How to train your Project Managers

  1. 1997%%
  2. CASAGRANDE OMOREGIE
  3. PROJECT MANAGERS HOW TO YOUR A FRAMEWORK FOR PROJECT MANAGEMENT
  4. SUPPORTED BY SUPPORTED BY SUPPORTED BY SUPPORTED BY A
  5. A
  6. Competency # → 1 B ← Competency Level Fulfilled Competency symbol → The ability to (Develop, Perform or Adopt) → I ← Project Phase 1 B 2 B * I 3 S 4 S 5 S 6 B P P P P 7 B 8 B 9 S 10 B 11 S 12 S 13 B P P E * E MC E 14 S 15 B 16 S 17 18 B 19 B 20 S 21 B 22 G E * E E * * C C C PA Project Approval Project Closure PS Develop Schedule CS PA Project Approval Project Transition Benefits Management MT IC SILVER L PT Identify & Register Risks BMEP Control Scope Manage Team Information & Communication Negotiation DS Define Scope PB RP SP IS S Safety GOLD N WB BRONZE Develop WBS PLMR Manage Resources Stakeholder Identification Define & Control Budget Validate Scope Achievement QA Quality Assurance Support Procurement VSCC Control Change Leadership Ethics& Professionalism A
  7. 5.4 Develop WBS Each project has a Work Breakdown Structure (WBS): The WBS provides the project team with a framework of what has to be delivered. By decomposing work into work packages, activities can be built, scheduled, estimated, monitored and controlled. 1. Evaluate historical WBS structures from previous projects and adopt similar structure in own project 2. Support the project scheduler in building the project WBS construct in Primavera P6 3. Where required, independently conducts scope definition by determining appropriate decomposition for various WBS elements 4. Attend brainstorming sessions and support/contribute to the development of a project WBS 5. Lead the development of the WBS involving schedulers and key stakeholders 6. Verify correctness of the WBS through peer checks and consultations with other stakeholders 7. Thoroughly understand and apply the standard for WBS development
  8. AN 1.Existing External Assessment Report 2.Project Controllers 360 Feedback 3.Projects Deep-Dives 4.Interviews with Project Manager
  9. A Instructor Led BRONZE TRAINING Manage a Bronze Project Manage a Silver Project Manage a Gold Project Simulation Led SILVER TRAINING Instructor Led GOLD TRAINING Assessment & Exemptions Lifecycle Training Project Sponsor Training
  10. THANK YOU FOR ATTENDING THE PRESENTATION Please don't forget to collect your CPD certificate during the event from the CPD collection area.
  11. THANK YOU FOR ATTENDING THE PRESENTATION Please don't forget to collect your CPD certificate during the event from the CPD collection area.