Why Do The Consulting Engineers Stress On Maintaining Pipe Casing Integrity?

  1. FERNANDES & ASSOCIATES PTY LTD Why Do the Consulting Engineers Stress on Maintaining Pipe Casing Integrity? GROUND FLOOR, UNIT 2, 141 CAMPBELL STREET, BOWEN HILLS QLD
  2. TODAY'S PRESENTATION DISCUSSION OUTLINE A Brief Background Movement Moisture Intrusion How Can These Pipe Casing Ends Be Located and the Issue be Remediated? Second Step - Using the Specialized Tools Third Step - Getting in Touch with the Right Contractor Fourth Step - Deliverables
  3. Gas and oil pipelines have a tendency to remain buried in soil or else immersed in water since they are corrosion-prone. So, the submerged or buried pipelines need to be electrically isolated from the other underground metallics structures, till the pipelines and other related structures are interconnected electrically and protected cathodically as a single unit.
  4. Cathodic protection eliminates corrosion damage, and most elements have the ability in changing throughout the lifetime of the pipeline, which could render it ineffective protection.
  5. So, the consulting engineer instructs on the maintenance of pipe casing integrity.
  6. MOVEMENT The pipeline’s casing and carrier pipe, over time are subjected to movement. Thus, the casing and carrier pipe in contact with one another are at risk that is even termed as metallic coupling. It is sure to cause a “shorting” or an interference compromising the cathodic protection.
  7. Moisture Intrusion Casings even risk moisture intrusion. The improperly sealed endings, or else a broken vent pipe are hindrances. The excess moisture bonds the carrier pipe to the casings and leads to electrolytic coupling, thus shorting the cathodic protection.
  8. Whatever the case may be, a hazard is always present. Hence, the consulting engineers directly in fixing it right within six months of identification.
  9. Changing Topography Gas or pipelines have the tendency in being cased under railway lines and roadways, and most are being used for 20 - 50 years. Surface topography changes over time and the underground casings locations could no longer be in alignment with its originally traversing railways and roadways. Data records, despite their existence, their reliability is unlikely.
  10. How Can These Pipe Casing Ends Be Located and the Issue be Remediated?
  11. First Step - Permitting As the pipeline owner or operator, you need to follow the advice of the consulting engineers about a potential shorted casing. Engineers visit the location for analysing the site- specific characteristics to determine the needed elements for identifying the exact locale of casing ends.
  12. AS PIPELINES NOW TEND TO BE LOCATED NEAR THE RAIL LINES AND ROADWAYS, TYPICALLY IT NEEDS A SUBSTANTIAL PERMITTING AMOUNT. SO, THE ENGINEERS WORK ACCORDING TO THE LAWS COMPLIANT WITH THE COUNTRY, CITY AND STATE. AS SOON, AS THE PERMIT IS APPROVED AND ISSUED, THE ENGINEERS START WORKING.
  13. SECOND STEP - USING THE SPECIALIZED TOOLS Engineers approximate the location of the casing ends by reading the frequencies making use of the geophysical tools, such as electromagnetic instruments and ground- penetrating radar. Next, the engineers utilise the vacuum excavation and point out the casing end.
  14. Once the engineers have identified the ends, they use survey-grade equipment for mapping them, so anyone having this information will be able to locate them easily in the future. For making it more accessible, the engineers add a marker ball while backfilling the location. Next, they use materials on the basis of the surrounding area to create a temporary core patch, like Cold Patch for asphalt, Utilibond for concrete.
  15. THIRD STEP - GETTING IN TOUCH WITH THE RIGHT CONTRACTOR Now it is time, for working with qualified contractors for repairing or remediating the issue. The contractors excavate the necessity and fix the problem by extracting precise information on the location of pipe casing ends.
  16. In case, a pipeline is located in a high traffic area, then both the engineers and contractors install a testing station in a safer spot. With all the repairs being complete, they backfill it, and then they install a permanent patch.
  17. FOURTH STEP - DELIVERABLES The final step is surveying the locations of the test stations and the new vents. Then, the engineers create the needed CAD files, Keyhole Markup Language Zipped files for Google Earth and shape-files for an internal GIS system. Bundling them all together with the test reports, they are produced to the owner that is you.
  18. TO GET IN TOUCH AND HIRE THE MOST ADVANCED AND EXPERIENCED CONSULTING ENGINEERS, AND STRUCTURAL ENGINEERS, THEN CONTACT US AT FERNANDES & ASSOCIATES PTY LTD.
  19. CONTACT INFORMATION Mailing Address GROUND FLOOR, UNIT 2, 141 CAMPBELL STREET, BOWEN HILLS QLD 4006 Email Address info@fernandes.net.au Phone Number +61 411 760 565 website Address www.fernandes.net.au