Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

FERDINAND Q. PACLEB CV1

107 views

Published on

  • Be the first to comment

  • Be the first to like this

FERDINAND Q. PACLEB CV1

  1. 1. FERDINAND Q. PACLEB BONIFACIOST.,PATUBIG, MARILAO,BULACAN PHILIPPINES Phone: +971544179885 Email: fer_bab@yahoo.com CAREER QUALIFICATION Electrical Supervisor with more than 16 years experience in the fields of Loadbanks,transformers,switchgears, Generators, and other electrical equipment, operation,repair and maintenance. PROFILE: A HIGHLY COMPETENT ELECTRICAL SUPERVISOR/TECHNICIAN  With overseas experience in the Oil,Gas & Power Industries;knowledge of both onshore/ offshore construction and commissioning.  Can carry out, motivate, organizeand co-ordinatethe activities of a multi-cultural workforcewith performance evaluatingand coachingskills;  Can conductand organizetoolbox safety talks prior to specific task  Has systematic approach to commissioning,troubleshootingand diagnosingproblems associated with the electrical distribution,relay protection and AC/DC drives.  Has a high standard of health and safety awareness;  Has a good knowledge in interpretation and application of electrical engineeringschematic and wiring diagrams;  Hazardous location electrical equipment inspections (11kVto 33kV). PROFESSIONAL EXPERIENCE Nov. 2007 to July 2016 Service Supervisor Northbridge Middle FZE Responsiblefor maintainingtheLoadbanks, transformers,switchgears,isolators,generators,controls,installations, commissioning and operations in thefield. OTHER DUTIES AND RESPONSIBILITIES  MinimizeFleet equipment under repair and update records daily  Perform as a team to best achieverequired results.  Timely execution of regular maintenance servicingand repair for all equipment.  Timely submission and accuratecompletion of servicereports  Timely reaction to field breakdowns (in and out of hours)  Control of repeat failures on equipment.  Minimizeturnaround time of equipment returning from hires.  Ensure all equipment dispatched is prepared to the higheststandards.  Conducts all duties in a manner supportiveof the QHSE Management System  Perform job in accordancewith NME QHSE Management System.  Initiateany other duties considered essential for effective operations and service MAJOR PROJECTS COMPLETED: ISTIQLAL Feb. 24 to Apr. 6, 2016 Semi-Submersible Rig Caspian DrillingCompany/CSC Baku Azerbaijan Testing, commissioningof 4 X 3.78MVA Wartsila main Generator and 1 X 1.4MW Cummins Emergency Generator M1133 DSS38M Dec. 20 to Feb. 3, 2016 Semi-Submersible Rig Caspian Shipyard LLC/Caspian DrillingCompany Baku Azerbaijan
  2. 2. Testing, commissioningof 4 X 5.6MVA Wartsilamain Generator and 1 X 1.68MW Cummins Emergency Generator DADA GORGUD Sep 04 to 25 Sep, 2015 Jackup Drill Caspian DrillingCompany Baku Shipyard Baku Azerbaijan Testing, commissioning of 4 X 2.72MW Wartsilamain Generator and 1 X 1.68MW Cummins Emergency Generator. RIG DIYINA Aug. 11 to Sep 3, 2015 National DrillingCompany Dubai Drydocks World Dubai UAE Testing commissioningof 4 X 1.6MW Caterpillar Generators and 1 X 1375KVA (CAT) Emergency Generator. Houbara Farm Substation March to April 16,2015 ATECO Al Ain UAE Testing commissioningof 4 X 1.8MW FG WILSON Generator MERMAID ASIANA Feb. 8 to Mar. 8, 2015 VMS Asiana /NJC Power Limited AHM Marine LLC Al Qasimi Rd,Sharjah UAE Testing, commissioningof 6 X 1.6MW Cummins Generator. Energy Centre Nov 8 to Dec. 20, 2014 Larsen & Toubro Limited Presidential Palace Abudhabi UAE Testing, commissioningof 7 X 2.4MW MTU Generator. W42 Switching Station Sept 6 to Oct 8, 2014 Larsen & Toubro Limited Presidential Palace Abudhabi UAE Testing, commissioningof 3 X 2.4MW MTU Generator. MOS PROJECT May 16 to May 29, 2014 LAMPRELL ENERGY Port Khaleed, Sharjah UAE Load test 5 X 3516 Caterpillar Generator. AL RUMAILAH JACK-UP ACCOMMODATION/GPC April 6 to April 18 2014 GPC Yard, Mussafah Industrial Area Mussafah,United Arab Emirates Testing, commissioningof 4 WartsilaGenerators, 1 Cat emergency generator
  3. 3. AL YASAT RIG / NDC/GPC April 6 to April 18 2014 GPC Yard, Mussafah Industrial Area Mussafah,United Arab Emirates Testing commissioningof 4 X 1.6MW Caterpillar Generators and 1 X 1375KVA (CAT) Emergency Generator. SEAJACK HYDRA LAMPRELL LAMPRELL ENERGY Hamriyah Free Zone ShrajahUAE Testing, commissioningof 5 CAT Generators, Emergency generator plus UPS. TANESCO POWER PLANT/RSS 09 to 13December 2013 RSS 50MW Power Project Arusha,Tanzania,Africa Inspection & supervision of transformer Repairs,Oil Test, Tap setting. FRENCH NAVY 26 Nov. 2013 Abu Dhabi UAE NDC3/LAMPRELL 04Nov. 2013 Hamriyah Free Zone Sharjah UAE ADEN POWER SUBSTATION 23 July to 06 August 2013 Al Taqaa Global 54MW Power Project Aden Yemen Installation,commissioningof 2 X 5MVA TX, 1X 6.3MVA Containerized Transformer for Phase3 & 4, 54MW Power projectby Al Taqaa Global in Aden Yemen. KHARIR POWER PLANT PROJECT 08 January to 28 May 2013 TEPY Total / Technip 2 X 25MVA RollsroyceTurbine Block 10 Kharir EastShabwa Yemen Installation/commissioningof 20MVA Loadbank package(2 X 13MVA 33/11KV TX, Switchgear, Distribution Boards,800KVACummins Genset, 5X 6MVA Loadbank, 5X5MVA 11/.433kV Containerized transformers for testing, commissioningof 2X 25MVA RollsroyceTurbine,2 X 36MVA Scheneider Transformer, GIS containerized Substation. TANESCO POWER PLANT 22 October to 9 November 2012 RSS 50MW Power Project Arusha,Tanzania,Africa Inspection & supervision of transformer Repairs,Oil Filtration,Oil Test,Tap setting Protection settings. RAECO POWER PLANT 28 April 2012 to 15 August 2012 Dibba Oman Installation,commissioning and maintenanceof 2 X 5.8MVa Transformer, 3 x 1250KVa Cummins Generator, synchronized to the Power Grid. WIND CARRIER I 28 March 2012 to 25 April 2012 LAMPRELL ENERGY Jebel Ali Free Zone
  4. 4. Dubai,United Arab Emirates Testing, commissioningof 4 WartsilaGenerators,1 Cat emergency generator plus UPS. SEAJACK ZARATAN 04 February2012 to 23March 2012 LAMPRELL ENERGY Hamriyah Port Sharjah United Arab Emirates Testing, commissioningof 5 CAT Generators, Emergency generator plus UPS. WOOD GROUP TEST CELL FACILTY October 2011 to 02 Februry 2012 Oilfield Supply Company Jebel Ali Free Zone, Dubai UAE Installation of WoodGroup Test Facility 11.3MW Loadbank,Transformers,Switchgears, Distribution Boards,Transfer Switch, LV cables,MV cables,control cables,cabletrays etc. Testing and commissioningofLoadbanks,Transformers,Manual Transfer switch, and Distribution boards. AL JALAMID POWER PLANT 24 March 2011 to 12 June 2011 Maadeen Phosphate Company Arar, Kingdom of Saudi Arabia Installation,commissioning &maintenanceof 3.3MV Loadbank purchased by Maadeen Phosphate Company. FPSO BW ATHENA 25 January 2011 to 27 February 2011 DUBAI DRYDOCKS United Arab Emirates Testing of 5MW Solar Turbine, 4 RollsroyceGenerator and 1 Emergency generator. LAFARGE CEMENT FACTORY 26 June2010 to 23 October 2010 POWER PLANT Aleppo Syria Installation and commissioning of 2 X 6MVA Loadbank, 2 X 5.8 MVA transformer purchased by Lafarge Cement factory. Additional temporary installations of 4 X 6MVA Loadbank, 4 X 5.8MVA transformers for testing of 2 X 30MW Steam Turbine. DELBA III SEMI SUBMERSIBLE RIG 25 April 2010 to 15 June 2010 SBM OFFSHORE/CHEVRON GPC Yard Mussafah Industrial Area Abu Dhabi,United Arab Emirates Testing, commissioningof 8 X 3.8MW X 11KV EMD/Baylor Genset, 1 X 3.8MW X 480V 50HZ CAT generator 3516B plus UPS system. QATAR ALUMINUM PROJECT 15 September 2009 to 4 January 2010 PRIME POWER Umm Said Qatar Installation & commissioning of 2 X 5.8MVA transformer , 12 X 1.25MVA Cummins Generator fortesting of 3 X 11KV VFD MOTORS (Sea Water Lift Pump) FSO ASIA 15 July 2009 to 13 September 2009 OSG/EURONAV Dubai,Drydocks World Testing, commissioningof 5 Hyundai Generators, plus emergency generator.
  5. 5. BASS DRILL ALPHA 25June to 09 July 2009 Lamprell Energy Jebel Ali Free Zone Dubai UAE Testing, commissioningof 4 X 1.75 MVA CAT Generators, Emergency Generator plus UPS. LONE STAR SEMI SUBMERSIBLE RIG 04 May to24 June 2009 SBM OFFSHORE/CHEVRON GPC Yard Mussafah Industrial Area Abu Dhabi,United Arab Emirates Testing, commissioningof 8 X 3.8MW X 11KV EMD/Baylor Genset, 1 X 3.8MW X 480V 50HZ CAT generator 3516B plus UPS system. RIG AD-08 10 April to 03 May 2009 MaritimeIndustrial Services Khaleed Port Sharjah UAE Testing, commissioningof 4 x 1.75MVA CAT Generator, Emergency generator plus UPS. RIG 107 05 March 2009 to 07 April 2009 MaritimeIndustrial Services Khaleed Port Sharjah,UAE Testing, commissioningof 5 x 1.75MVA CAT Generator, Emergency generator plus UPS. FPSO KNOCK ALLAN 27 Nov 2008 to 28 February 2009 Fred Olsen Dubai Dry Docks United ArabEmirates Up to Cape Town South Africa Testing, commissioningof 20MW Steam turbine, Emergency Generator plus UPS. FPSO FRADE 22 July to 5 Nov 2008 SBM OFFSHORE/CHEVRON Dubai Drydocks World Testing, commissioningof 4 X 25MW GE Gas Turbines, CAT Emergency Generators & UPS Sytem. FPSO GIMBOA 15 March to 05 July 2008 SAIPEM ENI Dubai Drydocks World Testing, commissioningof 2 X 14MW Peter Brotherhoood Steam Turbine, Emergency generator plus UPS system. FAYED AIR BASE POWER PLANT 30 January 2008 to 22 February 2008 Contrack International Fayed City Egypt Testing, commissioningof 6 X 3516B 2000KW CAT Generator, Emergency generator plus UPS. MARCH 07, 2000 TO OCT 18, 2007 Senior Technician BYRNE EQUIPMENT RENTAL LLC. Responsiblefor Installation,operation,maintenance, of Generators, Loadbanks, and other electrical equipment.
  6. 6.  Carry out Repair and Preventive maintenance application on Load banks, Diesel Generators, Diesel driven Air Compressors,WeldingMachines and LightingTowers for hire  DG load testing, AVR calibration and functional testing of protective devices, Conversion of voltage, frequency and phase  Overhauling of AC generator , exciter and performs insulation resistance checking, Switchgear simulation and repair  Performs programming of EMCP/Power Wizard, PCC and speed adjustment on DG fuel injection pumps and electronic speed controller  Commissioningof newly purchased Caterpillar ,Cummins,FGWilson and Perkins Generator. MAJOR PROJECTS COMPLETED: RANI WORO RIG July 2007 to august2007 Dubai Drydocks World Dubai United Arab Emirates Testing, commissioningof 4 X 1750KVA CAT Generators, Emergency Generator. FPSO VITORIA April 2007 to June 2007 SAIPEM ENI Dubai Drydocks UAE Testing, commissioningof 3 X 14MW Solar Titan 130 Turbines, 1 X 11MW Peter Brotherhood Steam Turbine. ADEN STEEL POWER PLANT 17 November 2006 to 08 December 2006 Lajh Rajah Road AdenYemen Testing, commissioningof 4 X 7.68MW VM 32C MAK CAT Generator. SEDCO RIG 709 08 July 2006 to 05 August 2006 TRANSOCEAN Cape Town South Africa Testing, commissioningof 8 X 1750KVA EMD Generators. NEW KHUFF GAS PROJECT July 2005 to February 2006 TOTAL ABK PERSIAN GULF ABUDHABI Testing, commissioningof 2 X 15MW Siemens Demag Tornado Turbine, Cat Emergency Generator plus UPS. WEST AZERI 13 February 2005 to 28 April 2005 Mc Dermott International Inc. Baku Azerbaijan Testing, commissioningof 2 X 10MW RollsroyceTurbine,Cat Emergency Generator plus UPS. TRAINING QUALIFICATION: Computer literate with knowledge on Microsoft Excel, Word, Power Point, Outlook, MS Project. TRAINING COURSE TRAINING PROVIDER LOCATION DATE Cummins Power Generation Course Cummins MiddleEast FZE Jebel Ali Hotel Dxb Nov 11-Nov 16, 2003 Helicopter Underwater Escape Training ETSDC Mussafah Abu Dhabi June 20, 2005 FireFighting Trakhees Jebel Ali Free Zone March 05, 2010 WorkingSafety with Electricity CGU Safety & Risk Services Jebel Ali Free Zone Feb 19-Feb 20, 2012 Basic FirstAid Course Trakhees Jebel Ali Free Zone April 30,2012 English CourseB1.1 Eton Institute Dubai,UAE Jul 22-Aug 22, 2012 Oil Filled Distribution Transformers Federal Transformer Mussafah Abu Dhabi July 31, 2012 Drug & Alcohol in the Work Place Northbridge Middle East Jebel Ali Free Zone July 22, 2013
  7. 7. Work Health & Safety Fundamentals Northbridge Middle East Jebel Ali Free Zone July 22, 2013 Driver Safety Course Northbridge Middle East Jebel Ali Free Zone July 19, 2013 HazardouzSubstance on the Work Place Northbridge Middle East Jebel Ali Free Zone July 20, 2013 Advance HV Electrical Protection Course The Faraday Centre Ltd. Jebel Ali Free Zone Nov03-07, 2014 Basic OffshoreSafety Induction Training ETSDC Mussafah Abu Dhabi Jan. 26-30,2015 EDUCATIONAL BACKGROUND PRIMARY MALHACAN ELEMENTARY SCHOOL 1976 – 1982 SECONDARY SCHOOL MEYCAUAYAN COLLEGE 1982 – 1986 VOCATIONAL 1986 – 1987 GUZMAN INSTITUTE OF ELECTRONICS 1995 – 1996 ELECTRONICS TECHNICIAN COLLEGE UNIVERSITY OF THE EAST 1987 – 1992 ELECTRONICS & COMMUNICATION ENGINEERING Character References: Joan Fresto AssistantOperation Manager Northbridge Middle EastFZE joanfresto@crestchic.com Tel No. : +97148818655 George Verghese Technician Northbridge Middle EastFZE gilbertsolima@crestchic.com Tel No. : +97148818655

×