TMS (Technical Monitoring System)

Download to read offline

TMS is an “Add-In” software application designed to “Support & Report” the progress for any kind of project (from small and simple to large and complex) managed with Oracle Primavera P6 and/or Microsoft Project

TMS is an “Add-In” software application designed to “Support & Report” the progress for any kind of project (from small and simple to large and complex) managed with Oracle Primavera P6 and/or Microsoft Project

Advertisement
Advertisement

More Related Content

Slideshows for you (16)

Similar to TMS (Technical Monitoring System) (20)

Advertisement

Recently uploaded (20)

TMS (Technical Monitoring System)

  1. 1. echnical onitoring ystem Add in Software for Oracle Primavera P6 & Microsoft Project
  2. 2. TMS is an «Add-In» software application designed to the progress for any kind of projectmanaged with ORACLE®PRIMAVERA P6 or MICROSOFT PROJECT 2
  3. 3. Unique Features not available in your Planning System High level Support provided by a Project Control Professional Team Specific Module for Construction Progress Control Integrates with other CLA APPLICATIONS High Quality Progress Reports in Excel™ Format Software open and evolving 3
  4. 4. 2) Create Calendar & Timescales1) Define Weighting Structure4) Calculate Baseline Progress5) Define Alternative Views6) Generate Baseline Reports3) Get Baseline Data from Scheduling System 4
  5. 5. 1) Define Work Class Library2) Define C3 Settings3) Autogenerate C3 Project Work Class Structure4) Populate C3 Items details Import Export5) Export Workbooks for External Data Entry6) Import & Consolidate External Data Entry Export File for Schedule Updating SUBCONTRACTORS SUB1 SUB2 SUB3 SUB4 CLA Applications Software from other vendors or in-house 5 The C3 Module can also work as a «Stand-alone Progress Data Collector» independent from the Scheduling System
  6. 6. Get quantities from CLA external applications or other vendors Import Neutral Excel File Export Neutral Excel File SEND Quantity Data to TMS selected work classes GET Quantity Data from TMS selected Work Classes Validations Checks 6
  7. 7. 1) Get Current Data from Scheduling System3) Calculate & Store Actual Progress4) Calculate Forecast Progress5) Generate Reports2) Perform Inconsistency Checks Engineering updated info Procurement updated info Construction updated info from TMS C3 Module Updated Current schedule 7
  8. 8. •One Original Baseline (BL1) Schedule •One Revised Baseline (BL2) Schedule (if any) •One Updated Schedule at each predefined cut off The required Schedule info will be exported in Excel using Oracle Primavera «P6 Report Wizard/Editor» or Microsoft Project «Export Wizard» 8
  9. 9. 9
  10. 10. 10
  11. 11. •User-defined unlimited levels •Imposed or calculated weights from Schedule Data •Import/export in Excel™ format (97/2013) 11
  12. 12. 12 Main WS Hierarchical Codes Main WS Lowest Level Code (associated to the Schedule Activity) Main WS Classification Codes (associated to the Main WS Lowest Levels) Schedule Activity Codes (imported from the Scheduling System) C3 Item Codes (Associated to the C3 Item Codes)
  13. 13. 13
  14. 14. 14 We can select from a different Cut off Types : -Monthly (last day of each month) -Weekly (each specified day of the Week) -Daily ( All Calendar Days) -Every selected Day of each month -Every selected «last day of the week» (i.e. Last Sunday) of each month
  15. 15. IfyouareaConsortiumLeaderandyouneedtoconsolidateActualProgressofaPartner(externallycalculated)intheOverallClientProjectProgressyoucanimportCustomActualProgressinExcelformatattheLowestLevelofyourdefinedWeightingStructure PlannedValuesareexportedfromTMSasareference 15
  16. 16. •Exported in Excel •Up to 10 Selectable distribution series •Selectable timescale & level of detail •Multiple progress views 16
  17. 17. •User Defined •Cross Projects •Project Specific •Max 10 Steps •Excel Import/Export 17
  18. 18. •Export in Excel of a protected workbook for external data entry •Automatic progress calculation at any level •Import & Consolidation of updated workbook in TMS 18
  19. 19. 19 We can define unlimited number of UDP’s to be associated to each C3 Item. UDP are common to all C3 Items but we can define specific UDP to be applied only to a specific Work Class We can define the format for each UDP (Number, Date, Text) UDP can be exported from one project and imported in another project
  20. 20. You can compose the hierarchy, you can apply filters, you can select the columns, the columns order and the sort. Layout Specs are saved and you can export specs from one project and import them in another project 20
  21. 21. Hierarchical Layout Flat Layout 21
  22. 22. 22 You can create and save unlimited Distribution Profiles You can globally apply the selected Profile to all Activities of a specific Main WS Node and to a specific Spread Type Optionally, you can apply the selected profile only to Activities with duration more than «x» days When you change the Percent Value the Chart is changing accordingly
  23. 23. 23 Exported Excel File Format as required by : Exported Excel File Format as required by : From the C3 Module we can export two separated preformatted excel files ready to be imported as it is in Oracle P6 or MS Project with Actual Data for Schedule Updating
  24. 24. 24 If «C3 Module only» is flagged not all icons are active but still we have a facility to Store Actuals at each Cut off and export Actuals for updating the Scheduling System
  25. 25. 25 In a fewminutes and in a 4 steps we are ready to start to collect progress: 1)Create a Main WS 2)Create a Cut off Calendar & Timescales 3)Import Basic Data from Excel 4)Autogenerate a Work Class Structure TMS can be used also as «Progress Data Collector» without any Schedule Link Basic Data imported from Excel or manually inputted «Excel Like» Commands available
  26. 26. 26 Just Activate the «Chart Renderer» Command and click on a specific Main WS Level and the Pie chart will appear A Tab with «Data» is also available in the Chart
  27. 27. 27 Just Activate the «Chart Renderer» Command and click on a specific Progress View Level and the Progress Curves will appear Available in all Progress Views combinations (Alternative Views)
  28. 28. 28 We can edit for each Main WS Lowest level the Cumulated Stored Progress at each cut off, and, consequently, Weighting Factors and Units (Period & Cumulated) will be automatically recalculated
  29. 29. 29 We can edit for each Schedule Activity the Cumulated Stored Progress % at each cut off, and, consequently, Weighting Factors and Units (Period & Cumulated) will be automatically recalculated Option to recalculate the progress at Main WS Lowest level
  30. 30. 30 We can edit for each Work Class the Cumulated Stored Progress % at each cut off, and, consequently, Weighting Factors and Units (Period & Cumulated) will be automatically recalculated
  31. 31. 31 Backup includes TMS Project Files and All the Excel Working files (Qualification Templates and Export Files from Primavera P6 or MS Project) When you restore a Project you can also restore «All» or «Selected Working Files» in the same Original Pathname or in another selected Pathname. Folders are automatically created if not existing
  32. 32. 1.All Reports are in Excel Format (2003 / 2013) 2.Reports specs are saved (Report ready to run) 3.High Level of Customization 4.Multiple Progress Views (using Alternative WS) 5.Selectable Level of details 6.Selectable Baseline Comparison 7.Selectable Time interval (From –To) 8.Selectable Timescales (Weekly, Monthly, Custom) 9.Up to 10 Selectables Progress Series 32
  33. 33. 33 Report Specs can be saved linked to the project Report specs are maintained in Copy, Backup and Restore Report Specs can be exported Report Specs can be imported Just select a Report and run it
  34. 34. •Selectable level of detail •Selectable comparison •Selectable period •Selectable progress view 34
  35. 35. •Drill down up to activity level •Organized by subcontractors •Grouped by work class 35
  36. 36. •Up to 10 Selectable distribution series •Selectable timescale •Selectable content 36
  37. 37. 37 •Focus on Data Date •Selectable number of period before Data Date •Selectable Series & Timescales
  38. 38. 38 •Long Periods representation •Current Status at Data Date •Selectable Series & Timescales
  39. 39. 39 •Up to 10 Selectable Distribution Series •Selectable Timescale & Level of Detail •Multiple Progress Views
  40. 40. 40 Old Historical Status New Revised Baseline
  41. 41. 41
  42. 42. 42 •Up to 8 Summary Bars with user defined content •Selectable timescale •Selectable series
  43. 43. 43
  44. 44. 44
  45. 45. 45 We can select the type of Comparison and the TMS Project to be compared
  46. 46. 46
  47. 47. 47
  48. 48. 48 Milestone can be organized by Activity Code or by Cut off Dates Milestones can be filtered by Activity Codes, by «Due but not Achieved» Milestones can be sorted by Activity ID, by Planned Dates or by Forecast Dates Added Milestones in the Current Schedule are identified with «A»
  49. 49. 49
  50. 50. 50
  51. 51. 51
  52. 52. 52
  53. 53. Reports Multi-Language Report Batch (One Run for Multiple Reports) Actions Batch (Selected actions in one Run) Direct Access to Primavera P6 (via API) and to MS Project C3 Module via WEB (for Subcontractors) Actual Resource Data Collection Earned Value Management 53
  54. 54. 54 54

×