Piet Demeester - From Idea to Smart City

724 views

Published on

Piet Demeester - From Idea to Smart City

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
724
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
13
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • testing:funtionalityscalability and dimensioning stress testing: applyautomaticusagepattern (e.g.browsing, photo download, …) and stability Response times …Implementation and experimentalvalidation of VPAN solutiononlargescale test infrastructure (multcore/multiprocessor environment enablinglargenetworktopologies)
  • Advanced functionality testing by test users related to the project prior to install the equipment in a real-life environment with real test users. Real users don’t like bugs and interventions to fix bugs
  • Size of the test: 4 rooms, 7 elderly peopleShould be technologically stableStrong support required from care takers, family, friends, …Elderly people do not understand that you shows family pictures on a televisionThey like it very much when it is onNice to have interaction with ‘visitors’: subject to talk about (my grand-sun did …)Also interesting for occupational therapyTECHNICAL: 2 remote controls to be integrated in one PRACTICAL ISSUES: Expectations of the stakeholders are high ! They always want more (e.g. the Rest Home would like a full rollout Should work (they have not much patienceSmall scale field trial using iLab.t infrastructure. User research (interviews) to evaluate the usability & acceptance of the solution, to identify weak points
  • Size of the test: 4 rooms, 7 elderly peopleShould be technologically stableStrong support required from care takers, family, friends, …Elderly people do not understand that you shows family pictures on a televisionThey like it very much when it is onNice to have interaction with ‘visitors’: subject to talk about (my grand-sun did …)Also interesting for occupational therapyTECHNICAL: 2 remote controls to be integrated in one PRACTICAL ISSUES: Expectations of the stakeholders are high ! They always want more (e.g. the Rest Home would like a full rollout Should work (they have not much patienceSmall scale field trial using iLab.t infrastructure. User research (interviews) to evaluate the usability & acceptance of the solution, to identify weak points
  • IBBT is currently setting up living labs in a few focused areas, such as health care, new media.Large scale testing before introducing commercial solutions on the market
  • Piet Demeester - From Idea to Smart City

    1. 1. Session: Smart CitiesFrom Idea to Smart City<br />Piet Demeester<br />
    2. 2. From Idea to Smart city<br />bring allthe stakeholders<br />together in the the different phases<br />
    3. 3. IBBT: FromIdea to Living Lab<br />
    4. 4. Stakeholders<br /><ul><li>Interdisciplinary researchers (technology, sociology, law, economics, …)
    5. 5. Companies (manufacturers, service providers, …)
    6. 6. Municipalities and governments
    7. 7. End-users and their environment (family, care-takers, …)</li></li></ul><li>A specific case: TV Kiosk<br />
    8. 8. Case: Home for the Elderly “De Vijvers”<br />Important: <br /><ul><li>Social Inclusion (other residents, family, friends)
    9. 9. get information (photo’s, latest news, …)
    10. 10. play together (very simple games)
    11. 11. Personal Safety (is there somebody to help me ?)</li></li></ul><li>Concept: TV Kiosk<br />
    12. 12. Proof of Concept: Paper<br /><ul><li>User-centered design – Mock-ups</li></li></ul><li>Proof of Concept: Design<br /><ul><li>Technical design – The VPAN concept
    13. 13. Virtual Private Ad-Hoc Network = A secure and self-organizing virtual overlay network of distributed groups of nodes</li></li></ul><li>Proof of Concept: Lab<br /><ul><li>Technical design – application development</li></li></ul><li>Proof of Concept: Lab<br /><ul><li>Technical design – scalability testing
    14. 14. iLab.t Virtual Wall</li></li></ul><li>Proof of Concept: Lab<br /><ul><li>Functionality test</li></ul>iLab.t generic portable platform<br />
    15. 15. Limited Field Trial<br />
    16. 16. Limited Field Trial<br />
    17. 17. Living Lab<br /><ul><li>Next steps
    18. 18. Turn iLab.thardware/software into fully-fledged prototype (typ. by industry)
    19. 19. Large scale trials in real living environment
    20. 20. ‘Experience’ research
    21. 21. Refine solution
    22. 22. More advanced user research
    23. 23. Improved technical design
    24. 24.
    25. 25. Initiate product into the market
    26. 26.
    27. 27. Only when mature product, move to Smart City applications (full industrial deployment)</li></li></ul><li>In the Press: 10 December 2010<br />

    ×