BPTP Floors

413 views

Published on

BPTP Floors are part of the BPTP Astaire Gardens Project at Sector 70A in Gurgaon. The project has villas, floors, and plotted development.

Published in: Real Estate, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
413
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

BPTP Floors

  1. 1. 2011BPTP Floors at Astaire Gardens: Sector 70A, Gurgaon www.greenrealtech.com Green Realtech Projects Pvt. Ltd +91 9971884499, 9971889899
  2. 2. BPTP Floors at Astaire Gardens: Sector 70A, Gurgaon 2011 BPTP Floors at BPTP Astaire Gardens Project 1. Overview of the Project: (For detailed brochure, refer: http://www.bptp.com/brochure/AstaireGardens/AstaireGardens.pdf) BPTP Floors at Astaire Gardens project is envisioned as a gated community spread across 102.2 acres (4451832 Sq. Ft.) a large landscape in the heart of Gurgaon at Sector 70-A. Astaire Gardens is a self contained township comprising plots, floors, and villas amidst wide open spaces, designed to be an oasis of tranquility. Leading banks such as HDFC, PNB are sanctioning the home loan for the project. The construction has started and project is expected to be completed before January 2014. The project is strategically located in close vicinity of Gurgaon premium gold course extension road. The project is located on the intersection point of Sohna road and gold course extension road with very good connectivity to Gurgaon Business center such as M.G. Road, NH-8. Amenities:  Air conditioned floors and villas with imported marble flooring.  Efficient floor plans maximizing natural light and ventilation.  Sanctuary – the luxurious club consisting of spa, multi cuisine restaurant, amphitheatre, health club, swimming pool, and jogging tracks.  100% power back up, 24x7 civic facilities and perimeter security.  Landscape gardens, recreational areas, children’s’ park, convenient retail.  Adequate parking space.  Secure environment with electronic surveillance, state of the art health care and education facilities are nearby.  School and crèche, community center. Master plan for BPTP Floors at Astaire Gardens Project: (For details, refer: http://www.bptp.com/residential/astairegardens/siteplan.pdf)  Premium residential township that blooms amidst beautifully landscaped greens, water bodies and a panoramic view of the aravallis  Plot size 102.2 acres  Living options include freehold plots, Monet floors, and August villas make up the entire master plan along with a luxurious club  School, healthcare, daily needs, and convenient retail are all within walking distance Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 2 BPTP Floors
  3. 3. BPTP Floors at Astaire Gardens: Sector 70A, Gurgaon 2011 2. Specifications of BPTP Floors: LIVING/DINING Wall Finish Painted in pleasing shades of Oil Bound Distemper Flooring Imported Marble BEDROOMS Wall Finish Painted in pleasing shades of Oil Bound Distemper Flooring Designers/Imported Vitrified Tiles/Laminated Wooden Flooring TOILETS Flooring Ceramic Tiles Dado Selected Ceramic Tiles Fixtures & Fittings Granite/ Marble Counter, white sanitary fixtures. Contemporary styled CP Fittings DOORS & WINDOWS Window Powder Coated Anodized Aluminium/Glazing/UPVC Door Seasoned hardwood frames with painted board shutters KITCHEN Flooring Vitrified Tiles Dado Ceramic Tiles above working platform, rest Oil Bound Distemper Platform Granite Counter with Double bowl stainless steel sink with drain board FACILITIES Electrical Conduit electrical copper wiring for all light and power points Power Back Up Minimum 7.5 KVA Air Conditioning Split Air Conditioners in Living/Dining Area & Bedrooms EXTERNAL SPACE Organized green landscaped areas. Golf carts for internal movement of visitors. Barbeque pits/Gazebos for parties. Sitting areas, adequate street lighting and open area lighting. External Facade- a combination of texture paint and stone cladding. 2 Acre Recreational Club with indoor Heated Pool, Outdoor Pool and Kids Pool, Jogging Tracks, Outdoor Games, Gymnasium, Multi Cuisine Restaurants, Convenient Shopping Centre, Business Centre, Banquet Hall, State- of-Art Theatre, Table Tennis, Badminton CLUB Court, Squash Court, Pool/Billiards, High end Spa.. * Architects and the developers reserve the right to alter the specifications and facilities for BPTP Floors at Astaire Gardens Project. Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 3 BPTP Floors
  4. 4. BPTP Floors at Astaire Gardens: Sector 70A, Gurgaon 2011 3. About the builder: BPTP offers residential and commercial real estate products ranging from integrated townships, plotted development, group housing consisting of high rise and low rise apartments and villas to other commercial properties including district and convenience commercial and retail centers, IT and cyber parks and IT SEZs. The company has also been able to attract global investors like Citigroup Property Investors (CPI), J.P Morgan Chase Banks and Merrill Lynch to invest in the company. This has resulted in sustainable growth and high standards of corporate governance. BPTP’s projects: Residential:  Amstoria, Sector 102 – Gurgaon  BPTP Floors at Astaire Gardens, Sector 70A – Gurgaon  Freedom Park Life, Sector 57 – Gurgaon  Mansions Park Prime, Sector 66 – Gurgaon  Park Prime, Sector 66 – Gurgaon  Park Serene, Sector 37D – Gurgaon  Spacio Park Serene, Sector 37D – Gurgaon  Discovery Park, Sector 80 – Faridabad  Parklands, Sector 81 – Faridabad  Park Arena, Sector 80 – Faridabad  Park Elite Floors, Sector 81 – Faridabad  Park Elite Premium Floors, Sector 84 – Faridabad  Park Floors, Sector 76 & 77 – Faridabad  Park Grandeura, Sector 82 – Faridabad  Parklands, Township – Faridabad  Parklands Pride – Faridabad  Princess Park – Sector 86 – Faridabad  The Resort – Faridabad  Villas – Faridabad Office and Retail:  Capital City, Sector 94, Noida  Convenience Commercial Plots, Parklands – Faridabad  Crest, Udyog Vihar Phase IV – Gurgaon  Park Central, Sector 85 – Faridabad  The Next Door, Parklands – Faridabad Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 4 BPTP Floors
  5. 5. BPTP Floors at Astaire Gardens: Sector 70A, Gurgaon 2011 4. Pricing for the BPTP Floors at Astaire Gardens Project: Astaire Gardens, Gurgaon PRICE LIST BPTP FLOORS, GURGAON Terrace/Lawn Area* (Approx.) Total Basic BSP Usable Sales Inaugural Net offered Development Booking Plot Size Floor Built-up Area Area Price Discount BSP by us Charges Amount (Sq. (Sq. Yd.) (Sq. Ft.) (Sq. Ft.) Ft.) (Lacs) (Lacs) (Lacs) (Lacs) (Lacs) (Lacs) 196 Sq. Yd. GF 1090 523 Lawn 1613 71.88 0 71.88 68.5048 2.88 6 Lacs (3 BHK + 2T) FF 1090 315 Terrace 1405 66.88 0 66.88 63.7048 2.88 6 Lacs SF 1090 315 Terrace 1405 61.88 0 61.88 58.9048 2.88 6 Lacs GF + 1390 + 1122 = 250 Sq. Yd. BSMT 2512 564 Lawn 3076 103.88 7 96.88 92.5048 3.67 7 Lacs (3 BHK + 3T) FF 1390 405 Terrace 1795 83.88 7 76.88 73.3048 3.67 7 Lacs SF 1390 405 Terrace 1795 76.88 0 76.88 73.3048 3.67 7 Lacs GF + 1730 + 1427 = 347 Sq. Yd. BSMT 3157 845 Lawn 4002 140.12 9 131.1 125.375 5.1 9 Lacs (4 BHK + 3T) FF 1730 531 Terrace 2261 114.12 9 105.1 100.415 5.1 9 Lacs SF 1730 531 Terrace 2261 104.12 9 95.12 90.8152 5.1 9 Lacs th Please Note: The basic price offered by us is applicable for minimum of 6 bookings and is valid till 10 October 2011. The basic price can be negotiated further with the builder if total number of bookings increases. Note: 1. PLC- 18 Meter Road and above- 10%, 15 Meter to 17 Meter - 5%, Two Side Open - 10%, Park Facing - 5% and Corner - 10% 2. Club Membership- Rs.2, 00,000/- per Family. 3. PBIC - Rs.20, 000/- per KVA. 4. Service Tax shall be payable extra by allottee(s). * Lawn and Terrace areas are tentative and subject to change. **Timely Payment Discount (TPD) of 5% on each installment is subject to timely payment of each installment and is at the sole discretion of the company. All terms & conditions and other charges as per standard floor buyers agreement. The above prices are subject to revision/ withdrawal at any time without notice at the sole discretion of the company. Cheques to be favoring "BPTP Limited" Payable at Delhi/ New Delhi. Allied Charges: DC: Development Charges, PLC: Preferential Location Charges, CMC: Club Membership Charges PBIC: Power Backup installation Charges Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 5 BPTP Floors
  6. 6. BPTP Floors at Astaire Gardens: Sector 70A, Gurgaon 2011 5. Payment Plans for BPTP Floors at Astaire Gardens Project: CONSTRUCTION LINKED PAYMENT PLAN Booking Amount 6 lacs / 7 lacs / 9 lacs Within 75 days of Booking Complete 20% of BSP Within 150 days of Booking 10% of BSP + 50 % of DC At the Start of Construction 10% of BSP + 50 % of DC On casting of Ground Floor Roof Slab 10% of BSP + 50 % of PLC On casting of First Floor Roof Slab 10% of BSP + 50 % of PLC On casting of Second Floor Roof Slab 7.5% of BSP + Club Membership On Completion of brick work 7.5% of BSP On Completion of Internal Flooring 7.5% of BSP On Completion of External Plastering 7.5% of BSP 10% of BSP + IFMS + PBIC + Stamp Duty+ Registration On offer of Possession Charges & Administrative Charges DOWN PAYMENT PLAN (With 10% rebate) Booking Amount 6 lacs / 7 lacs / 9 lacs Within 75 days of Booking Complete 90 % of BSP + 100% of Additional Charges# 10 % of BSP + IFMS + PBIC + Stamp Duty+ Registration On offer of Possession Charges & Administrative Charges # Additional Charges include PLC, Club Membership & DC. Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 6 BPTP Floors
  7. 7. BPTP Floors at Astaire Gardens: Sector 70A, Gurgaon 2011 6. Financing: Home loans are available from HDFC Bank, PNB and other leading banks for BPTP Floors at this project. According to RBI guidelines 20% of total property value has to be borne out by the buyer and remaining 80% of the total property value can be financed by financial institutions. Home loan rates are available on floating and fixed interest rates. Fixed rate loans are expensive but are fixed during the whole tenure of the loan whereas floating rates are indexed to banks’ base rate and fluctuate as and when banks revise their base rates. We work with leading banks in the industry and as part of our total service we facilitate the process of securing the home loan for our customers. For loan eligibility, consider the example below: Example for loan eligibility: Monthly Household Loan Applied for Income (Rs.) (Rs.) EMI (Rs.) Eligible* 100000 4000000 39,935.20 Yes 100000 5000000 49,918.99 Yes 100000 6000000 59,902.79 No 100000 7000000 69,886.59 No * Banks normally provide loans based on the households capacity to pay the EMIs. Generally, 40-50% of household income can be accounted for paying the EMIs In this example, we have assumed rate of interest at 10.5% Tenure of the loan is 240 months EMI will increase if interest rates go up and decrease if interest rates fall. EMI decreases if the tenure of the loan increases. However, 20 years (240 months) is the maximum available tenure for the home loan. Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 7 BPTP Floors
  8. 8. BPTP Floors at Astaire Gardens: Sector 70A, Gurgaon 2011 7. Location map for BPTP Floors at Astaire Gardens Project: Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 8 BPTP Floors
  9. 9. BPTP Floors at Astaire Gardens: Sector 70A, Gurgaon 2011 8. Floor Plans: (For details, refer: http://www.bptp.com/residential/astairegardens/MonetFloors196sqyds.pdf http://www.bptp.com/residential/astairegardens/MonetFloors250sqyds.pdf http://www.bptp.com/residential/astairegardens/MonetFloors350sqyds.pdf http://www.bptp.com/residential/astairegardens/MonetFloors545sqyds.pdf) Monet Floors Terrace/ Lawn Plot Size Floor Built up Area Area* (APPROX.) Total Usable Area (Sq. Yd.) (Sq. Ft.) (Sq. Ft.) (Sq. Ft.) 196 Sq. Yd. Ground 1090 523 1613 (3BHK + 2T) First 1090 315 1405 Second 1090 315 1405 Ground + 250 Sq. yd. Basement 1390+1122=2512 564 3076 (3BHK + 3T) First 1390 405 1795 Second 1390 405 1795 Ground + 350 Sq. yd. Basement 1730+1427=3157 845 4002 (4BHK + 3T) First 1730 531 2261 Second 1730 531 2261 Ground + 545 Sq. yd. Basement 2334+2015=4349 1623 5972 (4BHK + Utility) First 2334 706 3040 Second 2334 706 3040 1 Sq. Mt. = 1.196 Sq. Yd/ 1 Sq. Mt. = 10.764 Sq. Ft., Areas are subject to change. Please Note: The floors are subject to availability at given point of time. Disclaimer: Green Realtech Projects Pvt. Ltd does not warrant the accuracy, adequacy or completeness of the information presented herein and expressly disclaims liability for any errors or omissions therein. The information presented herein for BPTP Floors at Astaire Gardens Project may include data supplied to Green Realtech Project Pvt. Ltd by third parties. Such data may be amended or changed at any time by third parties without notice to Green Realtech Projects Pvt. Ltd. Accordingly; no warranties of any kind, implied, express or statutory are given in respect of the information. Green Realtech Projects Pvt. Ltd http://www.greenrealtech.com Page 9 BPTP Floors

×