PRO-POOR BUILDING CODES FOR DRR
    By Cassidy Johnson, UCL DPU & Shailesh Kataria, RICS
Workshop outline
1h 30m

•   Presentation
•    Context
•    Main problems
•   Small Group Discussion
•   Feedback
•   Case Studies
What is RICS?
•   Royal Institution of Chartered Surveyors

•   Non-profit professional organisation – with a „public
    interest‟ mandate

•   Sets standards & promotes best practices for all
    aspects of land, property and construction

•   Started in England, but is now global - 100,000
    members in 150 countries
RICS Disaster Management Commission
Mission
• To bring the skills of RICS and other built environment
  professionals to strengthen capacity of vulnerable
  communities to reduce disaster risks and improve
  disaster recovery

 18 Commissioners/staff
 250 volunteers (professionals and their firms)

            www.rics.org/disastermanagement
Earthquakes don’t kill, buildings do!




Haiti – over 200,000 deaths   New Zealand – 0 deaths
HFA Priority 4:
‘…incorporate DRR, including enforcement of building codes’


        Resilient Cities Campaign Checklist 6:
  ‘…enforce realistic risk compliant building regulations…’
RICS DMC Project with UNESCO/GTFBC:
      ‘Global Building Codes Mapping’

2011 HFA Progress Report:
 63 countries mention building codes
 3 countries report they have no building codes


Most poor/vulnerable people build informally –
beyond scope of building codes
Why ineffective action on BC?

Cost of complying with building codes –
perceived to be a key constraint.

Is that a myth?
Why ineffective action on BC?

Research by Saad Yahya/Practical
   Action, RICS, Unesco, UNISDR, IFRC/SKAT,
   UNCRD, etc:

1. Political motivation
2. ‘Technical’ issues
3. Enforcement issues
1. Political Motivation

• Long-term project: Results of safe building, in
  terms of lives saved, is not immediately visible
• Can require large changes in land
  management systems, technical capacity
• Insurmountable problem
• Political hurdles to make changes, many
  vested interests
Political hurdles in the application of building codes:
             Turkey after the 1999 earthquake
  ❖Prior to 1999 earthquake, municipal engineers were not able to
  check design calculations thoroughly because of their heavy workload
  or their professional qualification. This has always been identified as
  one of the core reasons for failure of code enforcement
   Gülkan, 2010




Düzce town centre before 1999 earthquakes     Düzce after 1999 earthquakes
Political hurdles in the application of building codes:
              Turkey after the 1999 earthquake
❖After earthquake strong political motivation to improve building
construction supervision „Decree with Power of Law,‟ No. D595 “Building Construction Supervision”

❖New system whereby construction supervision firm assumed
functions of municipality - supervisory role in checking design calculations
and actual construction activity at building site. Public agent ensuring
materials, workmanship, detailing requirements fulfilled. Needed to have ten-
year duration liability insurance coverage for each job.

❖Opposition campaign by professional groups, lack of ability for
supervision firms to attain insurance, changes needed to be made in
civil law, commercial law and insurance law

❖Decree was rescinded in 2001 and replaced by law L4708, 19 provinces.
2010 was extended to all provinces. However, still places responsibility on
municipality.
                                                                                           Gülkan, 2010
2. Technical issues

• Lack of technical expertise to implement, especially
  in smaller towns
• Overly complicated standards, especially for simple
  construction
• High proportion of informal building, non-
  engineered structures
• Rigid/unrealistic codes – for ex. allowing
  incremental building
Standards are not appropriate for the way
people can build
                            Bangladesh National Building Code
                       ✤    Minimum standard housing density 75
                            units/hectare, average 5
                            persons/dwelling.
                       ✤    The minimum plot size between 30 sq.
                            m to 25 sq. m. Minimum width of
                            walkways 3 m.
                       ✤    Individual plot max. of 75% land
                            coverage, 1.5 m open space at the
                            front. Minimum size of the 1st habitable
                            room is 9 sq. m and the 2nd, 6 sq. m; 15
                            sq.m total.
                       ✤    No option of incremental development
                       ✤    No considerations about addressing
                            climate and other risks varying in
                            different locations.
                       (from Jabeen and Mallick, 2009)
3. Enforcement Issues


• Lack of capacity to enforce compliance with
  standards, to make checks and issue permits
• Overly complicated procedures for obtaining legal
  permits
PROCEDIMIENTOS Y
                                                                                                                                            INVERSIONISTA                                                                                                                           REGISTROS
                                                                 PLAZOS               DEPENDENCIAS DE LA MML                                                                                                               MUNICIPALIDAD
                                                                                                                                             O PROMOTOR                                                                                                                              PÚBLICOS
                                                                                          QUE INTERVIENEN




Overly complicated procedures for
                                                                                                                                                                                                                                               INFORMACIÓN
                                                                                                                                  INICIA GESTIÓN
                                                                                                                                                                                                                                                PRELIMINAR
                                                                                      1.-CONSULTA PRELIMINAR                        SE INFORMA
                                                                                                                                                                                                                                               ORIENTACIÓN
                                                                                      ADQUISICIÓN DE CARPETA DE
                                                        VARIABLE                      TRÁMITE
                                                                                                                                                               CANCELA DERECHOS
                                                        EN CONDICIONES ÓPTIMAS DEPENDENCIAS QUE INTERVIENEN:
                                                                                      - OF. TRAMITE                                                                                             CARPETA DE
                                                        1 DÍA HÁBIL                     DOCUMENTARIO                                                                                             TRÁMITE




        building approvals
                                                                                      - DIV. DE EDIFICACIONES
                                                                                      - CAJA MUNICIPAL




                                                                                      2.- CERTIFICADO DE PARAMETROS
                                                                                      URBANISTICOS Y EDIFICATORIOS                             CANCELA DERECHOS Y                                                                      CERTIFICADO DE
                                                        SEGÚN REGLAMENTO                                                                       PRESENTA SOLICITUD                            ADMISIÓN A TRÁMITE DE                PARÁMETROS URBANÍSTICOS
                                                                                      DEPENDENCIAS QUE INTERVIENEN:                                   FOM                                          EXPEDIENTE                          EDIFICATORIOS
                                                                                      - OF. TRAMITE
                                                        5 DÍAS HÁBILES                  DOCUMENTARIO
                                                                                      - OPDM
                                                                                                                                                                                                                                                      5 DIAS
                                                                                      - CAJA MUNICIPAL




•
                                                                                                                                                                                                                                                                  4 Días




    Of all regulatory constraints, research
                                                                                                                                                                                                                                EVALUACIÓN PRELIMINAR
                                                                                                                                                                                                                                INSPECCIÓN OCULAR
                                                                                                                                                               PRESENTA EXPEDIENTE                                              PRECALIFICACIÓN                   2 Día
                                                                                      3. ANTEPROYECTO EN CONSULTA                                                     FOM
                                                                                                                           ELABORACIÓN DE PLANOS                                            ADMISIÓN A TRÁMITE DE                DICTAMEN DE C. TÉCNICA
                                                                                                                              DE ANTEPROYECTO                   CANCELA DERECHOS                  EXPEDIENTE                    ACTA DE CALIFICACIÓN
                                                                                      DEPENDENCIAS QUE INTERVIENEN:
                                                        Se estima 30 días hábiles                                                                                                                                               RESOLUCIÓN                        4Días
                                                                                      - OF. TRAMITE
                                                        Para planos de arquitectura                                                                                                                                             NOTIFICACIÓN
                                                                                        DOCUMENTARIO
                                                        más




    shows that administrative
                                                                                      - DIV. DE                                                                                                            1 Día                                                   1 Día
                                                                                        EDIFICACIONES
                                                        GESTIÓN                       - COMISIÓN TÉCNICA
                                                        15 DIAS HABILES               - CAJA MUNICIPAL                                                                                                                                                  10 DIAS

                                                                                                                                                                                                                                         NOTIFICACIÓN




    procedures are invariably the greatest
                                                                                                                                                                                                                                                     3 DIAS




                                                                                      4. CALIFICACIÓN DE PROYECTO Y
                                                                                      LICENCIA AUTOMÁTICA                                                        PRESENTA
                                                                                      OPCIÓN B                                                                AUTOLIQUIDACIÓN




    barrier to conformity.
                                                                                                                             ELABORACIÓN DE                                                 ADMISIÓN A TRÁMITE DE
                                                                                                                                                               FUO 1 ANEXO D                   EXPEDIENTE DE
                                                                                                                           EXPEDIENTE TÉCNICO
                                                                                      DEPENDENCIAS QUE INTERVIENEN:                                          CANCELA DERECHOS                     PROYECTO
                                                                                                                                DEFINITIVO                                                                              1 Día
                                                                                      - OF. TRAMITE
                                                                                        DOCUMENTARIO
                                                        03 DÍAS HABILES               - DIV. DE
                                                                                        EDIFICACIONES                                                                                             LICENCIA
                                                                                      - CAJA MUNICIPAL                                                                                         AUTOMÁTICA DE
                                                                                                                                                                                                    OBRA
                                                                                                                                                                                                        2 DÍAS


                                                                                                                                                                                                                                    PRECALIFICACIÓN DE
                                                                                                                              INICIO DE OBRAS DE
                                                                                                                                                                                                                                        PROYECTO,
                                                                                                                                CONSTRUCCIÓN
                                                                                                                                                                                                                                  DICTAMEN DE C. TÉCNICA
                                                                                                                                                                                                                                  ACTA DE CALIFICACIÓN
                                                                                                                                                                                                                                       RESOLUCIÓN
                                                                                                                                                                                                                                       NOTIFICACIÓN




•
                                                                                      5.- LICENCIA DE OBRA Y CERTIFICADO




    In the historical centre of Lima
                                                                                      DE NUMERACION

                                                                                      OPCIONAL: PREDECLARATORIA DE
                                                                                                                                                                                                                                                    45 DIAS
                                                                                      FÁBRICA PARA INSCRIPCIÓN
                                                                                      PREVENTIVA EN REGISTROS
                                                                                      PÚBLICOS                                                                                                                                                                    NO
                                                                                                                                                                                                                   SI                    PLANOS
                                                                                                                                                     CORRECCIÓN DE
                                                                                                                                                                                                                                       OBSERVADOS
                                                                                      DEPENDENCIAS QUE INTERVIENEN:                                  PLANOS Y OBRA




    (Peru), to obtain an Automatic Building
                                                                                                                                                                                                                                           ¿?
                                                                                      - DIV. DE EDIFICACIONES
                                                                                      - COMISIÓN TÉCNICA
                                                                                      - DIV. DE                                                                                                                                                                LIQUIDACIÓN DE
                                                        55 DIAS HABILES                 NOMENCALTURA Y                                                                                       APROBACIÓN DE
                                                                                                                                                                                                                                                                DERECHOS DE
                                                                                        NUMERACIÓN                                                                                           CORRECCIONES
                                                                                                                                                                                                                                                              LICENCIA DE OBRA
                                                                                      - CAJA MUNICIPAL




    License requires an average of 222
                                                                                      - DIV. DECLARATORIA                                                                                                                                           2 Día
                                                                                           DE FABRICA Y
                                                                                      - OF. DE TRÁMITE                                                                                                               NOTIFICACIÓN
                                                                                        DOCUMENTARIO
                                                                                          (SÓLO PARA PRE                                                                                                                           3 DIAS
                                                                                          DEC. DE FÁBRICA)                                                              CANCELA
                                                                                                                                                                       DERECHOS




    working days (311 calendar days) under
                                                                                                                                                                                                                                                      CERTIFICACIÓN DE
                                                                                                                                                                                                                    LICENCIA DE OBRA Y
                                                                                                                             GESTIONA CONEXIONES                                                                                                     PREDECLARATORIA                  INSCRIPCIÓN
                                                                                                                                                                                           AUTENTICACIÓN              CERTIFICADO DE
                                                                                                                                DOMICILIARIAS                                                                                                           DE FABRICA                PREVENTIVA DE DEC. DE
                                                                                                                                                                                             DE PLANOS                 NUMERACIÓN
                                                                                                                                PARA LA OBRA                                                                                                           FUO 1 ANEXO.C                    FABRICA

                                                                                                                                                                                                1 DIA                                 5 DIAS




    optimum conditions.                                 VARIABLE
                                                        DEPENDE DEL
                                                        INVERSIONISTA Y DEL TIPO 6.- EJECUCION DE OBRA
                                                        DE OBRA
                                                                                      DEPENDENCIAS QUE INTERVIENEN:
                                                                                      - DIV. DE CONTROL DE
                                                                                        OBRAS
                                                                                                                                                            VENTA EN
                                                                                                                                                             PLANOS



                                                                                                                                                                                                                                                                                      ANOTACIONES
                                                                                                                                                                                                                                                                                     PREVENTIVAS DE
                                                        SE ESTIMA 7 MESES                                                                                                                                                                                                          INDEPENDIZACIÓN Y
                                                                                        (OPCIONAL EN                                                                                                                                                                                 COMPRA VENTA
                                                                                         OPCIÓN B)
                                                                                                                                                                                                                        LA SUPERVISION
                                                                                                                            CULMINACIÓN DE OBRAS                                                                           DE OBRA
                                                                                                                              DE CONSTRUCCIÓN                                                                           OPCIONAL EN LA
                                                                                                                                                                                                                         MODALIDAD B




•   Standards are so high and regulations                                                                                        VARIACIONES
                                                                                                                                SEGÚN PLANOS
                                                                                                                                 APROBADOS
                                                                                                                                      ¿?
                                                                                                                                                       NO
                                                                                                                                                                     DECLARACIÓN DE
                                                                                                                                                                      FINALIZACION DE
                                                                                                                                                                    OBRA Y SOLICITUD DE
                                                                                                                                                                      CERTIFICACIÓN

                                                                                                                                                                                             ADMISIÓN A TRÁMITE
                                                                                                                                                                                                                                INSPECCIÓN OCULAR




    so rigid that owners prefer to let
                                                                                                                                                                                                                                     INFORME
                                                                                                                                          SI
                                                                                                                                                                         CANCELA
                                                                                                                                                                        DERECHOS                        1 DIA                       18 DIAS

                                                                                                                           PLANOS DE REPLANTEO DE
                                                                                                                               CONSTRUCCIÓN                                               LIQUIDACIÓN DE DERECHOS                                       CERTIFICADO DE
                                                                                                                                                                                                ADICIONALES




    buildings collapse
                                                                                                                                                                                                                                                    FINALIZACIÓN DE OBRA Y
                                                                                      7.- CERTIFICADO DE FINALIZACIÓN DE
                                                                                                                                                                                                                                                         ZONIFICACION
                                                                                      OBRA Y ZONIFICACIÓN

                                                        EN CONDICIONES ÓPTIMAS 8.- DECLARATORIA DE FABRICA
                                                        (SIN VARIACIONES                                                                                                                                                                                                 1 DÍAS
                                                        RESPECTO A LOS PLANOS DEPENDENCIAS QUE INTERVIENEN:                                                                               APROBACIÓN DE PLANOS DE
                                                        APROBADOS)             - DIV. DE CONTROL DE                                                                                             REPLANTEO
                                                                                        EDIFICACIONES                                                                                              FOM
                                                        25 DÍAS HÁBILES               - DIV. DE
                                                                                        DECLARATORIA DE
                                                                                                                                  RECEPCIÓN
                                                                                        FABRICA
                                                                                      - OF. TRAMITE
                                                                                        DOCUMENTARIO
                                                                                      - CAJA MUNICIPAL




                                  Arq. Manuel de la Barra                                                                          TRAMITA
                                                                                                                              DECLARATORIRICA DE
                                                                                                                                     FAB
                                                                                                                                    FUO 2
                                                                                                                                                                        CANCELA
                                                                                                                                                                       DERECHOS
                                                                                                                                                                                            ADMISIÓN A TRÁMITE
                                                                                                                                                                                                                                EVALUACIÓN
                                                                                                                                                                                                                                  INFORME
                                                                                                                                                                                                                                                          DECLARATORIA DE
                                                                                                                                                                                                                                                              FABRICA
                                                                                                                                                                                                                                                              EN FUO 2




                                  In Geoff Payne, 2010
                                                                                                                                                                                                                                      2 DIA                            2DIAS
                                                                                                                                                                                                        1 DIA

                                                                                                                                   RECEPCIÓN
These are the problems…

1. Political motivation
2. Technical issues
3. Enforcement issues


     What are the solutions?
Questions for the workshop participants

1. Political Will: How do we make the issue of building standards a priority within national
   and local governments? How do we get over the hurdles of political inertia?

2. Implementation: How can we improve the implementation of building standards? What
   are different approaches to increase compliance, or improve building practices?

3. Informal construction: How do we increase safety of non-engineered structures? How to
   improve building practices in the informal sector?

4. Participation: How can community-based processes for developing building standards
   offer solutions? How can these scaled up or replicated?

5. Responsibility: Where should the locus of responsibility lie for safe building? Who
   should be responsible for safety of buildings?


30 minutes for discussion
Please prepare 1 minute feedback to plenary
Principles to guide code revision efforts
Practical Action (ITDG) offers some principles to guide code revision efforts:
•   Relevance: revisions should be relevant to environmental and economic
    circumstances and deeply rooted in local cultures and living habits
•   Cost reduction: changes must result in cost reductions so that adequate and
    affordable shelter is attainable for all
•   Focus: focus on improving conditions for poor in informal settlements
•   Participation of all sectors of housing delivery process
•   Flexible to allow for interpretations, variety of materials and technical
    solutions, innovations
•   Access: legislation should be easily accessible and widely disseminated
•   Incremental improvement of dwelling and surroundings can happen
•   Procedures: plan approval fast, free from corruption and inexpensive for builder.
Yahya, Saad, Elijah Agevi, Lucky Lowe, Alex Mugova, Oscar Musandu-Nyamayaro and Theo Schilderman
(2001), „Double Standards, Single Purpose: Reforming Housing Regulations to Reduce poverty‟, ITDG
Publishing, London
Innovations in Building Regulations




     Modified from B. Levy, Innovations in Global Regulations, World Bank Working Paper 4851, 2011


Loop #1 – Change social norms: multistakeholder participation and credibility
Loop #2 – Increase compliance: social norms, engagement and credibility
New Paradigm:
       Culture of Safety/Compliance

• Multistakeholder engagement
• Increased ownership/use through participation
• More accessible/simpler rules by involvement of
  local private sector, masons/builders, etc
• BE professionals – training for DRR/safety
• Target guidance for informal construction – annex
• Increased awareness through use of mass media
New Paradigm:
increasing the evidence of positive experiences


  •   Kenya             •   Malawi
  •   Indonesia         •   Gujarat/India
  •   Vietnam           •   Namibia
  •   El Salvador       •   Thailand
RICS DMC Experiences

Providing free technical assistance to governments – and
   working with civil society to create multistakeholder
   platforms

• Three examples:
   1.   Kenya
   2.   Haiti
   3.   Malawi
Kenya
Professor Saad Yahya, RICS DM Commissioner, worked with
Practical Action: to make Kenyan building codes more relevant

 •   Creation of a multistakeholder platform – including built
     environment professionals, private sector builders, local
     masons, civil society, government officials, etc

 •   Lobbied parliament and city authorities – to improve
     Kenyan building code

 •   Key lesson: changing codes does not change building
     culture/compliance. Need to improve education and
     awareness – incentives for building safely
Malawi
With Govt. of Malawi and Red Cross/UN-Habitat

•   Malawi - no building codes. Following 2010
    earthquake, created guidelines for safer construction of non-
    engineered rural homes – with a multistakeholder platform (BE
    professional institutions, private sector builders, local
    masons, civil society, government officials, etc)

•   Key success: guidelines used in all government and WB funded
    projects, Malawi RC, NGOs, vocational training colleges and
    communities. Provides platform for development of locally
    appropriate building codes. Key lesson – again, about
    communication and education
Haiti – key initiatives
Creating a culture of safety/compliance by:
   1. Participative development of codes with all stakeholders –
      increase ownership, raise awareness and ensure greater
      simplicity for non-engineered structures.
   2. Accessible/simple to benefit the poor - 90% of homes self-
      built or by local masons
   3. Use mass media for awareness raising
   4. Invest in training – especially at community level
   5. Improve training of local professionals
   6. Improve capacity of government officials
Haiti
With Govt. of Haiti and local civil society platform

  •   Technical assistance for government ministries/officials
  •   Key initiatives: local civil society platform (coordinated by
      Plan Haiti and Habitat Haiti), masonry skills training at
      community level and increasing their engagement with
      building codes development, partnership with local
      universities to develop module on building codes for
      engineers/architects/surveyors, retrofitting pilot project
  •   Key success: World Bank provided funding for codes
      development, WB consultant: ‘since RICS DMC
      initiative….different initiatives have moved ahead….more
      important is the institutional framework and political
      sensibility that increased’
Participatory development of standards that work for the
                   poor: Windhoek, Namibia
•Population 223,000 (2001)
• 26% of people living in informal   •Recognition that housing policies were not
                                     working for very poor; making health conditions
settlements                          worse for them

                                     •Shack Dwellers International, local government,
                                     NGO professionals develop progressive
                                     regulations for land and housing policies

                                     •Makes propositions for types of tenure based on
                                     affordability. Only seeking cost recovery for
                                     infrastructure

                                     •Changes to laws:
                                          •More than one family sharing ownership of a plot
                                          •Reducing plot sizes
                                          •Allowing incremental building
     (Mitlin and Muller, 2004)
                                          •Flexible on types of materials used
Negotiating building standards that work for the poor: The experience of National Union
of Low Income Community Organisations (NULICO) in Thailand

Baan Mankong ‘secure housing’ programme, is an innovative slum upgrading programme
administered by the national government’s Community Organisations Development
Institute (CODI), which fosters cooperation between low-income
communities, government authorities (from municipalities to public land owners), and
architects.

Offers subsidies, financing and technical advice for low-income settlements lacking
security of tenure.

The programme is based around the principal of communities forming savings groups
and organising themselves to manage the process.

As of November 2011, the programme had built over 90,813 houses in 1,546
communities across 277 cities and towns in Thailand


(http://www.codi.or.th)
In early 2011 a new national building standard was approved for use in the Baan
Mankong programme

This new standard has been developed by National Union of Low Income Community
Organisations (NULICO) together with various communities nationwide

The standards have been designed to respond to how people actually build their homes
given constraints of space and affordability.

Five-year process of negotiation. Ten national-level demonstrations about need for new
codes

Reduced setback to 1m, reduced distance between houses, reduced minimum width of
plot/house

Fire wall, tanks in each house (people now follow this with the new codes)

Can only be applied to a community (collective) housing project developed through the
government. Not available in individuals or private developers
Benefits of the new codes
 - People have developed it, so they
 realise the importance
 -Risk reduction (especially for fires)
 -conforming to codes is required
 for good cooperation between
 Baan Mankong communities and
 local authorities. Need to have
 projects approved to have support
 from local authorities.
 -used to get around this paying
 bribes, etc
 -For Bangkok Municipal
 Authority, they can now support
 these projects because they are
 legal
Improving Building Safety – Lessons from other
                      countries
               Next Steps – two specific requests:
•    Keen to explore more initiatives with central/local governments to review
     existing codes and provide free support for revision/creation of improved
     codes

•    Increasing partnership with academic institutions with expertise in
     earthquake engineering for evaluation of codes for RICS/Unesco Global
     Building Codes Mapping project

                             skataria@rics.org
                     www.rics.org/disastermanagement

                          cassidy.johnson@ucl.ac.uk
            University College London, Development Planning Unit

More Related Content

Viewers also liked

Práctica 15
Práctica 15Práctica 15
Práctica 15apcr1234
 
Notebook check 3 p. 21 30
Notebook check 3 p. 21 30Notebook check 3 p. 21 30
Notebook check 3 p. 21 30jdpyatt
 
DomCode 2015 - Abusing phones to make the internet of things
DomCode 2015 - Abusing phones to make the internet of thingsDomCode 2015 - Abusing phones to make the internet of things
DomCode 2015 - Abusing phones to make the internet of thingsJan Jongboom
 
Call Centers & PM – Análisis de Caso - Juan Carlos González
Call Centers & PM – Análisis de Caso - Juan Carlos GonzálezCall Centers & PM – Análisis de Caso - Juan Carlos González
Call Centers & PM – Análisis de Caso - Juan Carlos GonzálezCentro de e-Learning. UTN FRBA
 
Actividad volcánica.
Actividad volcánica.Actividad volcánica.
Actividad volcánica.caaarmen_99
 
Ciclo do Empreendedor + Checklist Modelo de Negócio
Ciclo do Empreendedor + Checklist Modelo de NegócioCiclo do Empreendedor + Checklist Modelo de Negócio
Ciclo do Empreendedor + Checklist Modelo de NegócioAlessandro Saade
 
Hebrew leaders, moses ppt 2
Hebrew leaders, moses ppt 2Hebrew leaders, moses ppt 2
Hebrew leaders, moses ppt 2jdpyatt
 
Oxidative stress final
Oxidative stress finalOxidative stress final
Oxidative stress finalsanchu yadav
 
biocomposite ppt.
biocomposite ppt.biocomposite ppt.
biocomposite ppt.1shweta007
 
NIST WiFi Security SP 800-97
NIST WiFi Security SP 800-97NIST WiFi Security SP 800-97
NIST WiFi Security SP 800-97David Sweigert
 
Business Analysis Canvas [Canvas para Análise de Negócio]
Business Analysis Canvas [Canvas para Análise de Negócio]Business Analysis Canvas [Canvas para Análise de Negócio]
Business Analysis Canvas [Canvas para Análise de Negócio]Rildo (@rildosan) Santos
 

Viewers also liked (13)

Tabla
TablaTabla
Tabla
 
Práctica 15
Práctica 15Práctica 15
Práctica 15
 
Notebook check 3 p. 21 30
Notebook check 3 p. 21 30Notebook check 3 p. 21 30
Notebook check 3 p. 21 30
 
DomCode 2015 - Abusing phones to make the internet of things
DomCode 2015 - Abusing phones to make the internet of thingsDomCode 2015 - Abusing phones to make the internet of things
DomCode 2015 - Abusing phones to make the internet of things
 
Call Centers & PM – Análisis de Caso - Juan Carlos González
Call Centers & PM – Análisis de Caso - Juan Carlos GonzálezCall Centers & PM – Análisis de Caso - Juan Carlos González
Call Centers & PM – Análisis de Caso - Juan Carlos González
 
Actividad volcánica.
Actividad volcánica.Actividad volcánica.
Actividad volcánica.
 
Ciclo do Empreendedor + Checklist Modelo de Negócio
Ciclo do Empreendedor + Checklist Modelo de NegócioCiclo do Empreendedor + Checklist Modelo de Negócio
Ciclo do Empreendedor + Checklist Modelo de Negócio
 
Hebrew leaders, moses ppt 2
Hebrew leaders, moses ppt 2Hebrew leaders, moses ppt 2
Hebrew leaders, moses ppt 2
 
3 sangue
3 sangue3 sangue
3 sangue
 
Oxidative stress final
Oxidative stress finalOxidative stress final
Oxidative stress final
 
biocomposite ppt.
biocomposite ppt.biocomposite ppt.
biocomposite ppt.
 
NIST WiFi Security SP 800-97
NIST WiFi Security SP 800-97NIST WiFi Security SP 800-97
NIST WiFi Security SP 800-97
 
Business Analysis Canvas [Canvas para Análise de Negócio]
Business Analysis Canvas [Canvas para Análise de Negócio]Business Analysis Canvas [Canvas para Análise de Negócio]
Business Analysis Canvas [Canvas para Análise de Negócio]
 

More from Global Risk Forum GRFDavos

Disaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian DohertyDisaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian DohertyGlobal Risk Forum GRFDavos
 
Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...Global Risk Forum GRFDavos
 
Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...Global Risk Forum GRFDavos
 
Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...Global Risk Forum GRFDavos
 
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...Global Risk Forum GRFDavos
 
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...Global Risk Forum GRFDavos
 
C&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLAC&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLAGlobal Risk Forum GRFDavos
 
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...Global Risk Forum GRFDavos
 
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...Global Risk Forum GRFDavos
 
Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...Global Risk Forum GRFDavos
 
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...Global Risk Forum GRFDavos
 
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANOGlobal Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANOGlobal Risk Forum GRFDavos
 
Capacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDACapacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDAGlobal Risk Forum GRFDavos
 
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...Global Risk Forum GRFDavos
 
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...Global Risk Forum GRFDavos
 
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...Global Risk Forum GRFDavos
 
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...Global Risk Forum GRFDavos
 
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...Global Risk Forum GRFDavos
 
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...Global Risk Forum GRFDavos
 
A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...Global Risk Forum GRFDavos
 

More from Global Risk Forum GRFDavos (20)

Disaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian DohertyDisaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian Doherty
 
Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...
 
Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...
 
Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...
 
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
 
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
 
C&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLAC&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLA
 
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
 
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
 
Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...
 
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
 
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANOGlobal Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
 
Capacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDACapacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDA
 
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
 
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
 
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
 
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
 
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
 
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
 
A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...
 

Recently uploaded

Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEMISSRITIMABIOLOGYEXP
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...Nguyen Thanh Tu Collection
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroomSamsung Business USA
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Osopher
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxMadhavi Dharankar
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
DBMSArchitecture_QueryProcessingandOptimization.pdf
DBMSArchitecture_QueryProcessingandOptimization.pdfDBMSArchitecture_QueryProcessingandOptimization.pdf
DBMSArchitecture_QueryProcessingandOptimization.pdfChristalin Nelson
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...HetalPathak10
 

Recently uploaded (20)

Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom
 
Mattingly "AI & Prompt Design" - Introduction to Machine Learning"
Mattingly "AI & Prompt Design" - Introduction to Machine Learning"Mattingly "AI & Prompt Design" - Introduction to Machine Learning"
Mattingly "AI & Prompt Design" - Introduction to Machine Learning"
 
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptx
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
DBMSArchitecture_QueryProcessingandOptimization.pdf
DBMSArchitecture_QueryProcessingandOptimization.pdfDBMSArchitecture_QueryProcessingandOptimization.pdf
DBMSArchitecture_QueryProcessingandOptimization.pdf
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
 

Increasing disaster resilience through participative development of standards in land management, urban planning and construction

  • 1. PRO-POOR BUILDING CODES FOR DRR By Cassidy Johnson, UCL DPU & Shailesh Kataria, RICS
  • 2. Workshop outline 1h 30m • Presentation • Context • Main problems • Small Group Discussion • Feedback • Case Studies
  • 3. What is RICS? • Royal Institution of Chartered Surveyors • Non-profit professional organisation – with a „public interest‟ mandate • Sets standards & promotes best practices for all aspects of land, property and construction • Started in England, but is now global - 100,000 members in 150 countries
  • 4. RICS Disaster Management Commission Mission • To bring the skills of RICS and other built environment professionals to strengthen capacity of vulnerable communities to reduce disaster risks and improve disaster recovery  18 Commissioners/staff  250 volunteers (professionals and their firms) www.rics.org/disastermanagement
  • 5. Earthquakes don’t kill, buildings do! Haiti – over 200,000 deaths New Zealand – 0 deaths
  • 6. HFA Priority 4: ‘…incorporate DRR, including enforcement of building codes’ Resilient Cities Campaign Checklist 6: ‘…enforce realistic risk compliant building regulations…’
  • 7. RICS DMC Project with UNESCO/GTFBC: ‘Global Building Codes Mapping’ 2011 HFA Progress Report:  63 countries mention building codes  3 countries report they have no building codes Most poor/vulnerable people build informally – beyond scope of building codes
  • 8. Why ineffective action on BC? Cost of complying with building codes – perceived to be a key constraint. Is that a myth?
  • 9. Why ineffective action on BC? Research by Saad Yahya/Practical Action, RICS, Unesco, UNISDR, IFRC/SKAT, UNCRD, etc: 1. Political motivation 2. ‘Technical’ issues 3. Enforcement issues
  • 10. 1. Political Motivation • Long-term project: Results of safe building, in terms of lives saved, is not immediately visible • Can require large changes in land management systems, technical capacity • Insurmountable problem • Political hurdles to make changes, many vested interests
  • 11. Political hurdles in the application of building codes: Turkey after the 1999 earthquake ❖Prior to 1999 earthquake, municipal engineers were not able to check design calculations thoroughly because of their heavy workload or their professional qualification. This has always been identified as one of the core reasons for failure of code enforcement Gülkan, 2010 Düzce town centre before 1999 earthquakes Düzce after 1999 earthquakes
  • 12. Political hurdles in the application of building codes: Turkey after the 1999 earthquake ❖After earthquake strong political motivation to improve building construction supervision „Decree with Power of Law,‟ No. D595 “Building Construction Supervision” ❖New system whereby construction supervision firm assumed functions of municipality - supervisory role in checking design calculations and actual construction activity at building site. Public agent ensuring materials, workmanship, detailing requirements fulfilled. Needed to have ten- year duration liability insurance coverage for each job. ❖Opposition campaign by professional groups, lack of ability for supervision firms to attain insurance, changes needed to be made in civil law, commercial law and insurance law ❖Decree was rescinded in 2001 and replaced by law L4708, 19 provinces. 2010 was extended to all provinces. However, still places responsibility on municipality. Gülkan, 2010
  • 13. 2. Technical issues • Lack of technical expertise to implement, especially in smaller towns • Overly complicated standards, especially for simple construction • High proportion of informal building, non- engineered structures • Rigid/unrealistic codes – for ex. allowing incremental building
  • 14. Standards are not appropriate for the way people can build Bangladesh National Building Code ✤ Minimum standard housing density 75 units/hectare, average 5 persons/dwelling. ✤ The minimum plot size between 30 sq. m to 25 sq. m. Minimum width of walkways 3 m. ✤ Individual plot max. of 75% land coverage, 1.5 m open space at the front. Minimum size of the 1st habitable room is 9 sq. m and the 2nd, 6 sq. m; 15 sq.m total. ✤ No option of incremental development ✤ No considerations about addressing climate and other risks varying in different locations. (from Jabeen and Mallick, 2009)
  • 15. 3. Enforcement Issues • Lack of capacity to enforce compliance with standards, to make checks and issue permits • Overly complicated procedures for obtaining legal permits
  • 16. PROCEDIMIENTOS Y INVERSIONISTA REGISTROS PLAZOS DEPENDENCIAS DE LA MML MUNICIPALIDAD O PROMOTOR PÚBLICOS QUE INTERVIENEN Overly complicated procedures for INFORMACIÓN INICIA GESTIÓN PRELIMINAR 1.-CONSULTA PRELIMINAR SE INFORMA ORIENTACIÓN ADQUISICIÓN DE CARPETA DE VARIABLE TRÁMITE CANCELA DERECHOS EN CONDICIONES ÓPTIMAS DEPENDENCIAS QUE INTERVIENEN: - OF. TRAMITE CARPETA DE 1 DÍA HÁBIL DOCUMENTARIO TRÁMITE building approvals - DIV. DE EDIFICACIONES - CAJA MUNICIPAL 2.- CERTIFICADO DE PARAMETROS URBANISTICOS Y EDIFICATORIOS CANCELA DERECHOS Y CERTIFICADO DE SEGÚN REGLAMENTO PRESENTA SOLICITUD ADMISIÓN A TRÁMITE DE PARÁMETROS URBANÍSTICOS DEPENDENCIAS QUE INTERVIENEN: FOM EXPEDIENTE EDIFICATORIOS - OF. TRAMITE 5 DÍAS HÁBILES DOCUMENTARIO - OPDM 5 DIAS - CAJA MUNICIPAL • 4 Días Of all regulatory constraints, research EVALUACIÓN PRELIMINAR INSPECCIÓN OCULAR PRESENTA EXPEDIENTE PRECALIFICACIÓN 2 Día 3. ANTEPROYECTO EN CONSULTA FOM ELABORACIÓN DE PLANOS ADMISIÓN A TRÁMITE DE DICTAMEN DE C. TÉCNICA DE ANTEPROYECTO CANCELA DERECHOS EXPEDIENTE ACTA DE CALIFICACIÓN DEPENDENCIAS QUE INTERVIENEN: Se estima 30 días hábiles RESOLUCIÓN 4Días - OF. TRAMITE Para planos de arquitectura NOTIFICACIÓN DOCUMENTARIO más shows that administrative - DIV. DE 1 Día 1 Día EDIFICACIONES GESTIÓN - COMISIÓN TÉCNICA 15 DIAS HABILES - CAJA MUNICIPAL 10 DIAS NOTIFICACIÓN procedures are invariably the greatest 3 DIAS 4. CALIFICACIÓN DE PROYECTO Y LICENCIA AUTOMÁTICA PRESENTA OPCIÓN B AUTOLIQUIDACIÓN barrier to conformity. ELABORACIÓN DE ADMISIÓN A TRÁMITE DE FUO 1 ANEXO D EXPEDIENTE DE EXPEDIENTE TÉCNICO DEPENDENCIAS QUE INTERVIENEN: CANCELA DERECHOS PROYECTO DEFINITIVO 1 Día - OF. TRAMITE DOCUMENTARIO 03 DÍAS HABILES - DIV. DE EDIFICACIONES LICENCIA - CAJA MUNICIPAL AUTOMÁTICA DE OBRA 2 DÍAS PRECALIFICACIÓN DE INICIO DE OBRAS DE PROYECTO, CONSTRUCCIÓN DICTAMEN DE C. TÉCNICA ACTA DE CALIFICACIÓN RESOLUCIÓN NOTIFICACIÓN • 5.- LICENCIA DE OBRA Y CERTIFICADO In the historical centre of Lima DE NUMERACION OPCIONAL: PREDECLARATORIA DE 45 DIAS FÁBRICA PARA INSCRIPCIÓN PREVENTIVA EN REGISTROS PÚBLICOS NO SI PLANOS CORRECCIÓN DE OBSERVADOS DEPENDENCIAS QUE INTERVIENEN: PLANOS Y OBRA (Peru), to obtain an Automatic Building ¿? - DIV. DE EDIFICACIONES - COMISIÓN TÉCNICA - DIV. DE LIQUIDACIÓN DE 55 DIAS HABILES NOMENCALTURA Y APROBACIÓN DE DERECHOS DE NUMERACIÓN CORRECCIONES LICENCIA DE OBRA - CAJA MUNICIPAL License requires an average of 222 - DIV. DECLARATORIA 2 Día DE FABRICA Y - OF. DE TRÁMITE NOTIFICACIÓN DOCUMENTARIO (SÓLO PARA PRE 3 DIAS DEC. DE FÁBRICA) CANCELA DERECHOS working days (311 calendar days) under CERTIFICACIÓN DE LICENCIA DE OBRA Y GESTIONA CONEXIONES PREDECLARATORIA INSCRIPCIÓN AUTENTICACIÓN CERTIFICADO DE DOMICILIARIAS DE FABRICA PREVENTIVA DE DEC. DE DE PLANOS NUMERACIÓN PARA LA OBRA FUO 1 ANEXO.C FABRICA 1 DIA 5 DIAS optimum conditions. VARIABLE DEPENDE DEL INVERSIONISTA Y DEL TIPO 6.- EJECUCION DE OBRA DE OBRA DEPENDENCIAS QUE INTERVIENEN: - DIV. DE CONTROL DE OBRAS VENTA EN PLANOS ANOTACIONES PREVENTIVAS DE SE ESTIMA 7 MESES INDEPENDIZACIÓN Y (OPCIONAL EN COMPRA VENTA OPCIÓN B) LA SUPERVISION CULMINACIÓN DE OBRAS DE OBRA DE CONSTRUCCIÓN OPCIONAL EN LA MODALIDAD B • Standards are so high and regulations VARIACIONES SEGÚN PLANOS APROBADOS ¿? NO DECLARACIÓN DE FINALIZACION DE OBRA Y SOLICITUD DE CERTIFICACIÓN ADMISIÓN A TRÁMITE INSPECCIÓN OCULAR so rigid that owners prefer to let INFORME SI CANCELA DERECHOS 1 DIA 18 DIAS PLANOS DE REPLANTEO DE CONSTRUCCIÓN LIQUIDACIÓN DE DERECHOS CERTIFICADO DE ADICIONALES buildings collapse FINALIZACIÓN DE OBRA Y 7.- CERTIFICADO DE FINALIZACIÓN DE ZONIFICACION OBRA Y ZONIFICACIÓN EN CONDICIONES ÓPTIMAS 8.- DECLARATORIA DE FABRICA (SIN VARIACIONES 1 DÍAS RESPECTO A LOS PLANOS DEPENDENCIAS QUE INTERVIENEN: APROBACIÓN DE PLANOS DE APROBADOS) - DIV. DE CONTROL DE REPLANTEO EDIFICACIONES FOM 25 DÍAS HÁBILES - DIV. DE DECLARATORIA DE RECEPCIÓN FABRICA - OF. TRAMITE DOCUMENTARIO - CAJA MUNICIPAL Arq. Manuel de la Barra TRAMITA DECLARATORIRICA DE FAB FUO 2 CANCELA DERECHOS ADMISIÓN A TRÁMITE EVALUACIÓN INFORME DECLARATORIA DE FABRICA EN FUO 2 In Geoff Payne, 2010 2 DIA 2DIAS 1 DIA RECEPCIÓN
  • 17. These are the problems… 1. Political motivation 2. Technical issues 3. Enforcement issues What are the solutions?
  • 18. Questions for the workshop participants 1. Political Will: How do we make the issue of building standards a priority within national and local governments? How do we get over the hurdles of political inertia? 2. Implementation: How can we improve the implementation of building standards? What are different approaches to increase compliance, or improve building practices? 3. Informal construction: How do we increase safety of non-engineered structures? How to improve building practices in the informal sector? 4. Participation: How can community-based processes for developing building standards offer solutions? How can these scaled up or replicated? 5. Responsibility: Where should the locus of responsibility lie for safe building? Who should be responsible for safety of buildings? 30 minutes for discussion Please prepare 1 minute feedback to plenary
  • 19. Principles to guide code revision efforts Practical Action (ITDG) offers some principles to guide code revision efforts: • Relevance: revisions should be relevant to environmental and economic circumstances and deeply rooted in local cultures and living habits • Cost reduction: changes must result in cost reductions so that adequate and affordable shelter is attainable for all • Focus: focus on improving conditions for poor in informal settlements • Participation of all sectors of housing delivery process • Flexible to allow for interpretations, variety of materials and technical solutions, innovations • Access: legislation should be easily accessible and widely disseminated • Incremental improvement of dwelling and surroundings can happen • Procedures: plan approval fast, free from corruption and inexpensive for builder. Yahya, Saad, Elijah Agevi, Lucky Lowe, Alex Mugova, Oscar Musandu-Nyamayaro and Theo Schilderman (2001), „Double Standards, Single Purpose: Reforming Housing Regulations to Reduce poverty‟, ITDG Publishing, London
  • 20. Innovations in Building Regulations Modified from B. Levy, Innovations in Global Regulations, World Bank Working Paper 4851, 2011 Loop #1 – Change social norms: multistakeholder participation and credibility Loop #2 – Increase compliance: social norms, engagement and credibility
  • 21. New Paradigm: Culture of Safety/Compliance • Multistakeholder engagement • Increased ownership/use through participation • More accessible/simpler rules by involvement of local private sector, masons/builders, etc • BE professionals – training for DRR/safety • Target guidance for informal construction – annex • Increased awareness through use of mass media
  • 22. New Paradigm: increasing the evidence of positive experiences • Kenya • Malawi • Indonesia • Gujarat/India • Vietnam • Namibia • El Salvador • Thailand
  • 23. RICS DMC Experiences Providing free technical assistance to governments – and working with civil society to create multistakeholder platforms • Three examples: 1. Kenya 2. Haiti 3. Malawi
  • 24. Kenya Professor Saad Yahya, RICS DM Commissioner, worked with Practical Action: to make Kenyan building codes more relevant • Creation of a multistakeholder platform – including built environment professionals, private sector builders, local masons, civil society, government officials, etc • Lobbied parliament and city authorities – to improve Kenyan building code • Key lesson: changing codes does not change building culture/compliance. Need to improve education and awareness – incentives for building safely
  • 25. Malawi With Govt. of Malawi and Red Cross/UN-Habitat • Malawi - no building codes. Following 2010 earthquake, created guidelines for safer construction of non- engineered rural homes – with a multistakeholder platform (BE professional institutions, private sector builders, local masons, civil society, government officials, etc) • Key success: guidelines used in all government and WB funded projects, Malawi RC, NGOs, vocational training colleges and communities. Provides platform for development of locally appropriate building codes. Key lesson – again, about communication and education
  • 26. Haiti – key initiatives Creating a culture of safety/compliance by: 1. Participative development of codes with all stakeholders – increase ownership, raise awareness and ensure greater simplicity for non-engineered structures. 2. Accessible/simple to benefit the poor - 90% of homes self- built or by local masons 3. Use mass media for awareness raising 4. Invest in training – especially at community level 5. Improve training of local professionals 6. Improve capacity of government officials
  • 27. Haiti With Govt. of Haiti and local civil society platform • Technical assistance for government ministries/officials • Key initiatives: local civil society platform (coordinated by Plan Haiti and Habitat Haiti), masonry skills training at community level and increasing their engagement with building codes development, partnership with local universities to develop module on building codes for engineers/architects/surveyors, retrofitting pilot project • Key success: World Bank provided funding for codes development, WB consultant: ‘since RICS DMC initiative….different initiatives have moved ahead….more important is the institutional framework and political sensibility that increased’
  • 28. Participatory development of standards that work for the poor: Windhoek, Namibia •Population 223,000 (2001) • 26% of people living in informal •Recognition that housing policies were not working for very poor; making health conditions settlements worse for them •Shack Dwellers International, local government, NGO professionals develop progressive regulations for land and housing policies •Makes propositions for types of tenure based on affordability. Only seeking cost recovery for infrastructure •Changes to laws: •More than one family sharing ownership of a plot •Reducing plot sizes •Allowing incremental building (Mitlin and Muller, 2004) •Flexible on types of materials used
  • 29. Negotiating building standards that work for the poor: The experience of National Union of Low Income Community Organisations (NULICO) in Thailand Baan Mankong ‘secure housing’ programme, is an innovative slum upgrading programme administered by the national government’s Community Organisations Development Institute (CODI), which fosters cooperation between low-income communities, government authorities (from municipalities to public land owners), and architects. Offers subsidies, financing and technical advice for low-income settlements lacking security of tenure. The programme is based around the principal of communities forming savings groups and organising themselves to manage the process. As of November 2011, the programme had built over 90,813 houses in 1,546 communities across 277 cities and towns in Thailand (http://www.codi.or.th)
  • 30. In early 2011 a new national building standard was approved for use in the Baan Mankong programme This new standard has been developed by National Union of Low Income Community Organisations (NULICO) together with various communities nationwide The standards have been designed to respond to how people actually build their homes given constraints of space and affordability. Five-year process of negotiation. Ten national-level demonstrations about need for new codes Reduced setback to 1m, reduced distance between houses, reduced minimum width of plot/house Fire wall, tanks in each house (people now follow this with the new codes) Can only be applied to a community (collective) housing project developed through the government. Not available in individuals or private developers
  • 31. Benefits of the new codes - People have developed it, so they realise the importance -Risk reduction (especially for fires) -conforming to codes is required for good cooperation between Baan Mankong communities and local authorities. Need to have projects approved to have support from local authorities. -used to get around this paying bribes, etc -For Bangkok Municipal Authority, they can now support these projects because they are legal
  • 32. Improving Building Safety – Lessons from other countries Next Steps – two specific requests: • Keen to explore more initiatives with central/local governments to review existing codes and provide free support for revision/creation of improved codes • Increasing partnership with academic institutions with expertise in earthquake engineering for evaluation of codes for RICS/Unesco Global Building Codes Mapping project skataria@rics.org www.rics.org/disastermanagement cassidy.johnson@ucl.ac.uk University College London, Development Planning Unit