Experiences from establishing fast-charging stations in Barcelona
1. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 1GS Webinar I 17/03/2016 I page 1www.grow-smarter.eu
THE GROWSMARTER PROJECT
2015-2019
Experiences from establishing fast charging stations in
Barcelona
Ana García, ENDESA
2. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 2
1. FASTO – Endesa Fast Charging Point
2. FASTO locations
3. Lessons learned
Index
3. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 3
1. FASTO – Endesa Fast Charger
FASTO is an electric vehicle charging equipment
with 50 kW DC of maximum power
Main characteristics:
- Max. Charging Power 50 kW
- RFID Identification System
- Dimensions 2,05x1,48x0,65 m
- Weight 800 kg
- 15-30 minutes to charge
- Color and Multilanguage screen
- Three connector types currently used in the market:
• CCS-Combo
• CHAdeMO
• AC Mode 3
4. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 4
2. FASTO locations
Locations selected and Status of the chargers
Sagrada
Familia
Roc Boronat
Ps. de Gracia
Pla de Palau
Paralelo
Installed and activated
Installed but pending to
be activated
Pending to be installed
– in tender
5. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 5
2. FASTO locations
Photos and addresses
Fast charger ENDESA FASTO
C/Provença 447 (Sagrada Familia)
6. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 6
Photos and addresses
Fast charger ENDESA FASTO
Passeig de Gràcia, 5
2. FASTO locations
7. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 7
Photos and addresses
Fast charger ENDESA FASTO
Av. del Paral·lel 55
2. FASTO locations
8. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 8
Photos and addresses
Fast charger ENDESA FASTO
Pla de Palau - before the installation
2. FASTO locations
9. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 9
Photos and addresses
Fast charger ENDESA FASTO
Pla de Palau – after the installation – pending to be activated
2. FASTO locations
10. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 10
3. Lessons learned
Experiences from Barcelona
• Installation procedure
1. Location selection
2. Tender
3. Installation
4. Electrical supply point
5. Activation
• Maintenance
Preventive
- State of the charger
- Location
- Availability
Corrective
- Fast and effective
• Long process
• Too many agents
• On overage 6 months
11. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 11
3. Lessons learned
Experiences from Barcelona
• Location
Aspects to take into account before the selection of a location for a fast charger
- Current regulation: minimum distance between the charger and the pavement 60 cm in Bcn
- Pedestrian and road safety
- Wide and safe recharge area
- Suitable length of hoses
- Connector location in the EV
12. www.grow-smarter.eu GS Webinar I 17/03/2016 I page 12
Get the latest updates by signing up online!
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement no 646456.
The sole responsibility for the content of this presentation lies with the GrowSmarter project and in no way reflects the views of the European Union.
Ana García
ana.garcia@enel.com
Thanks for your attention