GEORGETOWN ISD2010 BOND PROGRAM UPDATE     D E C E MB E R 2 011                            Huckabee
2010 BOND PROGRAM UPDATE                                                        TABLE OF CONTENTS                         ...
2010 BOND PROGRAM UPDATE                                                     General Contractor                           ...
2010 BOND PROGRAM UPDATE                                                                                                  ...
2010 BOND PROGRAM UPDATE                                                EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2...
2010 BOND PROGRAM UPDATE                                EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2         Academi...
2010 BOND PROGRAM UPDATE                           EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2                     ...
2010 BOND PROGRAM UPDATE                                                    General Contractor                            ...
2010 BOND PROGRAM UPDATE                                                           General Contractor                     ...
2010 BOND PROGRAM UPDATE                                                                                                  ...
2010 BOND PROGRAM UPDATE                                   GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS               ...
2010 BOND PROGRAM UPDATE                               GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS     SITE	UTILITY	P...
Upcoming SlideShare
Loading in …5
×

Huckabee Project Update 12-05-11

636 views

Published on

Presentation by Huckabee to the Board of Trustees on December 5, 2011.

Published in: Education, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
636
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Huckabee Project Update 12-05-11

  1. 1. GEORGETOWN ISD2010 BOND PROGRAM UPDATE D E C E MB E R 2 011 Huckabee
  2. 2. 2010 BOND PROGRAM UPDATE TABLE OF CONTENTS East View High School Phase 2 Additions, Package 1 3 East View High School Phase 2 Additions, Package 2 4 New Warehouse Facility 8 Annie Purl Elementary School Roof and HVAC Modifications 9 Georgetown High School Additions and Renovations 10 HuckabeeGeorgetown Independent School District 2
  3. 3. 2010 BOND PROGRAM UPDATE General Contractor EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 1 PROGRESS REPORT MILESTONE DATES Schematic Design Presentation November 11, 2010 Architect Signs Documents November 24, 2010 Pre-Proposal Meeting December 8, 2010 Proposal Part A Due December 21, 2010 Proposal Part B Due December 22, 2010 Proposal Evaluations January 4, 2011 General Contractor Recommendation to School Board January 10, 2011 First Owner/CO Meeting February 15, 2011 Field House Locker Room Construction Start Date February 18, 2011 Building Permit Issued March 16, 2011 Owner, Architect and Contractor Meeting June 7, 2011 Owner, Architect and Contractor Meeting June 21, 2011 Owner, Architect and Contractor Meeting July 5, 2011 Owner, Architect and Contractor Meeting July 19, 2011 Substantial Completion (Field/Track and Bleachers) August 1, 2011 Owner, Architect and Contractor Meeting August 2, 2011 Owner, Architect and Contractor Meeting August 16, 2011 Substantial Completion (Buildings) August 19, 2011 Field House Weight Room HuckabeeGeorgetown Independent School District 3
  4. 4. 2010 BOND PROGRAM UPDATE General Contractor EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 Original: $25,574,000 I CATE Addition – $2,121,338 I J Baseball & Softball Turf - $880,000 New Athletic Addition H H Total - $28,575,338 F G J H J First Floor Bid Package 1 A B J Existing East View J High School B A. New Athletic Addition B. New Fine Arts Addition New Fine Arts Addition D E C. New Academic Addition C D. New CTE Building New Academic Addition E. New ROTC Addition (Alt.) CR 10 F. New Tennis Courts 4 ay 29 G. New Tennis Building hw Hig H. New Baseball/Softball Fieldhouse, Bleachers, Lighting & Pressbox I. New Practice Fields J. New Parking (1,070 spaces) New Academic Addition CTE Building Second Floor New CTE/ROTC AdditionAcademic Wing Softball Field House HuckabeeGeorgetown Independent School District 4
  5. 5. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 PROGRESS REPORT ACADEMIC ADDITION MILESTONE DATES • Steel structure is making progress. • Overhead utility lines and CMU walls have begun. Schematic Design Presentation January 1, 2011 • 2nd floor slab will begin the end of this week. Architect Signs Documents March 8, 2011 CATE/ROTC Building Permit Application Submittal March 15, 2011 • Underground plumbing and electrical utilities are making progress. • Slab work will resume in January. Site Plan Application Submittal March 17, 2011 • After slab work is complete and metal building has arrived, steel structure will begin. Pre-Proposal Meeting March 22, 2011 ATHLETIC ADDITION Tour with General Contractors at East View Ninth Grade Center March 30, 2011 • CMU wall along the existing building is complete. • Steel structure has begun at the locker room area. The gym area will be started after the locker room Proposal Part A Due April 7, 2011 area is complete. Proposal Part B Due April 8, 2011 • CMU walls will begin next. Proposal Evaluations April 11, 2011 FINE ARTS ADDITION – DRAMA • Steel structure and roof structure are complete. Concrete slabs are complete. Received City Building Dept. Plan Review Comments April 14, 2011 • Overhead utility lines have begun. General Contractor Recommendation to School Board April 18, 2011 • Metal decking and roofing will begin next. Received City Planning Dept. Plan Review Comments April 25, 2011 FINE ARTS ADDITION – ORCHESTRA • CMU walls are complete. Construction Start Date May 19, 2011 • Interior metal stud framing has begun. First Owner/CO Meeting May 24, 2011 • Roofing has begun. Building Permit Issued June 1, 2011 BASEBALL, SOFTBALL, TENNIS AND SITE • CMU walls at field house are nearly complete. Mezzanine slab is in place. Owner, Architect and Contractor Meeting November 8, 2011 • CMU walls have been started at each press box. Roofs for press boxes, dugouts, and tennis building Owner, Architect and Contractor Meeting November 15, 2011 will begin this week. • Fencing and netting is being installed around the fields. Grading at both fields is making progress. Owner, Architect and Contractor Meeting November 22, 2011 • Grandstands will arrive mid-December and are scheduled to be completed by the end of December. • Cutting and grading of parking lots and drives continues. Concrete walks will begin this week. Owner, Architect and Contractor Meeting November 29, 2011 • Grading and cutting for the tennis courts has been started. Substantial Completion June 27, 2012 HuckabeeGeorgetown Independent School District 5
  6. 6. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 Academic Addition Locker Rooms Interior View of Orchestra Baseball Field HuckabeeGeorgetown Independent School District 6
  7. 7. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 Aerial HuckabeeGeorgetown Independent School District 7
  8. 8. 2010 BOND PROGRAM UPDATE General Contractor NEW WAREHOUSE FACILITY PROGRESS REPORT MILESTONE DATES Schematic Design Presentation January 10, 2011 Architect Signs Documents January 12, 2011 Building Permit Application Submittal January 25, 2011 Proposal Part A Due February 15, 2011 Proposal Part B Due February 16, 2011 Site Plan Application Submittal February 17, 2011 Proposal Evaluations February 17, 2011 Landscaping Plans Approved March 1, 2011 Interior View of Warehouse General Contractor Recommendation to School Board March 7, 2011 Job Coordination Meeting March 25, 2011 Grading/Utilities Permit Received March 31, 2011 First Amended Administrative Exception Submitted April 18, 2011 Second Amended Administrative Exception Submitted April 20, 2011 Final Planning Dept. Comments Received April 25, 2011 Building Permit Issued April 28, 2011 First Owner/CO Meeting May 5, 2011 Construction Start Date May 9, 2011 Substantial Completion November 9, 2011 Storage Shed HuckabeeGeorgetown Independent School District 8
  9. 9. 2010 BOND PROGRAM UPDATE General Contractor ANNIE PURL ELEMENTARY SCHOOL ROOF AND HVAC MODIFICATIONS Contract Amount: $229,000 MILESTONE DATES Schematic Design Presentation January 10, 2011 Architect Signs Documents February 3, 2011 Pre-Proposal Meeting February 9, 2011 Proposal Part A Due February 22, 2011 Proposal Part B Due February 23, 2011 Proposal Evaluations February 24, 2011 Building Permit Issued March 2, 2011 General Contractor Recommended to School Board March 7, 2011 New HVAC Unit and Roofing First Owner/CO Meeting May 24, 2011 Construction Start Date June 6, 2011 Substantial Completion August 12, 2011 New Ceiling and Light Fixtures HuckabeeGeorgetown Independent School District 9
  10. 10. 2010 BOND PROGRAM UPDATE Construction Manager GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS BAIRD WILLIAMS Huckabee CONSTRUCTION GEORGETOWN HIGH SCHOOL BAIRD WILLIAMS CONSTRUCTION 3D Rendering Project Manager Front Entry Boards.indd 4 7/26/11 8:55 AM CTE Wing Cafeteria Athletics Auditorium Academic Athletics Athletics Computer Labs Science Labs Library Athletics Special Education Academic Fine Arts HuckabeeGeorgetown Independent School District 10
  11. 11. 2010 BOND PROGRAM UPDATE GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS MILESTONE DATES MILESTONE DATES Design Kick-off Meeting with Librarian, Science Dept. Material selection with GHS staff June 30, 2011 February 28, 2011 and Nurse Cost Review with Construction Manager July 19, 2011 Design Kick-off Meeting with Athletics March 1, 2011 Interiors Presentation July 25, 2011 Initial Construction Phasing with Stakeholders March 3, 2011 Architect Signs Documents for Site Utility Package July 26, 2011 Design Kick-off Meeting with Special Education March 4, 2011 CD Coordination Meeting on Site with Architect, Owner July 27, 2011 Design Kick-off Meeting with Administration March 10, 2011 and Construction Manager Advertisement for Construction Manager at Risk RFQ March 12, 2011 Final Review of FF&E with GHS staff July 27, 2011 Received Construction Manager at Risk Step 1 City Comments Received for Site Utility package August 8, 2011 March 29, 2011 (Qualifications) 100 % CD Review August 15, 2011 Evaluation Team Grades and Develops Recommended Short List March 30, 2011 Site Utility Package Bid August 17, 2011 Facility Assessment of ADA, Code and Existing Conditions March 29 - 30, 2011 Review Comments Due August 22, 2011 School Board Receives Recommended Short List April 4, 2011 Guaranteed Maximum Price on Site Utility Package August 29, 2011 Step 2 of RFQ Submitted to Short Listed Contractors April 5, 2011 Architect Signs Documents September 1, 2011 (Fees and General Conditions) Pre-Bid September 21, 2011 Fees and General Conditions due by 3 PM April 8, 2011 Pre-Bid (Technology) September 23, 2011 Board of Trustees Select Construction Manager at Risk April 18, 2011 First Meeting with District, Architect, Project Manager and Bid October 4, 2011 April 19, 2011 Construction Manager Guaranteed Maximum Price Presented to School Board October 17, 2011 Site Logistics Survey with District, Architect, Project Manager and Construction Start Date October 18, 2011 April 29, 2011 Construction Manager Owner, Architect and Contractor Meeting November 10, 2011 Schematic Design Presentation June 6, 2011 Owner, Architect and Contractor Meeting November 17, 2011 Kitchen Design Review with Staff June 14, 2011 Owner, Architect and Contractor Meeting December 1, 2011 Site Coordination Meeting with Architect, Owner and June 16, 2011 Substantial Completion July 2013 Construction Manager HuckabeeGeorgetown Independent School District 11
  12. 12. 2010 BOND PROGRAM UPDATE GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS SITE UTILITY PACKAGE – PHASE I • Existing canopy and sidewalks have been removed. • Sewer and storm drain main lines are complete around the cafeteria and athletics additions. • Final grade has been made on the building pad for the cafeteria and athletic additions. • Under-pad utilities and grade beam excavation will begin next. • Interior demolition will begin during the Christmas break. Site Transformer and Pad HuckabeeGeorgetown Independent School District 12

×