Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

BlackFriday Promotion - IBM  C9010-262 BrainDumps Updated 2017

1,799 views

Published on

Buy IBM C9010-262 exam brainddumps at discount price. We offer C9010-262 exam dumps in multiple formats try free demo to get best format for C9010-262 exam preparation.
https://www.dumpskey.com/ibm/c9010-262-braindumps

Published in: Education
  • Be the first to comment

  • Be the first to like this

BlackFriday Promotion - IBM  C9010-262 BrainDumps Updated 2017

  1. 1. GET ORACLE 1Z0-062 EXAM DUMPS FOR GUARANTEED SUCCESS IBM C9010-262 Exam
  2. 2. Question: 1 IBM C9010-262 BRIANDUMPS PDF DEMO A customer has ordered an E870. The system has been built, but cannot be shipped What would prevent the system from being shipped? A. The mandatory pre-install TDA has not been completed B. The IBM System Support representative has not completed the pre- install site visit. C. A pre-sale TDA discovered correctable issues that have not been corrected. D. The opportunity owner has not released it. Answer: B https://www.dumpskey.com/ibm/c9010-262-braindumps
  3. 3. Question: 2 What is the most cost-effective Capacity on Demand (CoD) offering that will allow a new analyze the effects of activating two cores on an E870 and 32GB of memory for one month? A. Trial B. Elastic C. Enable Mobile Activation D. Utility Answer: A IBM C9010-262 Briandumps PDF Demo https://www.dumpskey.com/ibm/c9010-262-braindumps
  4. 4. IBM C9010-262 Briandumps PDF Demo Question: 3 A client is evaluating business continuity and high availability solutions for their mission critical trading application. Which of the following offerings provides a clustered solution that will minimize unplanned downtime? A. Inactive Partition Mobility B. PowerHA SystemMirror C. Remote Restart D. Live Partition Mobility Answer: B https://www.dumpskey.com/ibm/c9010-262-braindumps
  5. 5. Question: 4 A customer wants to migrate two IBM i 7.2 IPARs to their existing E880. Each LPAR needs VIOS will not be implemented. Which solution will satisfy the customer's needs? A. Four PCIe3 12GB Cache RAID SAS adapters and two 5887s (mode 1). each with 12 SSDs B. Two PCIe3 1 2GB Cache RAID SAS adapters and two 5887s (mode 1), each with 12 SSDs C. Four PCle3 12GB Cache RAID SAS adapters and one 5887 (mode 2) with 24 SSDs D. Two PCIe3 12GB Cache RAID SAS adapters and one 5887 (mode 2) with 24 SSDs Answer: D IBM C9010-262 BRIANDUMPS PDF DEMO https://www.dumpskey.com/ibm/c9010-262-braindumps
  6. 6. Question: 5 A customer has a tape drive zoned to an 8Gb FC adapter that is dedicated to one LPAR. Which needs to be shared between Four LPARs. Network and storage are being accessed through SEA and NPIV. In addition to assigning the adapter to the VIOS, what else needs to be done? A. Reassign the tape to client LPARs as needed. B. Complete the vSCSl connectivity and map the tape to client partition C. Assign the tape drive to the partitions. D. Complete the NP1V connectivity and map the tape to client partition. Answer: D IBM C9010-262 BRIANDUMPS PDF DEMO https://www.dumpskey.com/ibm/c9010-262-braindumps
  7. 7. IBM C9010-262 Exam https://www.dumpskey.com/ibm/c9010-262-braindumps

×