Importance of
the Supply Chain
23 July 2015
Professor Rudi Klein
CEO, SEC Group
President, NEC Users’ Group
3
QUESTION
If the decision was left entirely to you
would you procure a building in the
way depicted in the diagram in the
next slide?
4
d
Design
team
Tier 1 contractor
Tier 2 contractor
Tier 3 contractor
Tier 4 contractor
Tier 5 contractor
Tier 6 contractor
 KPIs produced by Constructing Excellence over
decade 2000-2010 failed to show sustained
improvements in cost, predictability, productivity
and profitability.
 UK construction costs amongst the highest in EU
£
5
6
Lowest in Belgium, Germany and Scandinavia
WHY?
 Greater integration of design and construction.
 Extensive industrialisation of delivery process.
 Limited scale of sub-contracting and more harmonious
supply chains.
 Greater application of lean techniques.
 Well-paid, well-trained and highly productive workforce.
Source: EU Pilot Study Benchmarking Construction Costs in Member States by
Bernard Williams Associates (March 2006).
7
ANSWER: CONSTRUCTION SUPPLY CHAINS
ARE DYSFUNCTIONAL
LIFTS
THEY COMPRISE SMALL DISCRETE UNITS WHICH DO NOT COME
TOGETHER AS PART OF A CHAIN.
 50-70 tier 2 contractors/suppliers not uncommon.
 Typically 25% of tier 2 contracts on large projects
with a value in excess of £15m are for values
below £10,000!
 On all projects, between 50% and 75% of the
total value is accounted for by a small number of
tier 2 contractors and tier 1 contractor site
management team.
8
 But the delivery of the major tier 2 packages
is undertaken by a disaggregated tier 3 supply
chain.
 Even at the level of tier 3 contracting the work
carried out is often complex involving design,
logistics, high-tech components and systems,
coordination and integration with other trades.
SOURCE: BIS Research Paper No.145: Supply Chain Analysis
into the Construction Industry, October 2013 (research carried
out by EC Harris).
9
 High transaction costs.
 The extent of the fragmentation in the supply chain
militates against collaborative effort and waste
reduction.
 Duplication of multiple layers of profit, overhead and
risk is a major source of non-value added cost and
waste.
 High cost of managing and coordinating interfaces.
 Little scope for innovation in the supply chain.
10
11
COST TARGET
33% reduction in capital and whole life
costs by 2025*.
Achievable?
*based on 2009/10 government cost benchmarks
12
THE 4 “FLOWS”!
information flow
product flow
Cash flow
people flow
(ie teamwork)
 A supply chain should be project focussed with a full
understanding of the client’s objectives.
 A supply chain is a resource to support effective and
efficient management of the delivery process; there
needs to be channels of communication to share ideas,
options and to resolve problems.
 A supply chain plays a key role in risk management –
not risk dumping! (e.g. in addressing material
shortages, labour/skills shortages delays and price
hikes)
13
 A supply chain comprises competent firms that have
demonstrated their technical proficiencies and are
primarily selected for their ability to deliver.
 A supply chain comprises firms having a mutual
commitment to work together without recrimination to
achieve the best for project outcomes for the client.
14
 More reports and initiatives.
 More official working parties/committees.
 Re-inventing of wheels.
 Tinkering with existing processes.
15
 Implementation of existing solutions,
 to integrate the construction delivery
process,
 thereby, ensuring efficient delivery of
outcomes that consistently represent the
best value solution for the clients’ expressed
success criteria.
16
WE MUST AIM TO FULLY INTEGRATE OUR
PROCUREMENT DELIVERY PROCESSES
 Integrate the delivery team to achieve buy-in to
solutions.
 Integrate the insurance of risk to bring about a
no-blame culture.
17
 Integrate the cashflow process (i.e. PBAs).
 Integrate the contracts to achieve pro-active
risk management within the team.
 Integrate the technology through BIM with
emphasis on having a common data platform.
18
 Enables early supply chain involvement to
inform outcomes.
 Up to 80% of potential cost savings can be
achieved in the early design/planning stages;
primarily because design does not take account
of the technologies and skills in the supply
chain.
19
 Places focus on solutions that are best for the
project.
 Massively improves information flow.
 Promotes a flatter delivery process in place of
one comprising disconnected and sequential
inputs.
20
 Within the supply chain there are numerous liability
insurance policies covering the same type of risk with
the focus on establishing liability.
 Integrated project insurance (IPI) is now being trialled
as one of the model procurement routes set out in the
May 2011 Cabinet Office Construction Strategy.
 IPI is a financial loss policy that insures the cost plan
provided that it is underpinned by a robust risk
management process undertaken by the delivery
team.
21
 Project bank accounts have now gained momentum
throughout the UK.
 Environment Agency together with other
depts/agencies such as Highways England, Ministry
of Justice and DIO is using PBAs.
 PBAs promote collaboration through ensuring that
each member of the team is paid regularly from the
same “pot”.
22
 The whole team should be using the same suite of
contracts.
 If NEC is used the supply chain should be fully
engaged in the risk management mechanisms such
as contributing to the risk register and participating
in risk reduction meetings.
 The IPI procurement model is underpinned by an
Alliance Contract that embraces the key delivery
team members and provides for the governance of
the project.
23
 BIM is tailor made for project team integration through
enabling project participants to buy into design and risk
management solutions.
 At level 2 BIM the key requirement is a collaborative
data platform that allows the team to develop credible
data relating to the structure and its performance which,
then, can be handed over to the asset manager.
 But, traditional procurement and delivery processes are
impeding the use of BIM.
24
 Change has to be gradual; embedded cultures and
business models have to adapt.
 The Environment Agency has taken the lead in driving
procurement change through greater integration of the
delivery processes.
 Its use of PBAs and preparedness to trial IPI
demonstrate its commitment to achieve more efficient
outcomes from utilising the untapped potential in the
supply chain.
25
FORUM FOR THE BUILT
ENVIRONMENT PROCUREMENT
EVENT
Importance of
the Supply Chain
23 July 2015
Professor Rudi Klein
CEO, SEC Group
President, NEC Users’ Group
© Laing O’Rourke 2014, all rights reserved.27
SUPPLY CHAIN CAPACITY
ANDY BACON – HEAD OF PROCUREMENT: EUROPEAN HUB
© Laing O’Rourke 2014, all rights reserved.28
CONSULTANT VIEW – ‘INFLATION’
Consultant view:
- 3-5% Inflation on tender prices
Consultant
A
Consultant
B
Consultant
C
Consultant
D
Consultant
E
Consultant
F
UK Average NORTH WEST VIEW
© Laing O’Rourke 2014, all rights reserved.29
NORTH WEST – CAPACITY CHALLENGES
The number of construction projects underway in Manchester city centre has increased by 10% over the
past year.
Among the key findings of the study are:
• 13 schemes finished since last year
• that includes 320,000 sq ft of office space
• there were 390,000 sq ft of education and research facilities; built
• one hotel was developed in the last year
• 212 residential units were built
• and 1,457 student beds were created
• 23 schemes are currently under construction
• the number of construction projects underway is up 10%
• there were 15 new starts in the past 12 months
© Laing O’Rourke 2014, all rights reserved.30
Trade Date Escalation (%/£) Movement Comments
Concrete Mar-15 14 / 15 : +12%
15 / 16 : + 12%
16 / 17 : + 12%.
London running at capacity for a number of years now, 12% increase in volumes
across the country.
Concrete Mar-15 14 / 15 : + 9.9%
15 / 16 : + 9.9%
16 / 17 : + 9.9%.
Concrete prices in London have risen by £9.00 / m3 in the last year
Aggregates Mar-15 14 / 15: +5-6% Due to wage inflation, increasing logistics costs due to demand, and a desire to
increase current margins, we will be looking to increase prices between 5 & 6%,
across the coming months.
Specialist mixes and complex aggregate designs are requiring a higher quality of
aggregate imported from Europe instead of the UK driving up costs.
SUPPLY CHAIN – CONCRETE AND AGGREGATES
© Laing O’Rourke 2014, all rights reserved.31
SUPPLY CHAIN – FACADES
Trade Date Escalation (%/£) Movement Comments
Facades - Aluminium Mar-15 2015 - +5% Material prices have been fairly steady for some time now despite movements within
the LME. Last quarter we were forecasting a 12 month rise of 10%, however we are now
led to believe that this will be nearer 5%.
Facades - Glass Mar-15 2015 - +5% We do see some horror figures from some of the glass producers, but they seem to
diminish and be diluted to sensible figures when in the hands of the unit
manufacturers. Again, we see a 5% rise in the cost of glass in the next 12 months.
Facades Mar-15 2015: +5% ‘The current market price is too low. The market is recovering and we will be putting 3 -
5% on prices to improve our position from a margin perspective.’ Seeing increases of
15-20% across the last 48 months on SC installation gangs.
 One of the Tier 1 Specialists will not work outside of the M25. Their view is
that there are so many opportunities available to them within the London
area, and mainly central London, that they do not need to consider
opportunities beyond this.
 Terms and Conditions are becoming more of a challenge as the specialists,
particularly the Tier 1’s, will not accept ‘back to back’ conditions with the
Main Contract.
 The requirements for mobilisation payments (between 5-10%) are becoming
increasingly requested, particularly with the Tier 1 & 2’s.
© Laing O’Rourke 2014, all rights reserved.32
SUPPLY CHAIN – FACADES AND ENVELOPE LABOUR
Trade Date Escalation (%/£) Movement Comments
Facades - Labour Mar-15 2015: +100% - Labour
escalation
12 months ago, we were was paying 100% less per m2 for Installation crews.
There is not enough capacity in the market to build out everything that is currently
being bid and in the pipeline.’
Facades - Labour Apr-15 +10-20% - Labour escalation Specialist labour costs have risen by 10% across the past year. Prices for Sub-
Contract installation gangs are increasing rapidly as demand increases. Prices here
have risen by 20% in the last year.
Facades - Labour (Hot melt) Jun-15 +100% - Labour escalation In the last 12 months, the labour rates from Hot Melt operations has increased by
100%.
© Laing O’Rourke 2014, all rights reserved.33
Trade Date Escalation (%/£) Movement Comments
Lifts and Escalators Sep-14 2014 / 15: +3-5% With increasing costs and a desire to increase profitability with the market trending
up, this is an appropriate time to increase our prices, & ties in with a company global
approach to this.
Lifts and Escalators Mar-15 2014 / 15: +5-6%
2015 / 16: +5-6%
Labour: +5%
Capacity is going to be a problem for Lifts & Escalators in the next 2/3 years. They are
being very selective in what they will price / take on.
Mitsubishi only really operate in the high end / high rise residential market. Otis are
operating around their ‘standard product’ & will not do a lot of bespoke, & Thyssen
they see are practically out of the new / install market, concentrating on maintenance
in the UK. Hence capacity issues going forward
Lifts and Escalators May-15 2014 / 15: +3% Capacity :
Starting to be a challenge, especially in design. For standard lift solutions, capacity is
not a problem, but for bespoke solutions, design resource /capacity is a challenge and
we are starting to be selective about which projects they bid where bespoke solutions
are required. In terms of labour, we are recruiting heavily, both in the UK & Europe,
and they are also increasing their apprenticeship programme quite significantly.
Lifts and Escalators May-15 2014 / 15: +3% Escalation / Inflation : Labour increases, through Union deals, are currently being
maintained at around 3%. Maintenance and / or recruitment of design / technical
staff is more of a challenge. Poaching is rife, & increases for this level of staff are
high percentages. They are currently closely managing material price inflation &
keeping it at reasonable market levels. From a margin perspective, whilst they are
looking to move margins up, there is no major push or availability to do this in the
construction market, however this is offset by the maintenance market which is still
doing well.
SUPPLY CHAIN – LIFTS AND ESCALATORS
 Capacity of the market has reduced significantly and lead in times have increased since Transport for London
signed a deal (Pan TfL) with Kone (Lifts) and Otis (Escalators) to provide all Lifts and Escalators on the
Underground, Crossrail and Northern Line extension projects.
 New lift regulations are coming into force in 2017 which are also starting to impact upon the cost of tender
values.
© Laing O’Rourke 2014, all rights reserved.34
SUPPLY CHAIN – RESOURCE CHALLENGE
Trade Date Escalation (%/£) Movement Comments
Labour - Doors & Ironmongery Sep-14 2015: +3-5% The biggest issue they see within the joinery market is a skill shortage. The availability
of labour will be fine, however, due to the amount of skilled labour leaving the
industry during the recession it means that a lot of the labour force will be
apprentices as the market begins to pick up. This will give us a different challenge in
terms of quality and productivity
Labour - Drivers Sep-14 +10% Select having to up the driver rates in the region of 10% which has been a direct
project cost, this is only going one way as the resource gets more scarce.
Drylining and Ceilings - Labour Mar-15 2014 / 15: +15%
2015 / 16: +10%
Enquiry levels are in the region of double what they were 12 months ago to an extent
where we are having to be very specific and selective in what tenders we price. We are
turning down as many as tendering opportunities as we are pricing at present.
Drylining - Labour Apr-15 2014 / 15: +10%
2015 / 16: +20%
Labour prices are now between £140 and £200 per day. The labour is very unstable
with people leaving as soon as they don’t get price work and get stuck on dayworks.
Current thoughts are huge shortages in the summer when the eastern europeans go
home for summer holidays and potential for another 10% to 20% rise in labour rates
over the next year.
Carpentry & Joinery - Labour May-15 2014 / 15: +20-35% Carpentry & Joinery – Labour rates circa £150 per day but likely to rise to £180 / £200
by end of this year.
Floor layers - Labour May-15 2014 / 15: +25% Floor layers – currently demanding £200 per day and likely to increase to £250 per
day in the summer.
© Laing O’Rourke 2014, all rights reserved.35
SUPPLY CHAIN - SUMMARY
QUESTIONS
1. Is 3-5% the right amount to be including within our budgets / cost plans for inflation?
2. Have we factored in the impact of market opportunities?
3. Have we factored in organisational aspirations to make a profit?
4. What can we do as an industry to negate these risks?
© Laing O’Rourke 2014, all rights reserved.36
LAING O’ROURKE – ALTERNATIVE PROCUREMENT
© Laing O’Rourke 2014, all rights reserved.37
MOVING FORWARD…
EXTERNAL SUPPLY CHAIN
• Growth expectations tempered by market capacity
• Digital Engineering – Use BIM as a catalyst to drive value
• Are our Supply Chain ready for this?
• Collaboration with our peers on how we can achieve our Level 2 goal and beyond.
• Design and Quality – Need to refocus:
• Need our Supply Chain friends and partners to support in the delivery of zero defects.
• DfMA – Reduce labour levels and enhance quality
• Not only a LOR philosophy. We want our Supply Chain to shape this philosophy with us
• Excellent Supply Chain Relationships focused around top 300 strategic supply chain:
• 1,200nr relationship meetings per annum
• Want to become ‘Contractor of 1st choice’ with differentiated price
• Diversity: Ensuring more Women enter into the Construction industry
• Training and development
• Apprentice numbers increasing across a range of skillsets including Digital Engineering
• Graduates and Cadets – Highest ever – 175nr per annum
© Laing O’Rourke 2014, all rights reserved.38
Procurement & Supply Chain
An Employers Perspective
July 2015
delivered over
£250m
of savings on materials and
labour
Transacted over
£1.25billion
of construction projects
Worked with over300
social landlords and contractors
My Experience – Construction/ Valueworks
Placed over160
frameworks & contracts
Employer Concerns - Market
• Inflation & Costs
• Legislation – Impact
• Economy
• Social Value - Inclusion
• Capacity - Shortage
• Public Procurement (OJEU) - Engagement
Employer Concerns - Contractor
• Price v Cost
- Difference between ‘bid and invoice’
• Quality
• Capacity
• Capability
• Direct Employment
• Social Value
• Engagement (OJEU)
• Form of Contract
• Timescales
Arriving at the right price - Tendering
• Budget/ Business Case
• Specification and Scope
• Pricing structure
• Capacity
• Capability
• Timescales
…expectation that the
‘invoice will match the bid’
Sub-Contractors
Materials
Main Contractor
…without thinking about procurement beyond that
Often with contractors:
• Less than 25% of expenditure managed by Procurement department
• User-Buyer structures – labour expenditure through QS’s
• Systems which aren’t configured properly – Poor Data
• Lack of policy, planning and process
• Lack of compliance/ control – sites doing their own thing
• Supply chain payment
• Untested markets – up to 5 years
• Contract drift and monthly ‘maintenance’ fees
• Waste and fraud
• Focus on ‘price’ and not ‘cost’…
Reduces margin…increases cost…drives variation
Not just the traditional measures…
• But how the contractors procure and manage their supply chains
• Aggregation
• Strategic relationships
• Direct procurement of materials
• ‘Price v Cost’
• Compliance - (Sites/ Requisitioners/ Product)
• Waste/ Fraud
• Process Efficiency & Effectiveness
• Administration (system based)
• Transparency - Management Information
• Cultural alignment
• Frameworks aren’t the ‘be all’
Employers - more rigorous at selection
Summary
• The Market functions in a certain way…if you don’t change then
neither will the outcome
• Employers should be more rigorous/ thoughtful at selection
• Bid costs aren’t so important…invoices are
• If contractors can’t manage their supply chain…costs will rise which
drives variation
• Be strategic
• Strive for Transparency
• Cultural alignment is important
Q & A

More Related Content

What's hot

Paul Cain FlexEnable Cambridge Investment Research Events
Paul Cain FlexEnable Cambridge Investment Research EventsPaul Cain FlexEnable Cambridge Investment Research Events
Paul Cain FlexEnable Cambridge Investment Research EventsJustin Hayward
 
CONCHEM TECHNOLOGY SERVICES
CONCHEM TECHNOLOGY SERVICESCONCHEM TECHNOLOGY SERVICES
CONCHEM TECHNOLOGY SERVICESAnand Iyer
 
Luis Garza - Changing the way people find experts at CEMEX
Luis Garza - Changing the way people find experts at CEMEXLuis Garza - Changing the way people find experts at CEMEX
Luis Garza - Changing the way people find experts at CEMEXLetsConnect
 
LACE Project WP5 - Learning Analytics & Performance Support for Manufacturing...
LACE Project WP5 - Learning Analytics & Performance Support for Manufacturing...LACE Project WP5 - Learning Analytics & Performance Support for Manufacturing...
LACE Project WP5 - Learning Analytics & Performance Support for Manufacturing...Fabrizio Cardinali
 
POAT 2012 - 2015.Presentation on partenariati pubblico privati in Horizon 202...
POAT 2012 - 2015.Presentation on partenariati pubblico privati in Horizon 202...POAT 2012 - 2015.Presentation on partenariati pubblico privati in Horizon 202...
POAT 2012 - 2015.Presentation on partenariati pubblico privati in Horizon 202...formezeu
 
Overcoming Challenges, Leveraging Opportunities: Economic Policy & Regulation...
Overcoming Challenges, Leveraging Opportunities: Economic Policy & Regulation...Overcoming Challenges, Leveraging Opportunities: Economic Policy & Regulation...
Overcoming Challenges, Leveraging Opportunities: Economic Policy & Regulation...Thierry Rayna
 
Rabobank Construction Update August 2015
Rabobank Construction Update August 2015Rabobank Construction Update August 2015
Rabobank Construction Update August 2015Leontien de Waal MSc
 
Digital Printing for the Packaging Industry by Justin Hayward CIR
Digital Printing for the Packaging Industry by Justin Hayward CIRDigital Printing for the Packaging Industry by Justin Hayward CIR
Digital Printing for the Packaging Industry by Justin Hayward CIRJustin Hayward
 
Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Eric Janvier
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingcmb80
 
Continuous Intelligence: Keeping Your AI Application in Production (NDC Sydne...
Continuous Intelligence: Keeping Your AI Application in Production (NDC Sydne...Continuous Intelligence: Keeping Your AI Application in Production (NDC Sydne...
Continuous Intelligence: Keeping Your AI Application in Production (NDC Sydne...Dr. Arif Wider
 
Chris Freeman (AMRC w/Boeing): Visualisation Driven Manufacturing
Chris Freeman (AMRC w/Boeing): Visualisation Driven ManufacturingChris Freeman (AMRC w/Boeing): Visualisation Driven Manufacturing
Chris Freeman (AMRC w/Boeing): Visualisation Driven ManufacturingAugmentedWorldExpo
 
Lightweight Vehicle Manufacturing: Joining & Forming Focus 2015
Lightweight Vehicle Manufacturing: Joining & Forming Focus 2015Lightweight Vehicle Manufacturing: Joining & Forming Focus 2015
Lightweight Vehicle Manufacturing: Joining & Forming Focus 2015marketinglbcg
 
Adaptive Learning for Zero Defects in Building Construction #SPRAConference2019
Adaptive Learning for Zero Defects in Building Construction #SPRAConference2019Adaptive Learning for Zero Defects in Building Construction #SPRAConference2019
Adaptive Learning for Zero Defects in Building Construction #SPRAConference2019SPRA: The Single Ply Roofing Association
 
Shaping the Future of Construction - World Economic Forum Report 2016
Shaping the Future of Construction - World Economic Forum Report 2016Shaping the Future of Construction - World Economic Forum Report 2016
Shaping the Future of Construction - World Economic Forum Report 2016Turlough Guerin GAICD FGIA
 
How BIM is Transforming the Design and Construction Industry
How BIM is Transforming the Design and Construction IndustryHow BIM is Transforming the Design and Construction Industry
How BIM is Transforming the Design and Construction IndustryGreg Dolphin
 

What's hot (18)

Paul Cain FlexEnable Cambridge Investment Research Events
Paul Cain FlexEnable Cambridge Investment Research EventsPaul Cain FlexEnable Cambridge Investment Research Events
Paul Cain FlexEnable Cambridge Investment Research Events
 
CONCHEM TECHNOLOGY SERVICES
CONCHEM TECHNOLOGY SERVICESCONCHEM TECHNOLOGY SERVICES
CONCHEM TECHNOLOGY SERVICES
 
Luis Garza - Changing the way people find experts at CEMEX
Luis Garza - Changing the way people find experts at CEMEXLuis Garza - Changing the way people find experts at CEMEX
Luis Garza - Changing the way people find experts at CEMEX
 
LACE Project WP5 - Learning Analytics & Performance Support for Manufacturing...
LACE Project WP5 - Learning Analytics & Performance Support for Manufacturing...LACE Project WP5 - Learning Analytics & Performance Support for Manufacturing...
LACE Project WP5 - Learning Analytics & Performance Support for Manufacturing...
 
POAT 2012 - 2015.Presentation on partenariati pubblico privati in Horizon 202...
POAT 2012 - 2015.Presentation on partenariati pubblico privati in Horizon 202...POAT 2012 - 2015.Presentation on partenariati pubblico privati in Horizon 202...
POAT 2012 - 2015.Presentation on partenariati pubblico privati in Horizon 202...
 
Ncc construction DK, Strategy
Ncc construction DK, StrategyNcc construction DK, Strategy
Ncc construction DK, Strategy
 
Overcoming Challenges, Leveraging Opportunities: Economic Policy & Regulation...
Overcoming Challenges, Leveraging Opportunities: Economic Policy & Regulation...Overcoming Challenges, Leveraging Opportunities: Economic Policy & Regulation...
Overcoming Challenges, Leveraging Opportunities: Economic Policy & Regulation...
 
Rabobank Construction Update August 2015
Rabobank Construction Update August 2015Rabobank Construction Update August 2015
Rabobank Construction Update August 2015
 
Benchmarking and productivity
Benchmarking and productivityBenchmarking and productivity
Benchmarking and productivity
 
Digital Printing for the Packaging Industry by Justin Hayward CIR
Digital Printing for the Packaging Industry by Justin Hayward CIRDigital Printing for the Packaging Industry by Justin Hayward CIR
Digital Printing for the Packaging Industry by Justin Hayward CIR
 
Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefing
 
Continuous Intelligence: Keeping Your AI Application in Production (NDC Sydne...
Continuous Intelligence: Keeping Your AI Application in Production (NDC Sydne...Continuous Intelligence: Keeping Your AI Application in Production (NDC Sydne...
Continuous Intelligence: Keeping Your AI Application in Production (NDC Sydne...
 
Chris Freeman (AMRC w/Boeing): Visualisation Driven Manufacturing
Chris Freeman (AMRC w/Boeing): Visualisation Driven ManufacturingChris Freeman (AMRC w/Boeing): Visualisation Driven Manufacturing
Chris Freeman (AMRC w/Boeing): Visualisation Driven Manufacturing
 
Lightweight Vehicle Manufacturing: Joining & Forming Focus 2015
Lightweight Vehicle Manufacturing: Joining & Forming Focus 2015Lightweight Vehicle Manufacturing: Joining & Forming Focus 2015
Lightweight Vehicle Manufacturing: Joining & Forming Focus 2015
 
Adaptive Learning for Zero Defects in Building Construction #SPRAConference2019
Adaptive Learning for Zero Defects in Building Construction #SPRAConference2019Adaptive Learning for Zero Defects in Building Construction #SPRAConference2019
Adaptive Learning for Zero Defects in Building Construction #SPRAConference2019
 
Shaping the Future of Construction - World Economic Forum Report 2016
Shaping the Future of Construction - World Economic Forum Report 2016Shaping the Future of Construction - World Economic Forum Report 2016
Shaping the Future of Construction - World Economic Forum Report 2016
 
How BIM is Transforming the Design and Construction Industry
How BIM is Transforming the Design and Construction IndustryHow BIM is Transforming the Design and Construction Industry
How BIM is Transforming the Design and Construction Industry
 

Viewers also liked (8)

Procurement process outsourcing how it works
Procurement process outsourcing   how it worksProcurement process outsourcing   how it works
Procurement process outsourcing how it works
 
Procurement plan
Procurement planProcurement plan
Procurement plan
 
Detlef Schultz, Group Supply Chain Management Director at Vodafone Procuremen...
Detlef Schultz, Group Supply Chain Management Director at Vodafone Procuremen...Detlef Schultz, Group Supply Chain Management Director at Vodafone Procuremen...
Detlef Schultz, Group Supply Chain Management Director at Vodafone Procuremen...
 
Procurement process system and capability building
Procurement process system and capability buildingProcurement process system and capability building
Procurement process system and capability building
 
Procurement plan-template-1.2
Procurement plan-template-1.2Procurement plan-template-1.2
Procurement plan-template-1.2
 
Procurement process Atlas Honda Ltd
Procurement process Atlas Honda LtdProcurement process Atlas Honda Ltd
Procurement process Atlas Honda Ltd
 
procurement plan details
procurement plan detailsprocurement plan details
procurement plan details
 
Procurement Plan
Procurement PlanProcurement Plan
Procurement Plan
 

Similar to FBE Manchester Procurement Event Supply Chain Importance

RICS VIP RT _ Briefing Paper (V3.1) SME
RICS VIP RT _ Briefing Paper (V3.1) SMERICS VIP RT _ Briefing Paper (V3.1) SME
RICS VIP RT _ Briefing Paper (V3.1) SMEChris Williams-Lilley
 
EI CITA BIM Transition Survey
EI CITA BIM Transition SurveyEI CITA BIM Transition Survey
EI CITA BIM Transition SurveyJohn Hunt
 
Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018Comit Projects Ltd
 
Managing Growth in Advanced Manufacturing
Managing Growth in Advanced ManufacturingManaging Growth in Advanced Manufacturing
Managing Growth in Advanced ManufacturingLes Murray
 
Digital Transformation 2018
Digital Transformation 2018Digital Transformation 2018
Digital Transformation 2018Aconex
 
Aftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoullAftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoullCopperberg
 
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...Moustafa Ismail Abu Dief
 
UtiliVATION - Utility Innovation - Indigo Advisory Group
UtiliVATION - Utility Innovation - Indigo Advisory GroupUtiliVATION - Utility Innovation - Indigo Advisory Group
UtiliVATION - Utility Innovation - Indigo Advisory GroupIndigo Advisory Group
 
Lessons Learned Don’t Work: Why a Data Centric Approach May Hold the Key
Lessons Learned Don’t Work: Why a Data Centric Approach May Hold the KeyLessons Learned Don’t Work: Why a Data Centric Approach May Hold the Key
Lessons Learned Don’t Work: Why a Data Centric Approach May Hold the KeyMartin Paver
 
Digitally Building Britain #COMIT2016
Digitally Building Britain #COMIT2016Digitally Building Britain #COMIT2016
Digitally Building Britain #COMIT2016Comit Projects Ltd
 
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Steelhenge
 
Promoting Collaborative Behaviours in the Engineering Construction Industry w...
Promoting Collaborative Behaviours in the Engineering Construction Industry w...Promoting Collaborative Behaviours in the Engineering Construction Industry w...
Promoting Collaborative Behaviours in the Engineering Construction Industry w...Association for Project Management
 
Case study A fresh approach of theBalanced Scorecard in the.docx
Case study A fresh approach of theBalanced Scorecard in the.docxCase study A fresh approach of theBalanced Scorecard in the.docx
Case study A fresh approach of theBalanced Scorecard in the.docxtidwellveronique
 
Lecture on Innovation & Cost Saving Strategies in Facilities Management
Lecture on Innovation & Cost Saving Strategies in Facilities ManagementLecture on Innovation & Cost Saving Strategies in Facilities Management
Lecture on Innovation & Cost Saving Strategies in Facilities ManagementWhitbags
 
AVEVA ProCon FPSO Europe Congress 2016
AVEVA ProCon FPSO Europe Congress 2016AVEVA ProCon FPSO Europe Congress 2016
AVEVA ProCon FPSO Europe Congress 2016AVEVA ProCon
 
Successful change - good culture and governance matter Conference - Boris Luc...
Successful change - good culture and governance matter Conference - Boris Luc...Successful change - good culture and governance matter Conference - Boris Luc...
Successful change - good culture and governance matter Conference - Boris Luc...Association for Project Management
 
National BIM Conference 2015 - JHunt
National BIM Conference 2015 - JHuntNational BIM Conference 2015 - JHunt
National BIM Conference 2015 - JHuntJohn Hunt
 
Allianz construction (part one) - Market Outlook and Issues
Allianz construction (part one) - Market Outlook and IssuesAllianz construction (part one) - Market Outlook and Issues
Allianz construction (part one) - Market Outlook and IssuesGraeme Cross
 

Similar to FBE Manchester Procurement Event Supply Chain Importance (20)

RICS VIP RT _ Briefing Paper (V3.1) SME
RICS VIP RT _ Briefing Paper (V3.1) SMERICS VIP RT _ Briefing Paper (V3.1) SME
RICS VIP RT _ Briefing Paper (V3.1) SME
 
EI CITA BIM Transition Survey
EI CITA BIM Transition SurveyEI CITA BIM Transition Survey
EI CITA BIM Transition Survey
 
PCPMar2015
PCPMar2015PCPMar2015
PCPMar2015
 
Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018
 
Managing Growth in Advanced Manufacturing
Managing Growth in Advanced ManufacturingManaging Growth in Advanced Manufacturing
Managing Growth in Advanced Manufacturing
 
Digital Transformation 2018
Digital Transformation 2018Digital Transformation 2018
Digital Transformation 2018
 
Aftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoullAftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoull
 
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
 
UtiliVATION - Utility Innovation - Indigo Advisory Group
UtiliVATION - Utility Innovation - Indigo Advisory GroupUtiliVATION - Utility Innovation - Indigo Advisory Group
UtiliVATION - Utility Innovation - Indigo Advisory Group
 
Lessons Learned Don’t Work: Why a Data Centric Approach May Hold the Key
Lessons Learned Don’t Work: Why a Data Centric Approach May Hold the KeyLessons Learned Don’t Work: Why a Data Centric Approach May Hold the Key
Lessons Learned Don’t Work: Why a Data Centric Approach May Hold the Key
 
Digitally Building Britain #COMIT2016
Digitally Building Britain #COMIT2016Digitally Building Britain #COMIT2016
Digitally Building Britain #COMIT2016
 
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
 
EPPM Presentation_Final
EPPM Presentation_FinalEPPM Presentation_Final
EPPM Presentation_Final
 
Promoting Collaborative Behaviours in the Engineering Construction Industry w...
Promoting Collaborative Behaviours in the Engineering Construction Industry w...Promoting Collaborative Behaviours in the Engineering Construction Industry w...
Promoting Collaborative Behaviours in the Engineering Construction Industry w...
 
Case study A fresh approach of theBalanced Scorecard in the.docx
Case study A fresh approach of theBalanced Scorecard in the.docxCase study A fresh approach of theBalanced Scorecard in the.docx
Case study A fresh approach of theBalanced Scorecard in the.docx
 
Lecture on Innovation & Cost Saving Strategies in Facilities Management
Lecture on Innovation & Cost Saving Strategies in Facilities ManagementLecture on Innovation & Cost Saving Strategies in Facilities Management
Lecture on Innovation & Cost Saving Strategies in Facilities Management
 
AVEVA ProCon FPSO Europe Congress 2016
AVEVA ProCon FPSO Europe Congress 2016AVEVA ProCon FPSO Europe Congress 2016
AVEVA ProCon FPSO Europe Congress 2016
 
Successful change - good culture and governance matter Conference - Boris Luc...
Successful change - good culture and governance matter Conference - Boris Luc...Successful change - good culture and governance matter Conference - Boris Luc...
Successful change - good culture and governance matter Conference - Boris Luc...
 
National BIM Conference 2015 - JHunt
National BIM Conference 2015 - JHuntNational BIM Conference 2015 - JHunt
National BIM Conference 2015 - JHunt
 
Allianz construction (part one) - Market Outlook and Issues
Allianz construction (part one) - Market Outlook and IssuesAllianz construction (part one) - Market Outlook and Issues
Allianz construction (part one) - Market Outlook and Issues
 

More from FBE Manchester

Fbe manchester the agents perspective 24th march 17
Fbe manchester the agents perspective 24th march 17Fbe manchester the agents perspective 24th march 17
Fbe manchester the agents perspective 24th march 17FBE Manchester
 
FBE Manchester - Wellness in the Workplace - 19th July 2016
FBE Manchester - Wellness in the Workplace - 19th July 2016FBE Manchester - Wellness in the Workplace - 19th July 2016
FBE Manchester - Wellness in the Workplace - 19th July 2016FBE Manchester
 
Fbe manchester energy event nov 2015
Fbe manchester energy event nov 2015Fbe manchester energy event nov 2015
Fbe manchester energy event nov 2015FBE Manchester
 
Steve fraser managing director fbe presentation
Steve fraser managing director fbe presentationSteve fraser managing director fbe presentation
Steve fraser managing director fbe presentationFBE Manchester
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentationFBE Manchester
 
The Agents Perspective Fbe breakfast 26-02-2015
The Agents Perspective Fbe breakfast 26-02-2015The Agents Perspective Fbe breakfast 26-02-2015
The Agents Perspective Fbe breakfast 26-02-2015FBE Manchester
 
The Changing Face of Local Authorities - Mark Widdup, Director of Economy and...
The Changing Face of Local Authorities - Mark Widdup, Director of Economy and...The Changing Face of Local Authorities - Mark Widdup, Director of Economy and...
The Changing Face of Local Authorities - Mark Widdup, Director of Economy and...FBE Manchester
 
The Changing Face of Local Authorities - Theresa Grant, Chief Executive, Traf...
The Changing Face of Local Authorities - Theresa Grant, Chief Executive, Traf...The Changing Face of Local Authorities - Theresa Grant, Chief Executive, Traf...
The Changing Face of Local Authorities - Theresa Grant, Chief Executive, Traf...FBE Manchester
 

More from FBE Manchester (8)

Fbe manchester the agents perspective 24th march 17
Fbe manchester the agents perspective 24th march 17Fbe manchester the agents perspective 24th march 17
Fbe manchester the agents perspective 24th march 17
 
FBE Manchester - Wellness in the Workplace - 19th July 2016
FBE Manchester - Wellness in the Workplace - 19th July 2016FBE Manchester - Wellness in the Workplace - 19th July 2016
FBE Manchester - Wellness in the Workplace - 19th July 2016
 
Fbe manchester energy event nov 2015
Fbe manchester energy event nov 2015Fbe manchester energy event nov 2015
Fbe manchester energy event nov 2015
 
Steve fraser managing director fbe presentation
Steve fraser managing director fbe presentationSteve fraser managing director fbe presentation
Steve fraser managing director fbe presentation
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentation
 
The Agents Perspective Fbe breakfast 26-02-2015
The Agents Perspective Fbe breakfast 26-02-2015The Agents Perspective Fbe breakfast 26-02-2015
The Agents Perspective Fbe breakfast 26-02-2015
 
The Changing Face of Local Authorities - Mark Widdup, Director of Economy and...
The Changing Face of Local Authorities - Mark Widdup, Director of Economy and...The Changing Face of Local Authorities - Mark Widdup, Director of Economy and...
The Changing Face of Local Authorities - Mark Widdup, Director of Economy and...
 
The Changing Face of Local Authorities - Theresa Grant, Chief Executive, Traf...
The Changing Face of Local Authorities - Theresa Grant, Chief Executive, Traf...The Changing Face of Local Authorities - Theresa Grant, Chief Executive, Traf...
The Changing Face of Local Authorities - Theresa Grant, Chief Executive, Traf...
 

Recently uploaded

Make Charity for Poor Students to Strong Kurnool
Make Charity for Poor Students to Strong KurnoolMake Charity for Poor Students to Strong Kurnool
Make Charity for Poor Students to Strong KurnoolSERUDS INDIA
 
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170Sonam Pathan
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxjennysansano2
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...Christina Parmionova
 
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleSERUDS INDIA
 
Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingSERUDS INDIA
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfyalehistoricalreview
 
In credit? Assessing where Universal Credit’s long rollout has left the benef...
In credit? Assessing where Universal Credit’s long rollout has left the benef...In credit? Assessing where Universal Credit’s long rollout has left the benef...
In credit? Assessing where Universal Credit’s long rollout has left the benef...ResolutionFoundation
 
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...saminamagar
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Sonam Pathan
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOMAIRIEORGERUS
 
Swachh Bharat Abhiyan: Transforming India Towards a Cleaner Future
Swachh Bharat Abhiyan: Transforming India Towards a Cleaner FutureSwachh Bharat Abhiyan: Transforming India Towards a Cleaner Future
Swachh Bharat Abhiyan: Transforming India Towards a Cleaner FutureAnkitRaj274827
 
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfKatrina Sriranpong
 

Recently uploaded (20)

Make Charity for Poor Students to Strong Kurnool
Make Charity for Poor Students to Strong KurnoolMake Charity for Poor Students to Strong Kurnool
Make Charity for Poor Students to Strong Kurnool
 
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
Call Girls In Pullman Hotel New Delhi Aerocity 9873777170
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptx
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
 
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Yamuna Pushta DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor People
 
Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donating
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
 
In credit? Assessing where Universal Credit’s long rollout has left the benef...
In credit? Assessing where Universal Credit’s long rollout has left the benef...In credit? Assessing where Universal Credit’s long rollout has left the benef...
In credit? Assessing where Universal Credit’s long rollout has left the benef...
 
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
call girls in Mayur Vihar Phase III DELHI 🔝 >༒9540349809 🔝 genuine Escort Ser...
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
 
Swachh Bharat Abhiyan: Transforming India Towards a Cleaner Future
Swachh Bharat Abhiyan: Transforming India Towards a Cleaner FutureSwachh Bharat Abhiyan: Transforming India Towards a Cleaner Future
Swachh Bharat Abhiyan: Transforming India Towards a Cleaner Future
 
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
 

FBE Manchester Procurement Event Supply Chain Importance

  • 2. FORUM FOR THE BUILT ENVIRONMENT PROCUREMENT EVENT Importance of the Supply Chain 23 July 2015 Professor Rudi Klein CEO, SEC Group President, NEC Users’ Group
  • 3. 3 QUESTION If the decision was left entirely to you would you procure a building in the way depicted in the diagram in the next slide?
  • 4. 4 d Design team Tier 1 contractor Tier 2 contractor Tier 3 contractor Tier 4 contractor Tier 5 contractor Tier 6 contractor
  • 5.  KPIs produced by Constructing Excellence over decade 2000-2010 failed to show sustained improvements in cost, predictability, productivity and profitability.  UK construction costs amongst the highest in EU £ 5
  • 6. 6 Lowest in Belgium, Germany and Scandinavia WHY?  Greater integration of design and construction.  Extensive industrialisation of delivery process.  Limited scale of sub-contracting and more harmonious supply chains.  Greater application of lean techniques.  Well-paid, well-trained and highly productive workforce. Source: EU Pilot Study Benchmarking Construction Costs in Member States by Bernard Williams Associates (March 2006).
  • 7. 7 ANSWER: CONSTRUCTION SUPPLY CHAINS ARE DYSFUNCTIONAL LIFTS THEY COMPRISE SMALL DISCRETE UNITS WHICH DO NOT COME TOGETHER AS PART OF A CHAIN.
  • 8.  50-70 tier 2 contractors/suppliers not uncommon.  Typically 25% of tier 2 contracts on large projects with a value in excess of £15m are for values below £10,000!  On all projects, between 50% and 75% of the total value is accounted for by a small number of tier 2 contractors and tier 1 contractor site management team. 8
  • 9.  But the delivery of the major tier 2 packages is undertaken by a disaggregated tier 3 supply chain.  Even at the level of tier 3 contracting the work carried out is often complex involving design, logistics, high-tech components and systems, coordination and integration with other trades. SOURCE: BIS Research Paper No.145: Supply Chain Analysis into the Construction Industry, October 2013 (research carried out by EC Harris). 9
  • 10.  High transaction costs.  The extent of the fragmentation in the supply chain militates against collaborative effort and waste reduction.  Duplication of multiple layers of profit, overhead and risk is a major source of non-value added cost and waste.  High cost of managing and coordinating interfaces.  Little scope for innovation in the supply chain. 10
  • 11. 11 COST TARGET 33% reduction in capital and whole life costs by 2025*. Achievable? *based on 2009/10 government cost benchmarks
  • 12. 12 THE 4 “FLOWS”! information flow product flow Cash flow people flow (ie teamwork)
  • 13.  A supply chain should be project focussed with a full understanding of the client’s objectives.  A supply chain is a resource to support effective and efficient management of the delivery process; there needs to be channels of communication to share ideas, options and to resolve problems.  A supply chain plays a key role in risk management – not risk dumping! (e.g. in addressing material shortages, labour/skills shortages delays and price hikes) 13
  • 14.  A supply chain comprises competent firms that have demonstrated their technical proficiencies and are primarily selected for their ability to deliver.  A supply chain comprises firms having a mutual commitment to work together without recrimination to achieve the best for project outcomes for the client. 14
  • 15.  More reports and initiatives.  More official working parties/committees.  Re-inventing of wheels.  Tinkering with existing processes. 15
  • 16.  Implementation of existing solutions,  to integrate the construction delivery process,  thereby, ensuring efficient delivery of outcomes that consistently represent the best value solution for the clients’ expressed success criteria. 16
  • 17. WE MUST AIM TO FULLY INTEGRATE OUR PROCUREMENT DELIVERY PROCESSES  Integrate the delivery team to achieve buy-in to solutions.  Integrate the insurance of risk to bring about a no-blame culture. 17
  • 18.  Integrate the cashflow process (i.e. PBAs).  Integrate the contracts to achieve pro-active risk management within the team.  Integrate the technology through BIM with emphasis on having a common data platform. 18
  • 19.  Enables early supply chain involvement to inform outcomes.  Up to 80% of potential cost savings can be achieved in the early design/planning stages; primarily because design does not take account of the technologies and skills in the supply chain. 19
  • 20.  Places focus on solutions that are best for the project.  Massively improves information flow.  Promotes a flatter delivery process in place of one comprising disconnected and sequential inputs. 20
  • 21.  Within the supply chain there are numerous liability insurance policies covering the same type of risk with the focus on establishing liability.  Integrated project insurance (IPI) is now being trialled as one of the model procurement routes set out in the May 2011 Cabinet Office Construction Strategy.  IPI is a financial loss policy that insures the cost plan provided that it is underpinned by a robust risk management process undertaken by the delivery team. 21
  • 22.  Project bank accounts have now gained momentum throughout the UK.  Environment Agency together with other depts/agencies such as Highways England, Ministry of Justice and DIO is using PBAs.  PBAs promote collaboration through ensuring that each member of the team is paid regularly from the same “pot”. 22
  • 23.  The whole team should be using the same suite of contracts.  If NEC is used the supply chain should be fully engaged in the risk management mechanisms such as contributing to the risk register and participating in risk reduction meetings.  The IPI procurement model is underpinned by an Alliance Contract that embraces the key delivery team members and provides for the governance of the project. 23
  • 24.  BIM is tailor made for project team integration through enabling project participants to buy into design and risk management solutions.  At level 2 BIM the key requirement is a collaborative data platform that allows the team to develop credible data relating to the structure and its performance which, then, can be handed over to the asset manager.  But, traditional procurement and delivery processes are impeding the use of BIM. 24
  • 25.  Change has to be gradual; embedded cultures and business models have to adapt.  The Environment Agency has taken the lead in driving procurement change through greater integration of the delivery processes.  Its use of PBAs and preparedness to trial IPI demonstrate its commitment to achieve more efficient outcomes from utilising the untapped potential in the supply chain. 25
  • 26. FORUM FOR THE BUILT ENVIRONMENT PROCUREMENT EVENT Importance of the Supply Chain 23 July 2015 Professor Rudi Klein CEO, SEC Group President, NEC Users’ Group
  • 27. © Laing O’Rourke 2014, all rights reserved.27 SUPPLY CHAIN CAPACITY ANDY BACON – HEAD OF PROCUREMENT: EUROPEAN HUB
  • 28. © Laing O’Rourke 2014, all rights reserved.28 CONSULTANT VIEW – ‘INFLATION’ Consultant view: - 3-5% Inflation on tender prices Consultant A Consultant B Consultant C Consultant D Consultant E Consultant F UK Average NORTH WEST VIEW
  • 29. © Laing O’Rourke 2014, all rights reserved.29 NORTH WEST – CAPACITY CHALLENGES The number of construction projects underway in Manchester city centre has increased by 10% over the past year. Among the key findings of the study are: • 13 schemes finished since last year • that includes 320,000 sq ft of office space • there were 390,000 sq ft of education and research facilities; built • one hotel was developed in the last year • 212 residential units were built • and 1,457 student beds were created • 23 schemes are currently under construction • the number of construction projects underway is up 10% • there were 15 new starts in the past 12 months
  • 30. © Laing O’Rourke 2014, all rights reserved.30 Trade Date Escalation (%/£) Movement Comments Concrete Mar-15 14 / 15 : +12% 15 / 16 : + 12% 16 / 17 : + 12%. London running at capacity for a number of years now, 12% increase in volumes across the country. Concrete Mar-15 14 / 15 : + 9.9% 15 / 16 : + 9.9% 16 / 17 : + 9.9%. Concrete prices in London have risen by £9.00 / m3 in the last year Aggregates Mar-15 14 / 15: +5-6% Due to wage inflation, increasing logistics costs due to demand, and a desire to increase current margins, we will be looking to increase prices between 5 & 6%, across the coming months. Specialist mixes and complex aggregate designs are requiring a higher quality of aggregate imported from Europe instead of the UK driving up costs. SUPPLY CHAIN – CONCRETE AND AGGREGATES
  • 31. © Laing O’Rourke 2014, all rights reserved.31 SUPPLY CHAIN – FACADES Trade Date Escalation (%/£) Movement Comments Facades - Aluminium Mar-15 2015 - +5% Material prices have been fairly steady for some time now despite movements within the LME. Last quarter we were forecasting a 12 month rise of 10%, however we are now led to believe that this will be nearer 5%. Facades - Glass Mar-15 2015 - +5% We do see some horror figures from some of the glass producers, but they seem to diminish and be diluted to sensible figures when in the hands of the unit manufacturers. Again, we see a 5% rise in the cost of glass in the next 12 months. Facades Mar-15 2015: +5% ‘The current market price is too low. The market is recovering and we will be putting 3 - 5% on prices to improve our position from a margin perspective.’ Seeing increases of 15-20% across the last 48 months on SC installation gangs.  One of the Tier 1 Specialists will not work outside of the M25. Their view is that there are so many opportunities available to them within the London area, and mainly central London, that they do not need to consider opportunities beyond this.  Terms and Conditions are becoming more of a challenge as the specialists, particularly the Tier 1’s, will not accept ‘back to back’ conditions with the Main Contract.  The requirements for mobilisation payments (between 5-10%) are becoming increasingly requested, particularly with the Tier 1 & 2’s.
  • 32. © Laing O’Rourke 2014, all rights reserved.32 SUPPLY CHAIN – FACADES AND ENVELOPE LABOUR Trade Date Escalation (%/£) Movement Comments Facades - Labour Mar-15 2015: +100% - Labour escalation 12 months ago, we were was paying 100% less per m2 for Installation crews. There is not enough capacity in the market to build out everything that is currently being bid and in the pipeline.’ Facades - Labour Apr-15 +10-20% - Labour escalation Specialist labour costs have risen by 10% across the past year. Prices for Sub- Contract installation gangs are increasing rapidly as demand increases. Prices here have risen by 20% in the last year. Facades - Labour (Hot melt) Jun-15 +100% - Labour escalation In the last 12 months, the labour rates from Hot Melt operations has increased by 100%.
  • 33. © Laing O’Rourke 2014, all rights reserved.33 Trade Date Escalation (%/£) Movement Comments Lifts and Escalators Sep-14 2014 / 15: +3-5% With increasing costs and a desire to increase profitability with the market trending up, this is an appropriate time to increase our prices, & ties in with a company global approach to this. Lifts and Escalators Mar-15 2014 / 15: +5-6% 2015 / 16: +5-6% Labour: +5% Capacity is going to be a problem for Lifts & Escalators in the next 2/3 years. They are being very selective in what they will price / take on. Mitsubishi only really operate in the high end / high rise residential market. Otis are operating around their ‘standard product’ & will not do a lot of bespoke, & Thyssen they see are practically out of the new / install market, concentrating on maintenance in the UK. Hence capacity issues going forward Lifts and Escalators May-15 2014 / 15: +3% Capacity : Starting to be a challenge, especially in design. For standard lift solutions, capacity is not a problem, but for bespoke solutions, design resource /capacity is a challenge and we are starting to be selective about which projects they bid where bespoke solutions are required. In terms of labour, we are recruiting heavily, both in the UK & Europe, and they are also increasing their apprenticeship programme quite significantly. Lifts and Escalators May-15 2014 / 15: +3% Escalation / Inflation : Labour increases, through Union deals, are currently being maintained at around 3%. Maintenance and / or recruitment of design / technical staff is more of a challenge. Poaching is rife, & increases for this level of staff are high percentages. They are currently closely managing material price inflation & keeping it at reasonable market levels. From a margin perspective, whilst they are looking to move margins up, there is no major push or availability to do this in the construction market, however this is offset by the maintenance market which is still doing well. SUPPLY CHAIN – LIFTS AND ESCALATORS  Capacity of the market has reduced significantly and lead in times have increased since Transport for London signed a deal (Pan TfL) with Kone (Lifts) and Otis (Escalators) to provide all Lifts and Escalators on the Underground, Crossrail and Northern Line extension projects.  New lift regulations are coming into force in 2017 which are also starting to impact upon the cost of tender values.
  • 34. © Laing O’Rourke 2014, all rights reserved.34 SUPPLY CHAIN – RESOURCE CHALLENGE Trade Date Escalation (%/£) Movement Comments Labour - Doors & Ironmongery Sep-14 2015: +3-5% The biggest issue they see within the joinery market is a skill shortage. The availability of labour will be fine, however, due to the amount of skilled labour leaving the industry during the recession it means that a lot of the labour force will be apprentices as the market begins to pick up. This will give us a different challenge in terms of quality and productivity Labour - Drivers Sep-14 +10% Select having to up the driver rates in the region of 10% which has been a direct project cost, this is only going one way as the resource gets more scarce. Drylining and Ceilings - Labour Mar-15 2014 / 15: +15% 2015 / 16: +10% Enquiry levels are in the region of double what they were 12 months ago to an extent where we are having to be very specific and selective in what tenders we price. We are turning down as many as tendering opportunities as we are pricing at present. Drylining - Labour Apr-15 2014 / 15: +10% 2015 / 16: +20% Labour prices are now between £140 and £200 per day. The labour is very unstable with people leaving as soon as they don’t get price work and get stuck on dayworks. Current thoughts are huge shortages in the summer when the eastern europeans go home for summer holidays and potential for another 10% to 20% rise in labour rates over the next year. Carpentry & Joinery - Labour May-15 2014 / 15: +20-35% Carpentry & Joinery – Labour rates circa £150 per day but likely to rise to £180 / £200 by end of this year. Floor layers - Labour May-15 2014 / 15: +25% Floor layers – currently demanding £200 per day and likely to increase to £250 per day in the summer.
  • 35. © Laing O’Rourke 2014, all rights reserved.35 SUPPLY CHAIN - SUMMARY QUESTIONS 1. Is 3-5% the right amount to be including within our budgets / cost plans for inflation? 2. Have we factored in the impact of market opportunities? 3. Have we factored in organisational aspirations to make a profit? 4. What can we do as an industry to negate these risks?
  • 36. © Laing O’Rourke 2014, all rights reserved.36 LAING O’ROURKE – ALTERNATIVE PROCUREMENT
  • 37. © Laing O’Rourke 2014, all rights reserved.37 MOVING FORWARD… EXTERNAL SUPPLY CHAIN • Growth expectations tempered by market capacity • Digital Engineering – Use BIM as a catalyst to drive value • Are our Supply Chain ready for this? • Collaboration with our peers on how we can achieve our Level 2 goal and beyond. • Design and Quality – Need to refocus: • Need our Supply Chain friends and partners to support in the delivery of zero defects. • DfMA – Reduce labour levels and enhance quality • Not only a LOR philosophy. We want our Supply Chain to shape this philosophy with us • Excellent Supply Chain Relationships focused around top 300 strategic supply chain: • 1,200nr relationship meetings per annum • Want to become ‘Contractor of 1st choice’ with differentiated price • Diversity: Ensuring more Women enter into the Construction industry • Training and development • Apprentice numbers increasing across a range of skillsets including Digital Engineering • Graduates and Cadets – Highest ever – 175nr per annum
  • 38. © Laing O’Rourke 2014, all rights reserved.38
  • 39. Procurement & Supply Chain An Employers Perspective July 2015
  • 40. delivered over £250m of savings on materials and labour Transacted over £1.25billion of construction projects Worked with over300 social landlords and contractors My Experience – Construction/ Valueworks Placed over160 frameworks & contracts
  • 41. Employer Concerns - Market • Inflation & Costs • Legislation – Impact • Economy • Social Value - Inclusion • Capacity - Shortage • Public Procurement (OJEU) - Engagement
  • 42. Employer Concerns - Contractor • Price v Cost - Difference between ‘bid and invoice’ • Quality • Capacity • Capability • Direct Employment • Social Value • Engagement (OJEU) • Form of Contract • Timescales
  • 43. Arriving at the right price - Tendering • Budget/ Business Case • Specification and Scope • Pricing structure • Capacity • Capability • Timescales …expectation that the ‘invoice will match the bid’ Sub-Contractors Materials Main Contractor
  • 44. …without thinking about procurement beyond that Often with contractors: • Less than 25% of expenditure managed by Procurement department • User-Buyer structures – labour expenditure through QS’s • Systems which aren’t configured properly – Poor Data • Lack of policy, planning and process • Lack of compliance/ control – sites doing their own thing • Supply chain payment • Untested markets – up to 5 years • Contract drift and monthly ‘maintenance’ fees • Waste and fraud • Focus on ‘price’ and not ‘cost’… Reduces margin…increases cost…drives variation
  • 45. Not just the traditional measures… • But how the contractors procure and manage their supply chains • Aggregation • Strategic relationships • Direct procurement of materials • ‘Price v Cost’ • Compliance - (Sites/ Requisitioners/ Product) • Waste/ Fraud • Process Efficiency & Effectiveness • Administration (system based) • Transparency - Management Information • Cultural alignment • Frameworks aren’t the ‘be all’ Employers - more rigorous at selection
  • 46. Summary • The Market functions in a certain way…if you don’t change then neither will the outcome • Employers should be more rigorous/ thoughtful at selection • Bid costs aren’t so important…invoices are • If contractors can’t manage their supply chain…costs will rise which drives variation • Be strategic • Strive for Transparency • Cultural alignment is important