710.00 39.00 m2Double skin common brick external walling :[11 m] 3 160.00 6,240.00 57.00 m2Double skin common brick party walling :[16 m]4 160.00 9,120.00 4.00 NoCommon brick columns5 450.00 1,800.00 First Floor 133.00 m2Single skin common brick veneer walling :[51 m]6 90.00 11,970.00 45.00 m2Double skin common brick party walling :[15 m]7 160.00 7,200.00 10.00 m2Double skin common brick balustrade walling :[8 m] 8 160.00 1,600.00 Sundries 68.00 mTermite treatment9 30.00 2,040.00 34.00 ThouMud, dpc, lintels, etc10 250.00 8,500.00 BRICKWORK / BLOCKWORK Total : 75,970.00 Page : 2NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  4. 4. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. WINDOWS & GLAZINGTrade : 5 WINDOWS & GLAZING Ground Floor 15.00 m2Aluminium framed windows :[10 No]1 300.00 4,500.00 9.00 m2Aluminium framed doors :[2 No]2 320.00 2,880.00 First Floor 11.00 m2Aluminium framed windows :[8 No]3 300.00 3,300.00 9.00 m2Aluminium framed doors :[2 No]4 320.00 2,880.00 Sundries 44.00 m2Flyscreens5 50.00 2,200.00 WINDOWS & GLAZING Total : 15,760.00 STRUCTURAL STEELTrade : 6 STRUCTURAL STEEL 0.60 TonneStructural Steel1 10,500.00 6,300.00 1.00 ItemBolts, plates, braces etc.. @ 12%2 756.00 756.00 STRUCTURAL STEEL Total : 7,056.00 METAL WORKTrade : 7 METAL WORK Duplex A 6.00 mBalustrade allowance to internal stair1 350.00 2,100.00 3.00 mGrated drain to garage entry2 250.00 750.00 1.00 ItemAutomated panel lift garage door3 3,000.00 3,000.00 1.00 ItemClothes line4 550.00 550.00 1.00 ItemLetter box5 250.00 250.00 1.00 ItemSignage6 150.00 150.00 Duplex B 6.00 mBalustrade allowance to internal stair7 350.00 2,100.00 4.00 mGlazed balustrade to first floor balcony8 450.00 1,800.00 3.00 mGrated drain to garage entry9 250.00 750.00 1.00 ItemAutomated panel lift garage door10 3,000.00 3,000.00 Page : 3NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  5. 5. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. METAL WORKTrade : 7 (Continued) 1.00 ItemClothes line11 550.00 550.00 1.00 ItemLetter box12 250.00 250.00 1.00 ItemSignage13 150.00 150.00 METAL WORK Total : 15,400.00 ROOFINGTrade : 8 ROOFING 1.00 ItemAllowance for tarp protection during construction 1 1,000.00 1,000.00 321.00 m2Metal roof sheeting2 65.00 20,865.00 321.00 m2EO insulation3 10.00 3,210.00 130.00 mFascia4 45.00 5,850.00 98.00 mGutter5 55.00 5,390.00 65.00 m2Eaves lining6 35.00 2,275.00 42.00 mDownpipes :[8 No]7 50.00 2,100.00 ROOFING Total : 40,690.00 CARPENTRYTrade : 9 CARPENTRY Doors 2.00 NoExternal entry door1 850.00 1,700.00 2.00 NoExternal solidcore door to laundry2 450.00 900.00 16.00 NoInternal single leaf solidcore door3 250.00 4,000.00 2.00 NoInternal single cavity sliding solidcore door to ensuites 4 300.00 600.00 22.00 NoDoor hardware5 80.00 1,760.00 Framing 173.00 m2Timber floor framing incl. 1 layer of yellow tongue cladding 6 75.00 12,975.00 321.00 m2Timber roof framing7 85.00 27,285.00 352.00 m2External timber stud walling :[352 m]8 35.00 12,320.00 310.00 m2Internal timber stud walling :[106 m]9 35.00 10,850.00 Page : 4NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  6. 6. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. CARPENTRYTrade : 9 (Continued) Stairs 2.00 ItemTimber internal stairs10 7,500.00 15,000.00 Window Install 64.00 HrsCarpentry labour11 45.00 2,880.00 1.00 ItemSundries12 500.00 500.00 Architraves / Skirting 2.00 ItemArchitraves allowance - Provisional Sum13 1,200.00 2,400.00 2.00 ItemSkirting allowance - Provisional Sum14 1,200.00 2,400.00 CARPENTRY Total : 95,570.00 JOINERYTrade : 10 JOINERY Kitchen 2.00 ItemKitchen joinery with overhead cupboards + breakfast bar in 2pac polyurethane finish incl. 20mm thick stone benchtop 1 9,000.00 18,000.00 2.00 ItemColourbacked glass splashback2 1,500.00 3,000.00 Bedrooms 4.00 NoBuilt in robe3 850.00 3,400.00 6.00 mWalk in robe :[2 No]4 350.00 2,100.00 Hallway 2.00 NoLinen cupboard incl. door and hardware5 650.00 1,300.00 JOINERY Total : 27,800.00 FIXTURES & FITTINGSTrade : 11 FIXTURES & FITTINGS Ground Floor Kitchen 2.00 ItemKitchen sink1 350.00 700.00 2.00 ItemMixer2 80.00 160.00 2.00 ItemCooktop3 450.00 900.00 2.00 ItemOven4 950.00 1,900.00 Page : 5NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  7. 7. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. FIXTURES & FITTINGSTrade : 11 (Continued) 2.00 ItemRangehood5 400.00 800.00 2.00 ItemDishwasher6 950.00 1,900.00 Powder Room 2.00 ItemToilet suite7 250.00 500.00 2.00 ItemToilet roll holder8 50.00 100.00 2.00 ItemWall hung basin9 300.00 600.00 2.00 ItemMixer10 60.00 120.00 2.00 ItemMirror11 100.00 200.00 2.00 ItemSoap holder12 50.00 100.00 2.00 ItemTowel Rack13 60.00 120.00 2.00 ItemCoat hook14 50.00 100.00 Laundry 2.00 ItemLaundry tub15 250.00 500.00 2.00 ItemMixer16 60.00 120.00 2.00 ItemWashing machine cocks17 50.00 100.00 2.00 ItemToilet suite18 350.00 700.00 2.00 ItemToilet roll holder19 50.00 100.00 2.00 ItemSoap holder20 50.00 100.00 2.00 ItemTowel Rack21 60.00 120.00 2.00 ItemCoat hook22 50.00 100.00 2.00 ItemFrameless shower screen23 1,500.00 3,000.00 2.00 ItemShower set24 350.00 700.00 First Floor Bathrooms 2.00 ItemToilet suite25 250.00 500.00 2.00 ItemToilet roll holder26 50.00 100.00 2.00 ItemVanity basin27 300.00 600.00 2.00 ItemMixer28 60.00 120.00 2.00 ItemMirror29 150.00 300.00 2.00 ItemSoap holder30 50.00 100.00 2.00 ItemTowel Rack31 60.00 120.00 Page : 6NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  8. 8. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. FIXTURES & FITTINGSTrade : 11 (Continued) 2.00 ItemCoat hook32 50.00 100.00 2.00 ItemFrameless shower screen33 1,500.00 3,000.00 2.00 ItemShower set34 350.00 700.00 2.00 ItemBath tub35 750.00 1,500.00 2.00 ItemBath set36 150.00 300.00 Ensuites 2.00 ItemToilet suite37 250.00 500.00 2.00 ItemToilet roll holder38 50.00 100.00 2.00 ItemVanity basin39 300.00 600.00 2.00 ItemMixer40 60.00 120.00 2.00 ItemMirror41 150.00 300.00 2.00 ItemSoap holder42 50.00 100.00 2.00 ItemTowel Rack43 60.00 120.00 2.00 ItemCoat hook44 50.00 100.00 2.00 ItemFrameless shower screen45 1,500.00 3,000.00 2.00 ItemShower set46 350.00 700.00 FIXTURES & FITTINGS Total : 26,820.00 WATERPROOFINGTrade : 12 WATERPROOFING 38.00 m2Waterproof wet area floors1 35.00 1,330.00 99.00 m2Waterproof wet area walls2 35.00 3,465.00 102.00 m2Waterproof membrane to onsite detention tank3 35.00 3,570.00 14.00 m2Waterproof porch4 35.00 490.00 38.00 m2Waterproof alfresco5 35.00 1,330.00 12.00 m2Waterproof balcony6 35.00 420.00 WATERPROOFING Total : 10,605.00 TILINGTrade : 13 TILING Page : 7NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  9. 9. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. TILINGTrade : 13 (Continued) 64.00 m2Screed to correct falls to porch / alfresco / wet areas / balcony 1 35.00 2,240.00 38.00 m2Supply and fix floor tiles to wet areas (PC Sum Supply $40/m2) 2 85.00 3,230.00 153.00 m2Supply and fix wall tiles to wet areas (PC Sum Supply $40/m2) 3 85.00 13,005.00 94.00 m2Supply and fix floor tiles to kitchen / living / dining (PC Sum Supply $40/m2) 4 85.00 7,990.00 12.00 m2Supply and fix floor tiles to understair storage (PC Sum Supply $40/m2) 5 85.00 1,020.00 26.00 m2Supply and fix floor tiles to retreat (PC Sum Supply $40/m2) 6 85.00 2,210.00 14.00 m2Supply and fix floor tiles to porch (PC Sum Supply $40/m2) 7 85.00 1,190.00 38.00 m2Supply and fix floor tiles to alfresco (PC Sum Supply $40/m2) 8 85.00 3,230.00 12.00 m2Supply and fix floor tiles to balcony (PC Sum Supply $40/m2) 9 85.00 1,020.00 TILING Total : 35,135.00 PLASTERINGTrade : 14 PLASTERING Ceilings 312.00 m2Plasterboard suspended ceiling1 25.00 7,800.00 88.00 m2Moisture resistant plasterboard ceiling2 35.00 3,080.00 380.00 mCornice3 25.00 9,500.00 2.00 NoCeiling access panels4 350.00 700.00 Walls 798.00 m2Internal plasterboard lining5 25.00 19,950.00 174.00 m2Villaboard lining6 35.00 6,090.00 662.00 m2Insulation7 10.00 6,620.00 Floors 22.00 m2CFC lining to first floor wet areas8 55.00 1,210.00 12.00 m2CFC lining to first floor balcony9 55.00 660.00 PLASTERING Total : 55,610.00 Page : 8NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  10. 10. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. CARPETTrade : 15 CARPET 100.00 m2Carpet to bedrooms1 65.00 6,500.00 30.00 m2Carpet to hallway on first floor2 65.00 1,950.00 2.00 ItemCarpet covering to internal stairs3 2,500.00 5,000.00 CARPET Total : 13,450.00 RENDERINGTrade : 16 RENDERING 470.00 m2Sand and cement render to external facade1 35.00 16,450.00 RENDERING Total : 16,450.00 PAINTINGTrade : 17 PAINTING 798.00 m2Paint to new internal walls1 10.00 7,980.00 400.00 m2Paint to set ceiling2 12.00 4,800.00 22.00 NoPaint to doors3 80.00 1,760.00 470.00 m2Paint external walls4 25.00 11,750.00 PAINTING Total : 26,290.00 HYDRAULIC SERVICES (PROVISIONAL SUM)Trade : 18 HYDRAULIC SERVICES (PROVISIONAL SUM) 2.00 ItemSewer connection1 750.00 1,500.00 2.00 ItemStormwater connection2 750.00 1,500.00 2.00 ItemWater supply in3 850.00 1,700.00 2.00 ItemGas supply in4 1,000.00 2,000.00 2.00 ItemBoundary trap5 550.00 1,100.00 80.00 mSewer line rough-in6 65.00 5,200.00 141.00 mStormwater line rough-in7 65.00 9,165.00 2.00 NoSewer Pit8 500.00 1,000.00 16.00 NoStormwater Pit9 100.00 1,600.00 Page : 9NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  11. 11. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. HYDRAULIC SERVICES (PROVISIONAL SUM)Trade : 18 (Continued) 4.00 NoGas bayonets10 200.00 800.00 2.00 NoExternal hose cocks11 150.00 300.00 2.00 NoUnder slab sewer lines12 500.00 1,000.00 2.00 NoHeat insulation to pipework (lagging)13 350.00 700.00 2.00 NoConduits to floor14 450.00 900.00 2.00 NoFloor wastes15 700.00 1,400.00 2.00 NoStacks16 600.00 1,200.00 2.00 NoInstantaneous HWU17 1,200.00 2,400.00 2.00 NoInitial fix18 1,000.00 2,000.00 2.00 NoFinial fix19 1,000.00 2,000.00 2.00 NoRainwater tank20 3,000.00 6,000.00 HYDRAULIC SERVICES (PROVISIONAL SUM) Total : 43,465.00 ELECTRICAL SERVICES (PROVISIONAL SUM)Trade : 19 ELECTRICAL SERVICES (PROVISIONAL SUM) 2.00 ItemElectrical Supply1 1,200.00 2,400.00 2.00 ItemMainboard2 1,000.00 2,000.00 60.00 NoDouble GPO3 110.00 6,600.00 2.00 NoLighting allowance incl. install4 5,000.00 10,000.00 4.00 NoHardwired smoke alarm5 150.00 600.00 6.00 NoData outlet6 160.00 960.00 4.00 NoPhone outlet7 160.00 640.00 2.00 ItemTV antenna8 250.00 500.00 4.00 NoTV outlet9 280.00 1,120.00 ELECTRICAL SERVICES (PROVISIONAL SUM) Total : 24,820.00 MECHANICAL SERVICES (PROVISIONAL SUM)Trade : 20 MECHANICAL SERVICES (PROVISIONAL SUM) 8.00 NoWet area ventilation1 250.00 2,000.00 2.00 NoSplit system air conditioning to living room only2 1,500.00 3,000.00 Page : 10NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  12. 12. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. MECHANICAL SERVICES (PROVISIONAL SUM) Total : 5,000.00 EXTERNAL WORKSTrade : 21 EXTERNAL WORKS 2.00 ItemCrossover1 3,500.00 7,000.00 61.00 m2Concrete driveway incl. stencilling2 135.00 8,235.00 160.00 m2Turf over site3 20.00 3,200.00 60.00 m2Gravel mulch4 20.00 1,200.00 46.00 m2Planters5 80.00 3,680.00 75.00 m2Planter edging allowance incl. agglines + bitumen paint 6 130.00 9,750.00 2.00 ItemIrrigation system7 1,200.00 2,400.00 8 NoteNo allowance for council works9 EXTERNAL WORKS Total : 35,465.00 FINAL CLEANTrade : 22 FINAL CLEAN 372.00 m2Final clean of site once construction has been completed 1 4.00 1,488.00 FINAL CLEAN Total : 1,488.00 BUILDR'S MARGIN @ 5%Trade : 23 BUILDR'S MARGIN @ 5% 1.00 ItemBuilder's margin @ 5% of construction cost1 39,016.35 39,016.35 BUILDR'S MARGIN @ 5% Total : 39,016.35 SubtotalTrade : 24 Subtotal Total : GSTTrade : 25 GST Page : 11NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  13. 13. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. GSTTrade : 25 (Continued) 1.00 ItemGood & Services tax @ 10% of construction cost1 81,934.40 81,934.40 GST Total : 81,934.40 CLARIFICATIONSTrade : 26 CLARIFICATIONS We have made an allowance for the following NoteAllowance for demolition1 NoteAllowance for stormwater system where required2 NoteAllowance for finishes as per spec3 NoteAllowance for certified waterproofing4 NoteAllowance for mechanical ventilation5 NoteAllowance for split system air conditioning6 NoteAllowance for hard wired smoke detectors7 NoteAllowance for irrigation system8 NoteA construction period of 36 weeks9 We have made no allowance for the following NoteNo allowance for works other than specified10 NoteNo allowance for any repairs to existing faulty structures / services / finishes / landscaping 11 NoteNo allowance for site remediation and decontamination 12 NoteNo allowance for services diversions, easements, encasements or the like 13 NoteNo allowance for placing cables underground14 NoteNo allowance for Council works15 NoteNo allowance for smart system wiring16 NoteNo allowance for Water or Energy Authorities requirements 17 NoteNo allowance for contingency. We recommend a contingency of 5% be allowed over the entire project 18 NoteNo allowance for escalation in costs and union enterprise bargaining costs 19 NoteNo allowance for any cost increases associated with the 10% GST 20 NoteNo allowance for consultant Fees or PCA21 Page : 12NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE
  14. 14. Duplex_Cost Break Up_05.05.15 Job Name : BUILDER SAMPLE Job Description Client's Name: Builder sample Demolition of existing dwelling incl. construction of Attached Dual Occupancy incl. site works Item DescriptionItem AmountRateUnitQuantity No. CLARIFICATIONSTrade : 26 (Continued) NoteNo allowance for Council contributions, design fees, bank fees and charges, marketing, leasing and selling costs 22 Note on Variations NoteAny variation of the contract will be submitted to the client in writing and require the client's written approval and consent before the variation works is to proceed 23 Disclaimer NoteThis report is for use by the party to whom it is addressed and for no other purposes. No responsibility is taken for any third party who may use or rely on the whole or any part of this report 24 NoteAll quantities are approximate only25 NoteUnder no circumstances are the quantities or rates to form part of the building contract 26 CLARIFICATIONS Total : Page : 13NEWIN ESTIMATING SERVICE 5/May/15Date of Printing: - H10 FIRST AVE BERALA NSW 2141 Global Estimating System (32 Bit) of 13 SAM PLE

×