Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Profile-FvanSteenveldt

299 views

Published on

  • Be the first to comment

  • Be the first to like this

Profile-FvanSteenveldt

  1. 1. August 2015 1 Profile Personal Data Name: Frans van Steenveldt Nationality: Netherlands Residence: Wijchen, the Netherlands Mobile: +31 (0)6 53 42 86 70 Email: frans.van.steenveldt@tmc.nl Media: Website: http://appliedplm.nl Summary I am a senior SAP Business and Application Consultant in the area of Product Data Management (PDM) and Product Lifecycle Management (PLM). The basis is formed by my extensive knowledge and hands-on experience in the domain of technical product-development and engineering processes. Extensive experience, detail focused, results oriented Business and IT professional with 12+ years in SAP PLM and 5+ years in SAP ABAP application development in intense customer-focused service industries. Demonstrated business intelligence to accurately assess situational challenges and transform creative ideas into repeatable technical solutions. I have a professional and pragmatic attitude in order to achieve the agreed targets/objectives. I have the drive and motivation to achieve high quality project deliverables while having a good understanding of the adjustment between business processes and IT solutions. During my professional career I have gained people-management and communication skills allowing me to work with people from different backgrounds in education, experience and culture. I have also hands-on experience in communications with globally outsourced resources. I am proficient at learning and applying new business and technological methodologies. SAP Core Skills & Competences  Material Master Data Management (MM, BOM)  SAP Functional area’s (SAP MM/SD, SAP PP, SAP PM and SAP PS)  Document Management (DMS, Content Server, EasyDMS)  SAP R/3 Enterprise 4.7, ECC 5.0 and ECC 6.0 (EhP7)  Classification (including Variant Configuration)  Customizing Master Data (MM,DMS, ECM, BOM, iPPE, VC, PM)  Integrated Product and process Engineering (iPPE, Product Structures and Assembly Structures)  ABAP program design and programming: ABAP Objects, Dialog, SAPScript, SmartForms, ALV, BAdI, Enhancement Framework, etc..  SAP PLM7.02 (WebUI, NWBC, Access Control Contexts)  WebUI: WebDynpro, Webservices (SOAP, ABAP-Proxies),  EH&S: Dangerous Goods Management, Phrase Management and Specifications  Business Workflow modeling and Workflow programming (BOR/ABAP Classes)  EHSM: Product Compliance  Process / Data modeling (UML)  Engineering Record / Process Layer  Data Analysis / Data migration (LSMW)  Engineering Change Management (ECM)  Authorizations (Objects/Roles/Profiles)  Business Rules Framework (BRF-Plus)  Application, Process and End-user Training  Guided Structure Synchronization (GSS, EngineeringBOM → ManufacturingBOM)  Interfaces between PLM and SAP (e.g. Siemens TeamCenter-SAP)  CAD-SAP Integration (CAD DESKTOP)  ITIL-Processes
  2. 2. August 2015 2 Industry Experience Railways High-Tech/Opto-electronics  Medical Systems Electronics Engineering Automotive Industrial Automation  Oil & Gas Office Equipment Additional Skills & Competences Teamwork: Ability to work effectively in international team environments, including autonomous decision making and team leadership where necessary Communication: Strong verbal and written communication skills Organizational: Demonstrated ability to follow directions, act on own initiative where appropriate, handle pressure, manage project schedules and resources to meet deadlines and budgets Problem Solving: Strong analytical skills as required in complex cross-disciplinary environments, business processes and systems Creativity: Demonstrated skills in order to design/develop new systems or functionality including implementation in the productive systems Interpersonal: Demonstrated ability to establish good working relationships Qualifications & Educations Title Organization Description NET310 SAP Education Fundamentals of WebDynpro for ABAP BC401 SAP Education ABAP Objects (OO Programming) BIT611 SAP Education Business Workflow Programming BIT601 SAP Education Business Workflow Modeling BC400 SAP Education ABAP Workbench Foundations MDM100 SAP Education SAP NetWeaver Master Data Management SAP-LDM Atos Origin SAP PLM Lifecycle Data Management PMA Atos Origin/ISES Project Management Academy SCM QA Systems Software Configuration Management SEM Philips Electronics Software Engineering Management IBW IBW Utrecht Business Administration HTS-I IHBO Venlo Bachelor Technical Computer Science HTS-E HTS Den Bosch Bachelor Electronic Engineering Languages Language Proficiency Language Proficiency Dutch Native German Business Fluent English Business Fluent French Basic Career Summary Period Company/Organization Roles 2008-today TMC Technology Executives Senior SAP PLM Business Consultant 1998-2008 Atos Origin Senior SAP PLM Business Consultant 1996-1998 Holec Projects Engineering Manager / Project Manager 1992-1996 Multin Technology Project Leader / Team Lead 1981-1992 Océ R&D Electronics Engineer / Team lead
  3. 3. August 2015 3 Assignment History / Detailed description Company: McLaren, Woking (Surrey), United Kingdom Period: Continuing since August 2015 Organization: McLaren IT (Center Of Excellence, CoE) Project Title: Accelerated ERP Deployment; SAP R5 Programme Project Context: McLaren Automotive and SAP SE are implementing a new SAP system running on SAP HANA (with Enhancement Package 7). Included in this deployment program is the implementation of SAP PLM7.02 WebUI (Engineering Record/Process Layer, Product Structures (PSM), Assembly Structures (ASM) and Guided Structure Synchronization (GSS)) and EHSM Product Compliance. The Center Of Excellence (CoE) will be responsible for maintaining the processes/systems. Role(s): SAP PLM Application Consultant, ABAP Consultant Job Description: Within the SAP R5 Programme, system integrations test are being prepared (test-script/scenario’s, roles assignment, systems setup, etc.). To enable McLaren CoE to maintain the processes/systems, actual knowledge (business processes/solutions) must be transferred. The CoE will support the integration tests. Job Activities: Activities (CoE):  Accommodate/support knowledge transfer of all SAP-PLM related business process/solutions into McLaren IT Center Of Excellence,  Manual client set-up (Integration tests, Production),  Support integration tests: o Defect root-cause analysis, o Repair (ABAP(OO), Webdynpro Components) and unit testing, o Adjust technical specifications, o Support Data migration.  Prepare for Go-Live,  End-user training,  Support offshore development team (Cognizant) in India. __________ Company: ProRail, Utrecht, The Netherlands Period: April 2015 – August 2015 Organization: Competence Center ERP Project Title: Validations in SAP PLM Project Context: ProRail is responsible for the maintenance of the rail infrastructure of the public Netherlands Railways (Nederlandse Spoorwegen). Rail infrastructure objects (master data) are modeled in SAP Plant Maintenance as functional locations/equipments to support and allow operational maintenance processes. To ensure better/consistent master data, these objects will also be modeled in SAP-iPPE structures, representing rail infrastructure templates. From these template structures, new equipments (structures) can be automatically created. During creation, validation-steps (in SAP) must be implemented to ensure consistent master data.
  4. 4. August 2015 4 Role(s): SAP PLM Application Consultant (iPPE, Variant Configuration, Enterprise Asset Management, Plant Maintenance) Job Description: Investigate the possibilities to automate validations in SAP, while maintaining the master data for rail infrastructure objects/assets. Job Activities: The activities include:  Prepare/conduct workshops with rail-infrastructure specialists,  Describe requirements and investigate/indicate the possible functional realization in SAP PLM and SAP-EAM,  As part of the solution for maintaining the validation rules, SAP Business Rules Framework (BRF-Plus) will also be investigated,  Prepare a Proof-of-Concept for the selected objects; this means additional customizing (iPPE, Variant Configuration), ABAP(OO, Webdynpro)-programming and testing. __________ Company: DB Systel GmbH (Deutsche Bahn), Frankfurt am Main (Hessen), Germany Period: May 2015 – July 2015 Organization: Archivierung & Dokumenten-Management-Systeme (T.SVC 43) Project Title: WeDoiT System/process Project Context: DB Systel GmbH developed for Deutsche Bahn the WeDoiT System/process. The main objective of the WeDoiT is to maintain (historical) vehicle- configuration and -documentation. In order to minimize manual work and to improve data quality, the WeDoiT System will have a new interface to the main maintenance support system ISI to exchange vehicle data. Role(s): SAP PLM Consultant, ABAP Consultant Job Description: During the period I was assigned to the design of the new ISI-WeDoIT Interface. Job Activities: Activities included:  With business representatives, determine the functional requirements of the new ISI-WeDoIT Interface,  Create the technical design and write the technical specification for the ISI-WeDoIT Interface. __________ Company: SAP Turkey, Istanbul, Turkey Period: January 2015 Organization: SAP Turkey Education Project Title: SAP PLM170 training Role(s): SAP PLM Application Consultant/Trainer Job Description: Provide employees of customer of SAP Turkey with a thorough understanding of SAP iPPE functionality, including customization for iPPE. Job Activities: The activities included:
  5. 5. August 2015 5  Preparation of the training sessions (presentations/exercises),  Conduct training PLM170 (Integrated Product/Process Engineering (iPPE)within PLM). __________ Company: McLaren, Woking (Surrey), United Kingdom Period: August 2014 – December 2014 Organization: McLaren IT/Cognizant Project Title: Accelerated ERP Deployment Programme Project Context: McLaren Automotive and SAP SE are implementing a new SAP system running on SAP HANA (with Enhancement Package 7). Included in this deployment program is the implementation of SAP PLM7.02 WebUI (Engineering Record/Process Layer, Product Structures (PSM), Assembly Structures (ASM) and Guided Structure Synchronization (GSS)) and EHSM Product Compliance. Role(s): SAP PLM Application Consultant, ABAP Consultant Job Description: Currently, McLaren Automotive uses a legacy system MAXIM which has an online asynchronous interface with VPM/CATIA (Virtual Product Modeling). The current MAXIM2VPM-interface must be replaced with a new interface: SAP- VPM/CATIA. Product- and Assembly-Structures based on iPPE-Structures must be replicated online in VPM/CATIA. Job Activities: Design and implementation of a new SAP-VPM/CATIA Interface application:  Design of the software architecture, based on ABAP Objects,  Create technical specifications including unit test specifications,  Implement new SAP2VPM Interface core functions using ABAP Objects (ABAP-Interfaces, Class-Hierarchies, etc.),  Implement connection to SAP-PI using ABAP-Proxies,  Design and implement exception handling (Class-Exceptions),  Design and implement application logging,  Design/implement/integrate new Webdynpro Components,  Implement Enhancements in standard PLM7.02 Webdynpro,  Execute technical/unit tests,  Execute functional tests,  Support offshore development team (Cognizant) in India. __________ Company: Carl Zeiss AG, Oberkochen (Baden-Württemberg), Germany Period: March 2014 – October 2014 Organization: Global SAP PLM & CAD support Project Title: SAP PLM7.02 (WebUI) implementation Project Context: Carl Zeiss AG implemented an Engineering Change Management (ECM) process based on the Engineering Record/Process Layer in SAP PLM7.02 (running on SAP ECC6.0 with Enhancement Package 6). End users are accessing SAP
  6. 6. August 2015 6 PLM7.02 functions through NetWeaver Business Client (NWBC) 4.0. Furthermore Carl Zeiss has also implemented SAP Embedded Search (SES) using the SAP-TREX search-engine. Role(s): SAP PLM Application Consultant, ABAP Consultant Job Description: Support, test and enhance the rollout of the new ECM process to other lines of business. Investigate and implement performance improvement measures. Job Activities: Activities included:  Development of enhanced PLM7.02 ECM-Process functionality,  Create functional- and technical specifications,  Failure analysis and solution proposals,  Implement solutions (Customizing, ABAP OO),  Execute technical- and functional tests,  Design/implement performance improvement measures (report to delete table entries),  Roll-out support,  End-user support. __________ Company: DB Systel GmbH (Deutsche Bahn), Frankfurt am Main (Hessen), Germany Period: March 2013 – August 2014 Organization: Archivierung & Dokumenten-Management-Systeme (T.SVC 43) Project Title: WeDoiT System/process Project Context: DB Systel GmbH developed for Deutsche Bahn the WeDoiT System/process. The main objective of the WeDoiT is to maintain (historical) vehicle- configuration and -documentation. The WeDoiT System/process then allows the user to retrieve actual or historical configuration-information including valid documents. WeDoiT is based on SAP-iPPE Structures, where the different vehicle types and configurations (e.g. the high-speed ICE train) are modeled in various iPPE Product Variant Structure (PVS) models. Role(s): SAP PLM/iPPE Consultant, ABAP Consultant Job Description: During the period I had three assignments: 1. Investigate/improve PDN WeDoiT System/process performance. After two years of operation, the WeDoiT System suffers from a decreased performance. 2. Development/implementation of a new search for documents stored in the WeDoiT system. 3. Development/implementation of the DPC (DokumentenPrüfCenter). The DPC is a documents inspection process, where documentation from the supplier is submitted to a quality inspection process. The quality inspection process is controlled/monitored by a customer specific DPC- dashboard program supported by customer workflow processes. Job Activities: Activities included: WeDoiT System/process performance  Investigation of WeDoiT system performance,  Provided solutions in restructuring the iPPE-Structures and adjustments of dependent processes,  Preparation and ABAP-programming of the iPPE-restructuring programs,
  7. 7. August 2015 7  Adjust iPPE-customizing and adjust supporting customer programs. Document search:  Develop the programming- and technical test specifications for the Extended Document Search (Erweiterte Suchhilfe),  Performed the technical tests and made the necessary adjustments in the report program (ABAP, ALV-screens). DokumentenPrüfCenter:  Create functional- and programming-specifications for the DPC (DokumentenPrüfCenter),  Development of new BOR (Business Object Repository) objects including the required ABAP programming,  Modeling and implementation of the customer workflows using SAP Business Workflow,  Execute technical- and functional tests,  Support offshore development team in India. __________ Company: DAF Trucks, Eindhoven, The Netherlands Period: December 2009 Organization: IT-Department Project Title: SAP-PLM/iPPE overview training Role(s): SAP PLM Application Consultant/Trainer Job Description: Provide employees of DAF Trucks with a thorough understanding of SAP PLM functionality. Job Activities: The activities included:  Preparation of the training sessions (presentations/examples),  Conduct training PLM100 (Overview SAP Lifecycle Data Management),  Conduct SAP–iPPE training (integrated Product and Process Engineering). __________ Company: Siemens Energy Oil&Gas, Duisburg (NordRhein-Westfalen), Germany Period: September 2008 – March 2013 Organization: Siemens Energy Oil&Gas IT-Department, SAP PLM Application team Project Title: ATLAS-Project (SAP) Project Context: In 2006 Siemens Energy Oil&Gas started the ATLAS-project. The main objective of the ATLAS-project is to harmonize existing business processes in the different locations of the Siemens Energy Oil&Gas division. Also, the ATLAS SAP-Template was developed in order to implement/support the harmonized business processes. I joined the ATLAS-project in September 2008 during the roll-out preparation phase for Finspang (Sweden). The ATLAS SAP-system went live in October 2009 in Finspang (Sweden). The locations Görlitz and Nürnberg (both in Germany) went live in May 2011. The locations Duisburg (DE)/Hengelo (NL)/Erlangen (DE) went live in October 2102,
  8. 8. August 2015 8 and finally, the last site Brno (Czech Republic) went live in February 2013. Role(s): SAP PLM Application Consultant, ABAP Consultant, SAP PLM Support Consultant Job Description: Advise the SAP PLM business team on feasibility of proposed business solutions and implement these solutions. Actively support the ATLAS-maintenance/support group in solving incidents after the initial go-live of the ATLAS-system. Job Activities: SAP PLM Application Consultant:  Advise the SAP PLM (and related) business team on feasibility of proposed business solutions,  Prepare functional specifications, technical/programming specifications, customization specifications and test specifications,  Customizing and customizing tests,  Perform functional/technical tests for the RICEFW objects (Reports, Interfaces, Customizing, Enhancements, Forms and Workflows),  ABAP programming including ABAP OO (ABAP Objects),  Workflow modeling and workflow programming,  Preparing training and knowledge-transfer material,  Conduct ‘train-the-trainer’ knowledge-transfer sessions,  Prepare data migration/conversion specifications (using also LSMW) in the area of PLM master data (Material Master, Documents, BOM, ECM, etc.),  Conduct communications with global outsourcing. SAP PLM Application Support Consultant:  Actively support the ATLAS-maintenance/support group in solving incidents,  Problem analysis/solving, debugging and ABAP programming including ABAP OO (ABAP Objects), ALV-screens, SAP Dynpro, Smartforms, BAdI, Enhancement Framework, IDoc Interface/ALE, etc.,  SAP Workflow modeling and workflow programming,  End-user support. During this project I was able to gain knowledge in the following SAP areas: SAP-MM/SD, SAP-PP, SAP-PM, SAP-PS and some functions of SAP-EH&S. __________ Company: SAP Turkey, Istanbul, Turkey Period: July 2008 Organization: SAP Turkey Education Project Title: SAP PLM training Role(s): SAP PLM Application Consultant/Trainer Job Description: Provide employees of various customers (end-users, application support, etc.) of SAP Turkey with a thorough understanding of SAP PLM functionality. Job Activities: The activities included:  Preparation of the training sessions (presentations/exercises),  PLM 100 (Overview Lifecycle Data Management),  PLM 120 (Document Management),  PLM 130 (Classification),
  9. 9. August 2015 9  PLM 150 (Change Management and Configuration Management). __________ Company: Aesculap AG & Co KG. (BRAUN); Tuttlingen (Baden-Württemberg), Germany Period: April 2008 – July 2008 Organization: Competence Center CAD- and R&D Solutions Project Title: Testing SAP EasyDMS 6.0 SupportPackage 10 Role(s): SAP PLM Application Consultant Project Context: Aesculap has implemented SAP PLM (ECC 6.0) for supporting their product development process and is also using SAP-EasyDMS and the SAP-CAD- integration with CATIA V5. Job Description: Analyze and test new SAP EasyDMS functionality for direct use in the product development (business) processes. Actively support the support-team in solving incidents specifically around SAP EasyDMS. Job Activities: The activities included:  Test SAP EasyDMS,  Actively support the support group in solving incidents. __________ Company: Philips Healthcare; Best, The Netherlands Period: February 2005 - March 2008 Organization: Industrial Business Solutions (IBS) department; Product Lifecycle Data Management (PLDM) team Project Title: Various SAP PLM projects (see below) Role(s): SAP PLM Business and Application Consultant Project Context: Philips Healthcare is using SAP PLM functionality (Industrial CAMEL based on SAP ECC 5.0) to support their product design and engineering processes. Job Description: Analyze the business processes, define and prepare the business cases / scenarios including Blue Print composition. Preparation of functional specifications, customization specifications and conducting tests. In some cases also specifications for data migration/conversion had to be prepared. Also, preparation of the implementation/roll-out plans including the preparation and actual end-user training. Actively support the IBS-SAP-maintenance group in solving Incidents and Problem Reports and realizing and implementing Change Requests in the area of SAP PLM. Job Activities: 1. Supporting the pilot of Agile-PDM and the interface from Agile to SAP (2007, 2008), 2. Implementing, including Bill-of-Material migration, a new documents-on- BOM concept (2007, 2008), 3. Implementation and roll-out of SAP Easy-DMS (Document Management)
  10. 10. August 2015 10 (2007, 2008), 4. Prepare and perform a quick scan Blue Print for the roll-out of current SAP kernel functionality to the location of Philips Medical Systems in Haifa (Israël) (2007), 5. Define, design and implement new Product Safety & Approbation functionality in products (Material Master) (2007), 6. Migration/conversion of the material/Bill-of-Material/Product Configuration into the new One XRay Factory Best (OXB) in SAP (2007); the project comprised also a redefinition of the product configurations in SAP (Variant Configuration), 7. Define (blueprint), design and implement new SAP-iPPE (GEN/PVS) functionality for supporting the design/engineering process (2006, 2007), 8. Redefine and implement a new SAP Document Management user authorization concept (2006), 9. Testing and support in the area of SAP Variant Configuration (including SIEBEL) during the implementation of a new release of SAP R/3 (from SAP Enterprise 4.7 to SAP ECC 5.0) (2006), 10. Define (blueprint), design and implement an Electronic Signaturing process of SAP DMS documents using SAP-Workflow and Web-application (2006), 11. Replacement, including material master data migration, of the central components database legacy system (MPDLight) into SAP PLM (2005). __________ Assignment History / Overview (> 8 years) Period: October 2005 -December 2005 Company: Atos Origin; Veldhoven, The Netherlands Project Title: SAP-PLM training (internal project) Role(s): SAP PLM Application Consultant/Trainer Period: July 2004 - February 2005 Company: ASML Lithography; Veldhoven, The Netherlands Project Title: Systems Configuration Management program (various projects) Role(s): SAP PLM (lead) Application Consultant Period: February 2004 - July 2004 Company: Atos Origin; Veldhoven, The Netherlands Project Title: Development of the SAP Enterprise Product Data Portal (internal project) Role(s): SAP PLM (lead) Consultant Period: December 2003 - February 2004 Company: Philips Consumer Electronics; Eindhoven, The Netherlands Project Title: PLM Consulting and functional tests of ECM2 PDM-system Role(s): PDM/PLM Consultant Period: July 2003 – November 2003 Company: Philips Medical Systems; Best, The Netherlands Project Title: Investigate SAP-iPPE functionality
  11. 11. August 2015 11 Role(s): SAP PLM Consultant Period: January 2003 - July 2003 Company: Atos Origin; Veldhoven, The Netherlands Project Title: SAP-PLM in Product Development (internal project) Role(s): SAP PLM Consultant Period: January 2002 – July 2002 Company: Philips Lighting; Eindhoven, The Netherlands Project Title: PDML-project implementation assessment Role(s): PLM/PDM Consultant Period: January 2001 – January 2002 Company: Philips Lighting; Eindhoven, The Netherlands Project Title: International roll-out of PDML-system Role(s): Project manager Period: October 2000 – December 2000 Company: Origin/Philips Lighting; Eindhoven, The Netherlands Project Title: Hand-over of PDML to Application Management and Managed Operations Role(s): Project manager Period: December 1999 - October 2000 Company: PTC/Origin; Minneapolis/Veldhoven, USA/The Netherlands Project Title: Windchill-BAAN interface Role(s): Project Manager / PLM Consultant

×