Tunnel Monitoring Conference 28 Nov 2003

  1. 1. Developing an Operational Automated Real Time Tunnel Monitoring System by G. H. Tan SysEng (S) Pte Ltd K. G. Chua Wisescan Engineering Services Pte Ltd
  2. 2. • LTA code of practice allows less than 15mm movements along the segments • Tunnel distortion allowable is 1/2000 • Continuously monitors the prisms every 8 hours per day for 7 days a week • Reliable System up time with financial penalty imposed for delay or loss of data • Real time measurement and immediate data transmission of results • Immediate alerts if the movement exceeds 70% of allowable movement
  3. 3. Data Transfer Challenges • No interference of any Radio Communication channels • Only IDA approved frequency allowed • No antenna mast allowed on site • Limited site access • First time right in concept design !
  4. 4. Tunnel Monitoring Projects • Circle Line LTA C825 North,South, East & West Bound • SMU site • Harbor Front LTA C859 • Newton Life Church • National Library Board • Deep Tunnel Sewage PUB T06
  5. 5. Excavation Zone Working MRT Tunnels What is Tunnel Monitoring ?
  6. 6. Instrument setup inside the MRT tunnel
  7. 7. • Fully Automatic system • Glass prism as reflectors • Range 20 to 100m • Accuracy +/- 1.0mm + 1ppm • Proven system • High reliable for continuous use in Tunnels Automated Surveying Instrument
  8. 8. GSM Signal Strength variations and these affect data transmission Quality
  9. 9. B) Data is split into smaller packets. Only the affected Data Packet is resent only. More robust technique Data Transmission in Noisy Environment A) If the data is interrupted, the whole data chuck is resent a few times. Thus making it inefficient due to the number of retries. Unpredictable delivery times Noise Noise Noise
  10. 10. Transmission Time Consistency with Data Communication Error Recovery Algorithm
  11. 11. Tunnel movements and SMS Alert
  12. 12. Smarter structural geometric cross checking algorithms will be introduced to avoid overloading and False SMS alerts. The proposed algorithm will deploy more 3D numerical checks for the following: -
  13. 13. Within the same segment Movements in the 4 prisms shifting in space Vertical Movements in the Crown and Track for vertical loading Horizontal Movements in the Left and Right for horizontal loading
  14. 14. Cross-segments Movements in the prisms along the same axes in the tunnel Adjacent Prisms also move Crown Prisms Crown Prisms
  15. 15. Future System Expansion into a GPRS Network System

×